Wyoming Interstate Company, LLC; Notice of Application and Establishing Intervention Deadline, 73551-73553 [2022-26094]

Download as PDF Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26096 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9282–039] lotter on DSK11XQN23PROD with NOTICES1 Pine Valley Hydroelectric Power Company, LLC; Notice of Intent To File License Application, Filing of PreApplication Document, and Approving Use of The Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 9282–039. c. Date Filed: September 27, 2022. d. Submitted by: Pine Valley Hydroelectric Power Company, LLC (Pine Valley Hydro). e. Name of Project: Pine Valley Hydroelectric Project (project). f. Location: On the Souhegan River in Hillsborough County, New Hampshire. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant To: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Jonathan DiCesare, Pine Valley Hydroelectric Power Company, LLC; 10 Roberts Lane, Suite 201, Ridgefield, CT 06877; (518) 657–9012; or email at info@ dichotomypower.com. i. FERC Contact: Michael Watts at (202) 502–6123; or email at michael.watts@ferc.gov. j. Pine Valley Hydro filed its request to use the Traditional Licensing Process on September 27, 2022, and provided public notice of its request on September 20, 2022. In a letter dated November 23 2022, the Director of the Division of Hydropower Licensing approved Pine Valley Hydro’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New Hampshire State Historic Preservation Officer, as required by VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Pine Valley Hydro as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and consultation pursuant to section 106 of the National Historic Preservation Act. m. On September 27, 2022, Pine Valley Hydro filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD may be viewed and/or printed on the Commission’s website (https://www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued on March 13, 2020. o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 9282. Pursuant to 18 CFR 16.20, each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by September 30, 2027. p. Register online at https:// ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26090 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–14–000] Wyoming Interstate Company, LLC; Notice of Application and Establishing Intervention Deadline Take notice that on November 10, 2022, Wyoming Interstate Company, LLC (WIC), Post Office Box 1087, Colorado Springs, Colorado 80944, filed in Docket No. CP23–14–000, an application under section 7(b) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations requesting authority to abandon, in place, the Diamond Mountain Compressor Station (Diamond Mountain Abandonment Project) located at approximate Milepost 54.8 on WIC’s 24-inch diameter Kanda Lateral in Uintah County, Utah, all as more fully set forth in the request which is on file with the Commission and open to public inspection with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the application should be directed to Francisco Tarin, Director, Regulatory, Wyoming Interstate Company, LLC; P.O. Box 1087, Colorado Springs, Colorado 80944, by phone at (719) 667–7517, or via email at Francisco_Tarin@ kindermorgan.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or 1 18 Frm 00013 Fmt 4703 Sfmt 4703 73551 CFR (Code of Federal Regulations) 157.9. E:\FR\FM\30NON1.SGM 30NON1 73552 Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. lotter on DSK11XQN23PROD with NOTICES1 Public Participation There are two ways to become involved in the Commission’s review of this project: you can file comments on the project, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on December 14, 2022. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please submit your comments on or before December 14, 2022. There are three methods you can use to submit your comments to the Commission. In all instances, please reference the Project docket number CP23–14–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 (3) You can file a paper copy of your comments by mailing them to the following address below.2 Your written comments must reference the Project docket number (CP23–14–000). To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. For instructions on how to intervene, see below. Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,3 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is December 14, 2022. As described further in Rule 214, your motion to intervene must state, to the extent known, your position 2 Hand delivered submissions in docketed proceedings should be delivered to Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 3 18 CFR 385.102(d). 4 18 CFR 385.214. 5 18 CFR 157.10. PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP23–14–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below.6 Your motion to intervene must reference the Project docket number CP23–14–000. Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served to the applicant either by mail or email (with a link to the document) at: Francisco Tarin, Director, Regulatory, Wyoming Interstate Company, LLC; P.O. Box 1087, Colorado Springs, Colorado 80944, by phone at (719) 667–7517, or via email at Francisco_Tarin@kindermorgan.com. Any subsequent submissions by an intervenor must be served to the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. 6 Hand delivered submissions in docketed proceedings should be delivered to Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. E:\FR\FM\30NON1.SGM 30NON1 Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214(c)(1).8 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.9 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Dated: November 23, 2022. Kimberly D. Bose, Secretary. Docket Numbers: PR23–9–000. Applicants: Gulf Coast Express Pipeline LLC. Description: § 284.123(g) Rate Filing: 12.01.2022 GCX Fuel Filing to be effective 12/1/2022. Filed Date: 11/23/22. Accession Number: 20221123–5005. Comment Date: 5 pm ET 12/14/22. 184.123(g) Protest: 5 pm ET 1/23/23. Docket Numbers: RP23–200–000. Applicants: Texas Eastern Transmission, LP. Description: § 4(d) Rate Filing: Negotiated Rates—Cleanup Filing eff 12–1–22 to be effective 12/18/2022. Filed Date: 11/18/22. Accession Number: 20221118–5199. Comment Date: 5 pm ET 11/30/22. Docket Numbers: RP23–201–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Removal of Non-Conforming Agreements from Volume 1, Pt 8.0, Sec 38 to be effective 12/22/2022. Filed Date: 11/21/22. Accession Number: 20221121–5020. Comment Date: 5 pm ET 12/5/22. Docket Numbers: RP23–202–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Annual Fuel and L&U Filing 2023 to be effective 1/1/2023. Filed Date: 11/22/22. Accession Number: 20221122–5077. Comment Date: 5 pm ET 12/5/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. [FR Doc. 2022–26094 Filed 11–29–22; 8:45 am] Filings in Existing Proceedings Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at https:// www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on December 14, 2022. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings lotter on DSK11XQN23PROD with NOTICES1 Filings Instituting Proceedings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: 7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 8 18 CFR 385.214(c)(1). 9 18 CFR 385.214(b)(3) and (d). VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 Docket Numbers: PR23–1–001. Applicants: Acacia Natural Gas, L.L.C. Description: Amendment Filing: Amended Statement of Operating Conditions to be effective 10/1/2022. Filed Date: 11/22/22. Accession Number: 20221122–5053. Comment Date: 5 pm ET 12/6/22. 184.123(g) Protest: 5 pm ET 12/6/22. Docket Numbers: RP11–1591–000. Applicants: Golden Pass Pipeline LLC. Description: Refund Report: 2022 Penalty and Revenue Costs Report of Golden Pass Pipeline LLC to be effective N/A. Filed Date: 11/22/22. PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 73553 Accession Number: 20221122–5057. Comment Date: 5 pm ET 12/5/22. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26088 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2327–049] Great Lakes Hydro America. LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary Variance from Reservoir Elevation. b. Project No: P–2327–049. c. Date Filed: November 15, 2022. d. Applicant: Great Lakes Hydro America. LLC. e. Name of Project: Cascade Project. f. Location: The project is located on the Androscoggin River, in Coos County, New Hampshire. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Kyle Murphy, Brookfield Renewable, 150 Main Street, Lewiston, Maine 04240, (207) 458–5861. i. FERC Contact: Zeena Aljibury, (202) 502–6065, zeena.aljibury@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the E:\FR\FM\30NON1.SGM 30NON1

