National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 73554-73556 [2022-26095]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
73554
Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2327–049. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Great Lakes
Hydro America LLC. (applicant)
requests Commission approval for a
temporary variance from the normal
reservoir elevation to conduct concrete
repairs to the forebay headgate structure
which were identified in the 11th (2019)
Part 12 Inspection Recommendations.
The applicant requests to draw down
the head pond from elevation of 901.4
feet to 897.2 feet (i.e., 4.2 feet from
normal operating level) for a period of
approximately twelve weeks beginning
in June 2023 to dewater the concrete
areas in need of repair. The applicant
would lower the head pond at a rate not
to exceed 3 inches per hour to avoid
potential fish stranding and maintain
the minimum required bypass flow of 6
cubic feet per second via leakage
(consistent with operations during
routine flashboard replacement). Once
the repairs are completed, the head
pond will be refilled at a rate not to
exceed 3 inches per hour. The applicant
requests the temporary variance to
VerDate Sep<11>2014
16:58 Nov 29, 2022
Jkt 259001
remain into effect until the end of
September 2023.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 211, 214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26091 Filed 11–29–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–17–000]
National Fuel Gas Supply Corporation;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on November 18,
2022, National Fuel Gas Supply
Corporation (National Fuel) 6363 Main
Street, Williamsville, New York 14221,
filed in the above referenced docket, a
prior notice request pursuant to sections
157.205, 157.208 and 157.216 of the
Federal Energy Regulatory
Commission’s regulations under the
Natural Gas Act (NGA) and National
Fuel’s blanket certificate issued in
Docket No. CP83–4–000, requesting
authorization to abandon and replace
11.55 miles of 12-inch-diameter bare
steel pipeline (Line Z20) with 20-inch
coated steel pipeline and construct
certain related natural gas facilities
located in Potter County, Pennsylvania.
National Fuel states the proposed
replacement is part of a modernization
program to enhance the reliability and
safety of its system and upsizing the
pipeline will enable it to provide
additional firm transportation service.
The proposed construction is estimated
to cost $33.4 million as more fully
described in the application which is on
file with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov.or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to
Meghan M. Emes, Senior Attorney
National Fuel Gas Supply Corporation,
6363 Main Street, Williamsville, New
York 14221, by telephone at (716) 857–
E:\FR\FM\30NON1.SGM
30NON1
Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices
7004, or by email at emesm@
natfuel.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on January 23, 2023. How
to file protests, motions to intervene,
and comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is January
23, 2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
lotter on DSK11XQN23PROD with NOTICES1
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is January 23,
2023. As described further in Rule 214,
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
2 Persons
VerDate Sep<11>2014
16:58 Nov 29, 2022
Jkt 259001
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before January 23,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–17–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
6 Additionally, you may file your comments
electronically by using the eComment feature,
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
73555
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–17–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Meghan M. Emes, Senior
Attorney National Fuel Gas Supply
Corporation, 6363 Main Street,
Williamsville, New York 14221, or by
email at emesm@natfuel.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
E:\FR\FM\30NON1.SGM
30NON1
73556
Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26095 Filed 11–29–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC22–28–000]
Commission Information Collection
Activities (FERC–511); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission FERC–
511 (Transfer of Hydropower License),
which will be submitted to the Office of
Management and Budget (OMB) for
review. No Comments were received on
the 60-day notice published on
September 21, 2022.
DATES: Comments on the collection of
information are due December 30, 2022.
ADDRESSES: Send written comments on
FERC–511 to OMB through
www.reginfo.gov/public/do/PRAMain.
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB Control Number
(1902–0069) in the subject line of your
comments. Comments should be sent
within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain.
Please submit copies of your
comments to the Commission. You may
submit copies of your comments
(identified by Docket No. IC22–28–000)
by one of the following methods:
Electronic filing through https://
www.ferc.gov, is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery.
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
16:58 Nov 29, 2022
Jkt 259001
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (including courier) delivery:
Deliver to: Federal Energy Regulatory
Commission, Secretary of the
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions: OMB submissions must
be formatted and filed in accordance
with submission guidelines at
www.reginfo.gov/public/do/PRAMain.
Using the search function under the
‘‘Currently Under Review’’ field, select
Federal Energy Regulatory Commission;
click ‘‘submit,’’ and select ‘‘comment’’
to the right of the subject collection.
FERC submissions must be formatted
and filed in accordance with submission
guidelines at: https://www.ferc.gov. For
user assistance, contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at: (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/ferconline/overview.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–511, Transfer of
Hydropower License.1
OMB Control No.: 1902–0069.
