Brookfield White Pine Hydro LLC; Notice of Denial of Water Quality Certification, 73295 [2022-25986]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 87, No. 228 / Tuesday, November 29, 2022 / Notices Description: Tariff Amendment: Amendment to MBR Tariff to be effective 11/28/2022. Filed Date: 11/22/22. Accession Number: 20221122–5158. Comment Date: 5 p.m. ET 12/13/22. Docket Numbers: ER22–2983–001. Applicants: Ohio Power Company. Description: Tariff Amendment: Ohio Power MBR Revision to be effective 11/ 28/2022. Filed Date: 11/22/22. Accession Number: 20221122–5141. Comment Date: 5 p.m. ET 12/13/22. Docket Numbers: ER23–474–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2022–11–21 Washington WEIM Greenhouse Gas Amendment to be effective 12/31/9998. Filed Date: 11/21/22. Accession Number: 20221121–5148. Comment Date: 5 p.m. ET 12/8/22. Docket Numbers: ER23–475–000. Applicants: Northern States Power Company, a Minnesota corporation. Description: § 205(d) Rate Filing: 2022–11–21 OTP SISA 715–NSP to be effective 11/22/2022. Filed Date: 11/21/22. Accession Number: 20221121–5153. Comment Date: 5 p.m. ET 12/8/22. Docket Numbers: ER23–476–000. Applicants: Great Pathfinder Wind, LLC. Description: Baseline eTariff Filing: Reactive Power Tariff Application to be effective 2/1/2023. Filed Date: 11/21/22. Accession Number: 20221121–5178. Comment Date: 5 p.m. ET 12/8/22. Docket Numbers: ER23–477–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2022–11–22_SA 3175 Delta’s Edge Solar-Entergy Mississippi 3rd Rev GIA (J679) to be effective 11/14/2022. Filed Date: 11/22/22. Accession Number: 20221122–5029. Comment Date: 5 p.m. ET 12/8/22. Docket Numbers: ER23–478–000. Applicants: Midcontinent Independent System Operator, Inc., Union Electric Company. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2022–11–22_SA 2011 Ameren-Centralia 1st Rev WDS to be effective 2/1/2023. Filed Date: 11/22/22. Accession Number: 20221122–5072. Comment Date: 5 p.m. ET 12/13/22. Docket Numbers: ER23–479–000; TS23–1–000. VerDate Sep<11>2014 16:29 Nov 28, 2022 Jkt 259001 Applicants: Bellflower Solar 1, LLC, Bellflower Solar 1, LLC. Description: Request for Temporary Waivers of Bellflower Solar 1, LLC. Filed Date: 11/22/22. Accession Number: 20221122–5079. Comment Date: 5 p.m. ET 12/13/22. Docket Numbers: ER23–481–000. Applicants: TotalEnergies Gas & Power North America, Inc. Description: § 205(d) Rate Filing: Updated Market Based Rate Tariff to be effective 11/23/2022. Filed Date: 11/22/22. Accession Number: 20221122–5168. Comment Date: 5 p.m. ET 12/13/22. Docket Numbers: ER23–482–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: Nevada Power Co. Service Agreements with Star Peak Geothermal, LLC to be effective 12/1/2022. Filed Date: 11/22/22. Accession Number: 20221122–5173. Comment Date: 5 p.m. ET 12/13/22. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH23–1–000. Applicants: Axium Infrastructure Inc. Description: Axium Infrastructure, Inc. submits FERC–65B Notice of Change in Fact to Waiver Notification. Filed Date: 11/21/22. Accession Number: 20221121–5218. Comment Date: 5 p.m. ET 12/12/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 22, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–25987 Filed 11–28–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 73295 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2322–069] Brookfield White Pine Hydro LLC; Notice of Denial of Water Quality Certification On January 31, 2020, Brookfield White Pine Hydro LLC (Brookfield) filed an application for a new license for the Shawmut Hydroelectric Project (project) in the above captioned docket. Brookfield filed with the Maine Department of Environmental Protection (Maine DEP) a request for water quality certification for the project under section 401(a)(1) of the Clean Water Act on October 18, 2021. On October 12, 2022, the Maine DEP denied certification for the project. Pursuant to 40 CFR 121.8, we are providing notice that Maine DEP’s denial satisfies the requirements of 40 CFR 121.7(e). Dated: November 22, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–25986 Filed 11–28–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD22–10–000] Reliability Technical Conference; Notice Inviting Post-Technical Conference Comments On Thursday, November 10, 2022, the Federal Energy Regulatory Commission (Commission) convened its annual Commissioner-led Reliability Technical Conference to discuss policy issues related to the reliability of the BulkPower System. All interested persons are invited to file post-technical conference comments to address issues raised during the technical conference identified in the Supplemental Notice of Technical Conference issued on November 3, 2022. For reference, the questions included in the Supplemental Notice are included below. Commenters need not answer all of the questions, but are encouraged to organize responses using the numbering and order in the below questions. Commenters are also invited to reference material previously filed in this docket but are encouraged to avoid repetition or replication of their previous comments. Comments must be submitted on or before 60 days from the date of this Notice. E:\FR\FM\29NON1.SGM 29NON1

Agencies

[Federal Register Volume 87, Number 228 (Tuesday, November 29, 2022)]
[Notices]
[Page 73295]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-25986]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2322-069]


Brookfield White Pine Hydro LLC; Notice of Denial of Water 
Quality Certification

    On January 31, 2020, Brookfield White Pine Hydro LLC (Brookfield) 
filed an application for a new license for the Shawmut Hydroelectric 
Project (project) in the above captioned docket. Brookfield filed with 
the Maine Department of Environmental Protection (Maine DEP) a request 
for water quality certification for the project under section 401(a)(1) 
of the Clean Water Act on October 18, 2021. On October 12, 2022, the 
Maine DEP denied certification for the project. Pursuant to 40 CFR 
121.8, we are providing notice that Maine DEP's denial satisfies the 
requirements of 40 CFR 121.7(e).

    Dated: November 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-25986 Filed 11-28-22; 8:45 am]