Combined Notice of Filings, 73553 [2022-26088]
Download as PDF
Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
Docket Numbers: PR23–9–000.
Applicants: Gulf Coast Express
Pipeline LLC.
Description: § 284.123(g) Rate Filing:
12.01.2022 GCX Fuel Filing to be
effective 12/1/2022.
Filed Date: 11/23/22.
Accession Number: 20221123–5005.
Comment Date: 5 pm ET 12/14/22.
184.123(g) Protest: 5 pm ET 1/23/23.
Docket Numbers: RP23–200–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Cleanup Filing eff
12–1–22 to be effective 12/18/2022.
Filed Date: 11/18/22.
Accession Number: 20221118–5199.
Comment Date: 5 pm ET 11/30/22.
Docket Numbers: RP23–201–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Removal of Non-Conforming
Agreements from Volume 1, Pt 8.0, Sec
38 to be effective 12/22/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5020.
Comment Date: 5 pm ET 12/5/22.
Docket Numbers: RP23–202–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: Annual
Fuel and L&U Filing 2023 to be effective
1/1/2023.
Filed Date: 11/22/22.
Accession Number: 20221122–5077.
Comment Date: 5 pm ET 12/5/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
[FR Doc. 2022–26094 Filed 11–29–22; 8:45 am]
Filings in Existing Proceedings
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at https://
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on December 14, 2022.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
lotter on DSK11XQN23PROD with NOTICES1
Filings Instituting Proceedings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
16:58 Nov 29, 2022
Jkt 259001
Docket Numbers: PR23–1–001.
Applicants: Acacia Natural Gas, L.L.C.
Description: Amendment Filing:
Amended Statement of Operating
Conditions to be effective 10/1/2022.
Filed Date: 11/22/22.
Accession Number: 20221122–5053.
Comment Date: 5 pm ET 12/6/22.
184.123(g) Protest: 5 pm ET 12/6/22.
Docket Numbers: RP11–1591–000.
Applicants: Golden Pass Pipeline
LLC.
Description: Refund Report: 2022
Penalty and Revenue Costs Report of
Golden Pass Pipeline LLC to be effective
N/A.
Filed Date: 11/22/22.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
73553
Accession Number: 20221122–5057.
Comment Date: 5 pm ET 12/5/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26088 Filed 11–29–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2327–049]
Great Lakes Hydro America. LLC;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
Variance from Reservoir Elevation.
b. Project No: P–2327–049.
c. Date Filed: November 15, 2022.
d. Applicant: Great Lakes Hydro
America. LLC.
e. Name of Project: Cascade Project.
f. Location: The project is located on
the Androscoggin River, in Coos
County, New Hampshire.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kyle Murphy,
Brookfield Renewable, 150 Main Street,
Lewiston, Maine 04240, (207) 458–5861.
i. FERC Contact: Zeena Aljibury, (202)
502–6065, zeena.aljibury@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
E:\FR\FM\30NON1.SGM
30NON1
Agencies
[Federal Register Volume 87, Number 229 (Wednesday, November 30, 2022)]
[Notices]
[Page 73553]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26088]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23-9-000.
Applicants: Gulf Coast Express Pipeline LLC.
Description: Sec. 284.123(g) Rate Filing: 12.01.2022 GCX Fuel
Filing to be effective 12/1/2022.
Filed Date: 11/23/22.
Accession Number: 20221123-5005.
Comment Date: 5 pm ET 12/14/22.
184.123(g) Protest: 5 pm ET 1/23/23.
Docket Numbers: RP23-200-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Negotiated Rates--Cleanup
Filing eff 12-1-22 to be effective 12/18/2022.
Filed Date: 11/18/22.
Accession Number: 20221118-5199.
Comment Date: 5 pm ET 11/30/22.
Docket Numbers: RP23-201-000.
Applicants: Guardian Pipeline, L.L.C.
Description: Sec. 4(d) Rate Filing: Removal of Non-Conforming
Agreements from Volume 1, Pt 8.0, Sec 38 to be effective 12/22/2022.
Filed Date: 11/21/22.
Accession Number: 20221121-5020.
Comment Date: 5 pm ET 12/5/22.
Docket Numbers: RP23-202-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Annual Fuel and L&U Filing
2023 to be effective 1/1/2023.
Filed Date: 11/22/22.
Accession Number: 20221122-5077.
Comment Date: 5 pm ET 12/5/22.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: PR23-1-001.
Applicants: Acacia Natural Gas, L.L.C.
Description: Amendment Filing: Amended Statement of Operating
Conditions to be effective 10/1/2022.
Filed Date: 11/22/22.
Accession Number: 20221122-5053.
Comment Date: 5 pm ET 12/6/22.
184.123(g) Protest: 5 pm ET 12/6/22.
Docket Numbers: RP11-1591-000.
Applicants: Golden Pass Pipeline LLC.
Description: Refund Report: 2022 Penalty and Revenue Costs Report
of Golden Pass Pipeline LLC to be effective N/A.
Filed Date: 11/22/22.
Accession Number: 20221122-5057.
Comment Date: 5 pm ET 12/5/22.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26088 Filed 11-29-22; 8:45 am]
BILLING CODE 6717-01-P