Type of Request: Three-year extension
of the FERC–511 information collection
requirements with no changes to the
current reporting and recordkeeping
requirements.
Abstract: The purpose of FERC–511 is
to implement the information
collections pursuant to Section 8 of the
Federal Power Act (FPA) and Code of
Federal Regulations (CFR) under Title
18 CFR part 9 (Transfer of License)
Sections 9.1 through 9.3 and Section
131.20 of the 18 CFR. Section 8 of the
FPA stipulates that no voluntary
transfer of any license, or the rights
thereunder granted, shall be made
without the written approval of the
Commission. Sections 9.1 through 9.3 of
the 18 CFR states that any licensee
(transferor) desiring to transfer a license
and the person, association, corporation,
1 The title is being updated to Transfer of
Hydropower License (rather than Transfer of
Electric License).
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
State, or municipality (transferee)
desiring to acquire the same must
jointly file an application for
Commission’s approval of such transfer.
The application must show that the
transfer is in the public interest and
provide the qualifications of the
transferee to hold such license and to
operate the property under the license.
Approval of the transfer is contingent
upon the transfer of title to the
properties under the license, transfer of
all project files including all dam safety
related documents, and delivery of all
license instruments. The application for
approval of transfer of license must
conform to the requirements of Sections
131.20 of the 18 CFR, which must
include the following: application
statement by all parties; verification
statement; proof of citizenship; evidence
of compliance by the transferor with all
applicable state laws or how the
transferee proposes to comply; and
qualifications of the transferee to hold
the license and operate the project.
The Commission uses the information
collected under the requirements of
FERC–511 to implement the statutory
provisions of Sections 8 of the Federal
Power Act (FPA) and 18 CFR part 9 and
18 CFR 131.20 of the Commission’s
regulations. The information filed with
the Commission is in the format of a
written application for transfer of
license, executed jointly by the parties
of the proposed transfer. The
Commission uses the information
collected to determine the qualifications
of the proposed transferee to hold the
license and to prepare the transfer of the
license order to make its determination.
Type of Respondent: Existing
Hydropower Project Licensees and those
entities wishing to have a Hydropower
Project License transferred to them.
Estimate of Annual Burden: 2 The
Commission estimates the annual
burden and cost 3 for the information
collection as follows.
2 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a federal agency. See 5 CFR
1320 for additional information on the definition of
information collection burden.
3 The FERC 2022 average salary plus benefits for
one FERC full-time equivalent (FTE) is $188,922/
year (or $91.00/hour). Commission staff estimates
that the industry’s skill set (wages and benefits) for
completing and filing FERC–511 is comparable to
the Commission’s skill set.
E:\FR\FM\30NON1.SGM
30NON1
Agencies
[Federal Register Volume 87, Number 229 (Wednesday, November 30, 2022)]
[Notices]
[Pages 73554-73556]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26095]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-17-000]
National Fuel Gas Supply Corporation; Notice of Request Under
Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on November 18, 2022, National Fuel Gas Supply
Corporation (National Fuel) 6363 Main Street, Williamsville, New York
14221, filed in the above referenced docket, a prior notice request
pursuant to sections 157.205, 157.208 and 157.216 of the Federal Energy
Regulatory Commission's regulations under the Natural Gas Act (NGA) and
National Fuel's blanket certificate issued in Docket No. CP83-4-000,
requesting authorization to abandon and replace 11.55 miles of 12-inch-
diameter bare steel pipeline (Line Z20) with 20-inch coated steel
pipeline and construct certain related natural gas facilities located
in Potter County, Pennsylvania. National Fuel states the proposed
replacement is part of a modernization program to enhance the
reliability and safety of its system and upsizing the pipeline will
enable it to provide additional firm transportation service. The
proposed construction is estimated to cost $33.4 million as more fully
described in the application which is on file with the Commission and
open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
Meghan M. Emes, Senior Attorney National Fuel Gas Supply Corporation,
6363 Main Street, Williamsville, New York 14221, by telephone at (716)
857-
[[Page 73555]]
7004, or by email at [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on January 23, 2023.
How to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is January 23, 2023. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is January 23, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before January 23, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-17-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-17-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: Meghan M.
Emes, Senior Attorney National Fuel Gas Supply Corporation, 6363 Main
Street, Williamsville, New York 14221, or by email at
[email protected]. Any subsequent submissions by an intervenor must be
served on the applicant and all other parties to the proceeding.
Contact information for parties can be downloaded from the service list
at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
[[Page 73556]]
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26095 Filed 11-29-22; 8:45 am]