Agencies

[Federal Register Volume 87, Number 229 (Wednesday, November 30, 2022)]
[Notices]
[Pages 73551-73553]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26094]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-14-000]


Wyoming Interstate Company, LLC; Notice of Application and 
Establishing Intervention Deadline

    Take notice that on November 10, 2022, Wyoming Interstate Company, 
LLC (WIC), Post Office Box 1087, Colorado Springs, Colorado 80944, 
filed in Docket No. CP23-14-000, an application under section 7(b) of 
the Natural Gas Act (NGA), and Part 157 of the Commission's regulations 
requesting authority to abandon, in place, the Diamond Mountain 
Compressor Station (Diamond Mountain Abandonment Project) located at 
approximate Milepost 54.8 on WIC's 24-inch diameter Kanda Lateral in 
Uintah County, Utah, all as more fully set forth in the request which 
is on file with the Commission and open to public inspection with the 
Commission and open for public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (www.ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding the application should be directed to 
Francisco Tarin, Director, Regulatory, Wyoming Interstate Company, LLC; 
P.O. Box 1087, Colorado Springs, Colorado 80944, by phone at (719) 667-
7517, or via email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or

[[Page 73552]]

issue a Notice of Schedule for Environmental Review. If a Notice of 
Schedule for Environmental Review is issued, it will indicate, among 
other milestones, the anticipated date for the Commission staff's 
issuance of the final environmental impact statement (FEIS) or 
environmental assessment (EA) for this proposal. The filing of an EA in 
the Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are two ways to become involved in the Commission's review of 
this project: you can file comments on the project, and you can file a 
motion to intervene in the proceeding. There is no fee or cost for 
filing comments or intervening. The deadline for filing a motion to 
intervene is 5:00 p.m. Eastern Time on December 14, 2022.

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be. To ensure that your comments 
are timely and properly recorded, please submit your comments on or 
before December 14, 2022.
    There are three methods you can use to submit your comments to the 
Commission. In all instances, please reference the Project docket 
number CP23-14-000 in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy 
method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; first select ``General'' and then select ``Comment on a 
Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address below.\2\ Your written comments must reference 
the Project docket number (CP23-14-000).
---------------------------------------------------------------------------

    \2\ Hand delivered submissions in docketed proceedings should be 
delivered to Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\3\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is December 14, 2022. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number CP23-14-000 in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the address below.\6\ 
Your motion to intervene must reference the Project docket number CP23-
14-000.
---------------------------------------------------------------------------

    \6\ Hand delivered submissions in docketed proceedings should be 
delivered to Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.

Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426

    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Protests and motions to intervene must be served to the applicant 
either by mail or email (with a link to the document) at: Francisco 
Tarin, Director, Regulatory, Wyoming Interstate Company, LLC; P.O. Box 
1087, Colorado Springs, Colorado 80944, by phone at (719) 667-7517, or 
via email at [email protected]. Any subsequent 
submissions by an intervenor must be served to the applicant and all 
other parties to the proceeding. Contact information for parties can be 
downloaded from the service list at the eService link on FERC Online.

[[Page 73553]]

    All timely, unopposed \7\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining 
party status will be placed on the service list maintained by the 
Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \7\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \8\ 18 CFR 385.214(c)(1).
    \9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at https://www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on December 14, 2022.

    Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26094 Filed 11-29-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.