Download as PDF lotter on DSK11XQN23PROD with NOTICES1 73554 Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–2327–049. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Great Lakes Hydro America LLC. (applicant) requests Commission approval for a temporary variance from the normal reservoir elevation to conduct concrete repairs to the forebay headgate structure which were identified in the 11th (2019) Part 12 Inspection Recommendations. The applicant requests to draw down the head pond from elevation of 901.4 feet to 897.2 feet (i.e., 4.2 feet from normal operating level) for a period of approximately twelve weeks beginning in June 2023 to dewater the concrete areas in need of repair. The applicant would lower the head pond at a rate not to exceed 3 inches per hour to avoid potential fish stranding and maintain the minimum required bypass flow of 6 cubic feet per second via leakage (consistent with operations during routine flashboard replacement). Once the repairs are completed, the head pond will be refilled at a rate not to exceed 3 inches per hour. The applicant requests the temporary variance to VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 remain into effect until the end of September 2023. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 211, 214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26091 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–17–000] National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on November 18, 2022, National Fuel Gas Supply Corporation (National Fuel) 6363 Main Street, Williamsville, New York 14221, filed in the above referenced docket, a prior notice request pursuant to sections 157.205, 157.208 and 157.216 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act (NGA) and National Fuel’s blanket certificate issued in Docket No. CP83–4–000, requesting authorization to abandon and replace 11.55 miles of 12-inch-diameter bare steel pipeline (Line Z20) with 20-inch coated steel pipeline and construct certain related natural gas facilities located in Potter County, Pennsylvania. National Fuel states the proposed replacement is part of a modernization program to enhance the reliability and safety of its system and upsizing the pipeline will enable it to provide additional firm transportation service. The proposed construction is estimated to cost $33.4 million as more fully described in the application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov.or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Meghan M. Emes, Senior Attorney National Fuel Gas Supply Corporation, 6363 Main Street, Williamsville, New York 14221, by telephone at (716) 857– E:\FR\FM\30NON1.SGM 30NON1 Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices 7004, or by email at emesm@ natfuel.com. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on January 23, 2023. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is January 23, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. lotter on DSK11XQN23PROD with NOTICES1 Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is January 23, 2023. As described further in Rule 214, 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 4 18 CFR 385.214. 5 18 CFR 157.10. 2 Persons VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before January 23, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–17–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 6 Additionally, you may file your comments electronically by using the eComment feature, PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 73555 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP23–17– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: Meghan M. Emes, Senior Attorney National Fuel Gas Supply Corporation, 6363 Main Street, Williamsville, New York 14221, or by email at emesm@natfuel.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. E:\FR\FM\30NON1.SGM 30NON1 73556 Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26095 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC22–28–000] Commission Information Collection Activities (FERC–511); Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission FERC– 511 (Transfer of Hydropower License), which will be submitted to the Office of Management and Budget (OMB) for review. No Comments were received on the 60-day notice published on September 21, 2022. DATES: Comments on the collection of information are due December 30, 2022. ADDRESSES: Send written comments on FERC–511 to OMB through www.reginfo.gov/public/do/PRAMain. Attention: Federal Energy Regulatory Commission Desk Officer. Please identify the OMB Control Number (1902–0069) in the subject line of your comments. Comments should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/ PRAMain. Please submit copies of your comments to the Commission. You may submit copies of your comments (identified by Docket No. IC22–28–000) by one of the following methods: Electronic filing through https:// www.ferc.gov, is preferred. • Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format. • For those unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery. Æ Mail via U.S. Postal Service Only: Addressed to: Federal Energy lotter on DSK11XQN23PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Æ Hand (including courier) delivery: Deliver to: Federal Energy Regulatory Commission, Secretary of the Commission, 12225 Wilkins Avenue, Rockville, MD 20852. Instructions: OMB submissions must be formatted and filed in accordance with submission guidelines at www.reginfo.gov/public/do/PRAMain. Using the search function under the ‘‘Currently Under Review’’ field, select Federal Energy Regulatory Commission; click ‘‘submit,’’ and select ‘‘comment’’ to the right of the subject collection. FERC submissions must be formatted and filed in accordance with submission guidelines at: https://www.ferc.gov. For user assistance, contact FERC Online Support by email at ferconlinesupport@ ferc.gov, or by phone at: (866) 208–3676 (toll-free). Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/ferconline/overview. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663. SUPPLEMENTARY INFORMATION: Title: FERC–511, Transfer of Hydropower License.1 OMB Control No.: 1902–0069. Type of Request: Three-year extension of the FERC–511 information collection requirements with no changes to the current reporting and recordkeeping requirements. Abstract: The purpose of FERC–511 is to implement the information collections pursuant to Section 8 of the Federal Power Act (FPA) and Code of Federal Regulations (CFR) under Title 18 CFR part 9 (Transfer of License) Sections 9.1 through 9.3 and Section 131.20 of the 18 CFR. Section 8 of the FPA stipulates that no voluntary transfer of any license, or the rights thereunder granted, shall be made without the written approval of the Commission. Sections 9.1 through 9.3 of the 18 CFR states that any licensee (transferor) desiring to transfer a license and the person, association, corporation, 1 The title is being updated to Transfer of Hydropower License (rather than Transfer of Electric License). PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 State, or municipality (transferee) desiring to acquire the same must jointly file an application for Commission’s approval of such transfer. The application must show that the transfer is in the public interest and provide the qualifications of the transferee to hold such license and to operate the property under the license. Approval of the transfer is contingent upon the transfer of title to the properties under the license, transfer of all project files including all dam safety related documents, and delivery of all license instruments. The application for approval of transfer of license must conform to the requirements of Sections 131.20 of the 18 CFR, which must include the following: application statement by all parties; verification statement; proof of citizenship; evidence of compliance by the transferor with all applicable state laws or how the transferee proposes to comply; and qualifications of the transferee to hold the license and operate the project. The Commission uses the information collected under the requirements of FERC–511 to implement the statutory provisions of Sections 8 of the Federal Power Act (FPA) and 18 CFR part 9 and 18 CFR 131.20 of the Commission’s regulations. The information filed with the Commission is in the format of a written application for transfer of license, executed jointly by the parties of the proposed transfer. The Commission uses the information collected to determine the qualifications of the proposed transferee to hold the license and to prepare the transfer of the license order to make its determination. Type of Respondent: Existing Hydropower Project Licensees and those entities wishing to have a Hydropower Project License transferred to them. Estimate of Annual Burden: 2 The Commission estimates the annual burden and cost 3 for the information collection as follows. 2 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. See 5 CFR 1320 for additional information on the definition of information collection burden. 3 The FERC 2022 average salary plus benefits for one FERC full-time equivalent (FTE) is $188,922/ year (or $91.00/hour). Commission staff estimates that the industry’s skill set (wages and benefits) for completing and filing FERC–511 is comparable to the Commission’s skill set. E:\FR\FM\30NON1.SGM 30NON1

