Wyoming Interstate Company, LLC; Notice of Application and Establishing Intervention Deadline, 73551-73553 [2022-26094]
Download as PDF
Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26096 Filed 11–29–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9282–039]
lotter on DSK11XQN23PROD with NOTICES1
Pine Valley Hydroelectric Power
Company, LLC; Notice of Intent To File
License Application, Filing of PreApplication Document, and Approving
Use of The Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 9282–039.
c. Date Filed: September 27, 2022.
d. Submitted by: Pine Valley
Hydroelectric Power Company, LLC
(Pine Valley Hydro).
e. Name of Project: Pine Valley
Hydroelectric Project (project).
f. Location: On the Souhegan River in
Hillsborough County, New Hampshire.
No federal lands are occupied by the
project works or located within the
project boundary.
g. Filed Pursuant To: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact: Mr.
Jonathan DiCesare, Pine Valley
Hydroelectric Power Company, LLC; 10
Roberts Lane, Suite 201, Ridgefield, CT
06877; (518) 657–9012; or email at info@
dichotomypower.com.
i. FERC Contact: Michael Watts at
(202) 502–6123; or email at
michael.watts@ferc.gov.
j. Pine Valley Hydro filed its request
to use the Traditional Licensing Process
on September 27, 2022, and provided
public notice of its request on
September 20, 2022. In a letter dated
November 23 2022, the Director of the
Division of Hydropower Licensing
approved Pine Valley Hydro’s request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New Hampshire State Historic
Preservation Officer, as required by
VerDate Sep<11>2014
16:58 Nov 29, 2022
Jkt 259001
section 106 of the National Historic
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Pine Valley Hydro as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. On September 27, 2022, Pine
Valley Hydro filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
on March 13, 2020.
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 9282.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by September 30, 2027.
p. Register online at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26090 Filed 11–29–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–14–000]
Wyoming Interstate Company, LLC;
Notice of Application and Establishing
Intervention Deadline
Take notice that on November 10,
2022, Wyoming Interstate Company,
LLC (WIC), Post Office Box 1087,
Colorado Springs, Colorado 80944, filed
in Docket No. CP23–14–000, an
application under section 7(b) of the
Natural Gas Act (NGA), and Part 157 of
the Commission’s regulations requesting
authority to abandon, in place, the
Diamond Mountain Compressor Station
(Diamond Mountain Abandonment
Project) located at approximate Milepost
54.8 on WIC’s 24-inch diameter Kanda
Lateral in Uintah County, Utah, all as
more fully set forth in the request which
is on file with the Commission and open
to public inspection with the
Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to
Francisco Tarin, Director, Regulatory,
Wyoming Interstate Company, LLC; P.O.
Box 1087, Colorado Springs, Colorado
80944, by phone at (719) 667–7517, or
via email at Francisco_Tarin@
kindermorgan.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
1 18
Frm 00013
Fmt 4703
Sfmt 4703
73551
CFR (Code of Federal Regulations) 157.9.
E:\FR\FM\30NON1.SGM
30NON1
73552
Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
lotter on DSK11XQN23PROD with NOTICES1
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5:00 p.m. Eastern
Time on December 14, 2022.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before December 14, 2022.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
reference the Project docket number
CP23–14–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
VerDate Sep<11>2014
16:58 Nov 29, 2022
Jkt 259001
(3) You can file a paper copy of your
comments by mailing them to the
following address below.2 Your written
comments must reference the Project
docket number (CP23–14–000).
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is December 14,
2022. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
2 Hand delivered submissions in docketed
proceedings should be delivered to Federal Energy
Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
3 18 CFR 385.102(d).
4 18 CFR 385.214.
5 18 CFR 157.10.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP23–14–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the Project
docket number CP23–14–000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served to the applicant either
by mail or email (with a link to the
document) at: Francisco Tarin, Director,
Regulatory, Wyoming Interstate
Company, LLC; P.O. Box 1087, Colorado
Springs, Colorado 80944, by phone at
(719) 667–7517, or via email at
Francisco_Tarin@kindermorgan.com.
Any subsequent submissions by an
intervenor must be served to the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
6 Hand delivered submissions in docketed
proceedings should be delivered to Federal Energy
Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
E:\FR\FM\30NON1.SGM
30NON1
Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
Docket Numbers: PR23–9–000.
Applicants: Gulf Coast Express
Pipeline LLC.
Description: § 284.123(g) Rate Filing:
12.01.2022 GCX Fuel Filing to be
effective 12/1/2022.
Filed Date: 11/23/22.
Accession Number: 20221123–5005.
Comment Date: 5 pm ET 12/14/22.
184.123(g) Protest: 5 pm ET 1/23/23.
