Brookfield White Pine Hydro LLC; Notice of Denial of Water Quality Certification, 73295 [2022-25986]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 228 / Tuesday, November 29, 2022 / Notices
Description: Tariff Amendment:
Amendment to MBR Tariff to be
effective 11/28/2022.
Filed Date: 11/22/22.
Accession Number: 20221122–5158.
Comment Date: 5 p.m. ET 12/13/22.
Docket Numbers: ER22–2983–001.
Applicants: Ohio Power Company.
Description: Tariff Amendment: Ohio
Power MBR Revision to be effective 11/
28/2022.
Filed Date: 11/22/22.
Accession Number: 20221122–5141.
Comment Date: 5 p.m. ET 12/13/22.
Docket Numbers: ER23–474–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2022–11–21 Washington WEIM
Greenhouse Gas Amendment to be
effective 12/31/9998.
Filed Date: 11/21/22.
Accession Number: 20221121–5148.
Comment Date: 5 p.m. ET 12/8/22.
Docket Numbers: ER23–475–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: § 205(d) Rate Filing:
2022–11–21 OTP SISA 715–NSP to be
effective 11/22/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5153.
Comment Date: 5 p.m. ET 12/8/22.
Docket Numbers: ER23–476–000.
Applicants: Great Pathfinder Wind,
LLC.
Description: Baseline eTariff Filing:
Reactive Power Tariff Application to be
effective 2/1/2023.
Filed Date: 11/21/22.
Accession Number: 20221121–5178.
Comment Date: 5 p.m. ET 12/8/22.
Docket Numbers: ER23–477–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–11–22_SA 3175 Delta’s Edge
Solar-Entergy Mississippi 3rd Rev GIA
(J679) to be effective 11/14/2022.
Filed Date: 11/22/22.
Accession Number: 20221122–5029.
Comment Date: 5 p.m. ET 12/8/22.
Docket Numbers: ER23–478–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Union Electric Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2022–11–22_SA 2011
Ameren-Centralia 1st Rev WDS to be
effective 2/1/2023.
Filed Date: 11/22/22.
Accession Number: 20221122–5072.
Comment Date: 5 p.m. ET 12/13/22.
Docket Numbers: ER23–479–000;
TS23–1–000.
VerDate Sep<11>2014
16:29 Nov 28, 2022
Jkt 259001
Applicants: Bellflower Solar 1, LLC,
Bellflower Solar 1, LLC.
Description: Request for Temporary
Waivers of Bellflower Solar 1, LLC.
Filed Date: 11/22/22.
Accession Number: 20221122–5079.
Comment Date: 5 p.m. ET 12/13/22.
Docket Numbers: ER23–481–000.
Applicants: TotalEnergies Gas &
Power North America, Inc.
Description: § 205(d) Rate Filing:
Updated Market Based Rate Tariff to be
effective 11/23/2022.
Filed Date: 11/22/22.
Accession Number: 20221122–5168.
Comment Date: 5 p.m. ET 12/13/22.
Docket Numbers: ER23–482–000.
Applicants: Nevada Power Company.
Description: § 205(d) Rate Filing:
Nevada Power Co. Service Agreements
with Star Peak Geothermal, LLC to be
effective 12/1/2022.
Filed Date: 11/22/22.
Accession Number: 20221122–5173.
Comment Date: 5 p.m. ET 12/13/22.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH23–1–000.
Applicants: Axium Infrastructure Inc.
Description: Axium Infrastructure,
Inc. submits FERC–65B Notice of
Change in Fact to Waiver Notification.
Filed Date: 11/21/22.
Accession Number: 20221121–5218.
Comment Date: 5 p.m. ET 12/12/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–25987 Filed 11–28–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
73295
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2322–069]
Brookfield White Pine Hydro LLC;
Notice of Denial of Water Quality
Certification
On January 31, 2020, Brookfield
White Pine Hydro LLC (Brookfield) filed
an application for a new license for the
Shawmut Hydroelectric Project (project)
in the above captioned docket.
Brookfield filed with the Maine
Department of Environmental Protection
(Maine DEP) a request for water quality
certification for the project under
section 401(a)(1) of the Clean Water Act
on October 18, 2021. On October 12,
2022, the Maine DEP denied
certification for the project. Pursuant to
40 CFR 121.8, we are providing notice
that Maine DEP’s denial satisfies the
requirements of 40 CFR 121.7(e).
Dated: November 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–25986 Filed 11–28–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD22–10–000]
Reliability Technical Conference;
Notice Inviting Post-Technical
Conference Comments
On Thursday, November 10, 2022, the
Federal Energy Regulatory Commission
(Commission) convened its annual
Commissioner-led Reliability Technical
Conference to discuss policy issues
related to the reliability of the BulkPower System.
All interested persons are invited to
file post-technical conference comments
to address issues raised during the
technical conference identified in the
Supplemental Notice of Technical
Conference issued on November 3,
2022. For reference, the questions
included in the Supplemental Notice
are included below. Commenters need
not answer all of the questions, but are
encouraged to organize responses using
the numbering and order in the below
questions. Commenters are also invited
to reference material previously filed in
this docket but are encouraged to avoid
repetition or replication of their
previous comments. Comments must be
submitted on or before 60 days from the
date of this Notice.
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 87, Number 228 (Tuesday, November 29, 2022)]
[Notices]
[Page 73295]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-25986]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2322-069]
Brookfield White Pine Hydro LLC; Notice of Denial of Water
Quality Certification
On January 31, 2020, Brookfield White Pine Hydro LLC (Brookfield)
filed an application for a new license for the Shawmut Hydroelectric
Project (project) in the above captioned docket. Brookfield filed with
the Maine Department of Environmental Protection (Maine DEP) a request
for water quality certification for the project under section 401(a)(1)
of the Clean Water Act on October 18, 2021. On October 12, 2022, the
Maine DEP denied certification for the project. Pursuant to 40 CFR
121.8, we are providing notice that Maine DEP's denial satisfies the
requirements of 40 CFR 121.7(e).
Dated: November 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-25986 Filed 11-28-22; 8:45 am]