Agencies

[Federal Register Volume 87, Number 229 (Wednesday, November 30, 2022)]
[Notices]
[Pages 73554-73556]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26095]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-17-000]


National Fuel Gas Supply Corporation; Notice of Request Under 
Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on November 18, 2022, National Fuel Gas Supply 
Corporation (National Fuel) 6363 Main Street, Williamsville, New York 
14221, filed in the above referenced docket, a prior notice request 
pursuant to sections 157.205, 157.208 and 157.216 of the Federal Energy 
Regulatory Commission's regulations under the Natural Gas Act (NGA) and 
National Fuel's blanket certificate issued in Docket No. CP83-4-000, 
requesting authorization to abandon and replace 11.55 miles of 12-inch-
diameter bare steel pipeline (Line Z20) with 20-inch coated steel 
pipeline and construct certain related natural gas facilities located 
in Potter County, Pennsylvania. National Fuel states the proposed 
replacement is part of a modernization program to enhance the 
reliability and safety of its system and upsizing the pipeline will 
enable it to provide additional firm transportation service. The 
proposed construction is estimated to cost $33.4 million as more fully 
described in the application which is on file with the Commission and 
open to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
Meghan M. Emes, Senior Attorney National Fuel Gas Supply Corporation, 
6363 Main Street, Williamsville, New York 14221, by telephone at (716) 
857-

[[Page 73555]]

7004, or by email at [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on January 23, 2023. 
How to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is January 23, 2023. A protest may also 
serve as a motion to intervene so long as the protestor states it also 
seeks to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is January 23, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before January 23, 2023. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-17-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select ``General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-17-000.

    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: Meghan M. 
Emes, Senior Attorney National Fuel Gas Supply Corporation, 6363 Main 
Street, Williamsville, New York 14221, or by email at 
[email protected]. Any subsequent submissions by an intervenor must be 
served on the applicant and all other parties to the proceeding. 
Contact information for parties can be downloaded from the service list 
at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.


[[Page 73556]]


    Dated: November 23, 2022.