Docket Numbers: RP23–200–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Cleanup Filing eff
12–1–22 to be effective 12/18/2022.
Filed Date: 11/18/22.
Accession Number: 20221118–5199.
Comment Date: 5 pm ET 11/30/22.
Docket Numbers: RP23–201–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Removal of Non-Conforming
Agreements from Volume 1, Pt 8.0, Sec
38 to be effective 12/22/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5020.
Comment Date: 5 pm ET 12/5/22.
Docket Numbers: RP23–202–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: Annual
Fuel and L&U Filing 2023 to be effective
1/1/2023.
Filed Date: 11/22/22.
Accession Number: 20221122–5077.
Comment Date: 5 pm ET 12/5/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
[FR Doc. 2022–26094 Filed 11–29–22; 8:45 am]
Filings in Existing Proceedings
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at https://
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on December 14, 2022.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
lotter on DSK11XQN23PROD with NOTICES1
Filings Instituting Proceedings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
16:58 Nov 29, 2022
Jkt 259001
Docket Numbers: PR23–1–001.
Applicants: Acacia Natural Gas, L.L.C.
Description: Amendment Filing:
Amended Statement of Operating
Conditions to be effective 10/1/2022.
Filed Date: 11/22/22.
Accession Number: 20221122–5053.
Comment Date: 5 pm ET 12/6/22.
184.123(g) Protest: 5 pm ET 12/6/22.
Docket Numbers: RP11–1591–000.
Applicants: Golden Pass Pipeline
LLC.
Description: Refund Report: 2022
Penalty and Revenue Costs Report of
Golden Pass Pipeline LLC to be effective
N/A.
Filed Date: 11/22/22.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
73553
Accession Number: 20221122–5057.
Comment Date: 5 pm ET 12/5/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26088 Filed 11–29–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2327–049]
Great Lakes Hydro America. LLC;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
Variance from Reservoir Elevation.
b. Project No: P–2327–049.
c. Date Filed: November 15, 2022.
d. Applicant: Great Lakes Hydro
America. LLC.
e. Name of Project: Cascade Project.
f. Location: The project is located on
the Androscoggin River, in Coos
County, New Hampshire.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kyle Murphy,
Brookfield Renewable, 150 Main Street,
Lewiston, Maine 04240, (207) 458–5861.
i. FERC Contact: Zeena Aljibury, (202)
502–6065, zeena.aljibury@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
E:\FR\FM\30NON1.SGM
30NON1
Agencies
[Federal Register Volume 87, Number 229 (Wednesday, November 30, 2022)]
[Notices]
[Pages 73551-73553]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26094]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-14-000]
Wyoming Interstate Company, LLC; Notice of Application and
Establishing Intervention Deadline
Take notice that on November 10, 2022, Wyoming Interstate Company,
LLC (WIC), Post Office Box 1087, Colorado Springs, Colorado 80944,
filed in Docket No. CP23-14-000, an application under section 7(b) of
the Natural Gas Act (NGA), and Part 157 of the Commission's regulations
requesting authority to abandon, in place, the Diamond Mountain
Compressor Station (Diamond Mountain Abandonment Project) located at
approximate Milepost 54.8 on WIC's 24-inch diameter Kanda Lateral in
Uintah County, Utah, all as more fully set forth in the request which
is on file with the Commission and open to public inspection with the
Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the application should be directed to
Francisco Tarin, Director, Regulatory, Wyoming Interstate Company, LLC;
P.O. Box 1087, Colorado Springs, Colorado 80944, by phone at (719) 667-
7517, or via email at [email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or
[[Page 73552]]
issue a Notice of Schedule for Environmental Review. If a Notice of
Schedule for Environmental Review is issued, it will indicate, among
other milestones, the anticipated date for the Commission staff's
issuance of the final environmental impact statement (FEIS) or
environmental assessment (EA) for this proposal. The filing of an EA in
the Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: you can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on December 14, 2022.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before December 14, 2022.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number CP23-14-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address below.\2\ Your written comments must reference
the Project docket number (CP23-14-000).
---------------------------------------------------------------------------
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is December 14, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP23-14-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below.\6\
Your motion to intervene must reference the Project docket number CP23-
14-000.
---------------------------------------------------------------------------
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Protests and motions to intervene must be served to the applicant
either by mail or email (with a link to the document) at: Francisco
Tarin, Director, Regulatory, Wyoming Interstate Company, LLC; P.O. Box
1087, Colorado Springs, Colorado 80944, by phone at (719) 667-7517, or
via email at [email protected]. Any subsequent
submissions by an intervenor must be served to the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the service list at the eService link on FERC Online.
[[Page 73553]]
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at https://www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on December 14, 2022.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26094 Filed 11-29-22; 8:45 am]
BILLING CODE 6717-01-P