Notice of Revocation of Market-Based Rate Authority and Termination of Electric Market-Based Rate Tariff, 72984-72986 [2022-25831]
Download as PDF
72984
Federal Register / Vol. 87, No. 227 / Monday, November 28, 2022 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
Description: Compliance filing:
Compliance to 2 to be effective 10/21/
2022.
Filed Date: 11/18/22.
Accession Number: 20221118–5206.
Comment Date: 5 p.m. ET 12/7/22.
Docket Numbers: ER23–54–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amending Cancellation of ICSA, Service
Agreement No. 3477; Queue Nos. R11/
Z2–109 to be effective 2/10/2020.
Filed Date: 11/21/22.
Accession Number: 20221121–5021.
Comment Date: 5 p.m. ET 12/7/22.
Docket Numbers: ER23–113–000.
Applicants: AL Solar D, LLC.
Description: Supplement to October
17, 2022 AL Solar D, LLC tariff filing.
Filed Date: 11/16/22.
Accession Number: 20221116–5187.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–466–000.
Applicants: GRP TE Lessee, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 11/19/2022.
Filed Date: 11/18/22.
Accession Number: 20221118–5193.
Comment Date: 5 p.m. ET 12/7/22.
Docket Numbers: ER23–467–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA and ICSA, SA Nos. 6695
6696; Queue Nos. AE2–093/AF1–015 to
be effective 10/20/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5027.
Comment Date: 5 p.m. ET 12/7/22.
Docket Numbers: ER23–468–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6698; Queue No. AE2–110 to be
effective 10/20/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5039.
Comment Date: 5 p.m. ET 12/7/22.
Docket Numbers: ER23–469–000.
Applicants: NorthWestern
Corporation.
Description: Compliance filing: Order
No. 864 2nd Compliance Filing
(Montana OATT) to be effective 1/27/
2020.
Filed Date: 11/21/22.
Accession Number: 20221121–5075.
Comment Date: 5 p.m. ET 12/12/22.
Docket Numbers: ER23–470–000.
Applicants: Duke Energy Ohio, Inc.,
Duke Energy Kentucky, Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Duke Energy Ohio, Inc. submits tariff
filing per 35.13(a)(2)(iii): DEOK submits
revisions to OATT Attachment H–22A
to be effective 5/15/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5093.
Comment Date: 5 p.m. ET 12/12/22.
Docket Numbers: ER23–471–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii): Washington
County Solar LGIA Amendment Filing
to be effective 11/3/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5102.
Comment Date: 5 p.m. ET 12/12/22.
Docket Numbers: ER23–472–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Alabama Power
Company submits tariff filing per
35.13(a)(2)(iii): Decatur Solar Energy
Center LGIA Amendment Filing to be
effective 11/3/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5107.
Comment Date: 5 p.m. ET 12/12/22.
Docket Numbers: ER23–473–000.
Applicants: NextEra Blythe Solar
Energy Center, LLC.
Description: § 205(d) Rate Filing:
NextEra Blythe Solar Energy Ctr, LLC
1st Amendment to A&R SFA to be
effective 11/22/2022.
Filed Date: 11/21/22.
Accession Number: 20221121–5111.
Comment Date: 5 p.m. ET 12/12/22.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES23–7–000.
Applicants: Union Electric Company.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Union Electric Company.
Filed Date: 11/18/22.
Accession Number: 20221118–5272.
Comment Date: 5 p.m. ET 12/9/22.
Docket Numbers: ES23–8–000.
Applicants: Ameren Illinois
Company.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Ameren Illinois Company.
Filed Date: 11/18/22.
Accession Number: 20221118–5273.
Comment Date: 5 p.m. ET 12/9/22.
Docket Numbers: ES23–9–000.
Applicants: Ameren Transmission
Company of Illinois.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Ameren Transmission Company of
Illinois.
Filed Date: 11/18/22.
Accession Number: 20221118–5275.
Comment Date: 5 p.m. ET 12/9/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 21, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–25862 Filed 11–25–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Revocation of Market-Based
Rate Authority and Termination of
Electric Market-Based Rate Tariff
Docket Nos.
Data Collection for Analytics and Surveillance and Market-Based Rate Purposes ........................................................................
3C Solar LLC ....................................................................................................................................................................................
Apple Group ......................................................................................................................................................................................
Backyard Farms Energy LLC ...........................................................................................................................................................
BITH Energy, Inc ..............................................................................................................................................................................
BITH Solar 1, LLC ............................................................................................................................................................................
VerDate Sep<11>2014
19:33 Nov 25, 2022
Jkt 259001
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
E:\FR\FM\28NON1.SGM
28NON1
RM16–17–001
ER11–2649–000
ER07–1287–001
ER09–1689–000
ER13–48–000
ER13–29–000
Federal Register / Vol. 87, No. 227 / Monday, November 28, 2022 / Notices
72985
Docket Nos.
khammond on DSKJM1Z7X2PROD with NOTICES
Bolt Energy, LLC ..............................................................................................................................................................................
Cirrus Wind 1, LLC ...........................................................................................................................................................................
Conch Energy Trading, LLC .............................................................................................................................................................
Consolidated Power Co., LLC ..........................................................................................................................................................
Covanta Maine, LLC .........................................................................................................................................................................
EBRFUEL, LLC .................................................................................................................................................................................
El Paso Marketing Company, L.L.C .................................................................................................................................................
Electron Hydro, LLC .........................................................................................................................................................................
Energy Exchange Direct, LLC ..........................................................................................................................................................
Energy Exchange International, LLC ................................................................................................................................................
EONY Generation Limited ................................................................................................................................................................
Falcon Energy, LLC ..........................................................................................................................................................................
FC Energy Services Company, LLC ................................................................................................................................................
FOREST INVESTMENT GROUP, LLC ............................................................................................................................................
Full Circle Renewables, LLC ............................................................................................................................................................
GBC Metals LLC ...............................................................................................................................................................................
Gichi Noodin Wind Farm, LLC .........................................................................................................................................................
Global Energy, LLC ..........................................................................................................................................................................
Hawkeye Energy Greenport, LLC ....................................................................................................................................................
High Lonesome Mesa, LLC ..............................................................................................................................................................
Hill Energy Resource & Services, LLC ............................................................................................................................................
KEPCO Solar of Alamosa LLC .........................................................................................................................................................
KODA Energy, LLC ..........................................................................................................................................................................
Lazarus Energy Holdings, LLC .........................................................................................................................................................
Light Power & Gas LLC ....................................................................................................................................................................
Major Lending, LLC ..........................................................................................................................................................................
Manifold Energy Inc ..........................................................................................................................................................................
Monterey Consulting Associates, Inc ...............................................................................................................................................
Myotis Power Marketing LLC ...........................................................................................................................................................
NFI Solar, LLC ..................................................................................................................................................................................
North Branch Resources, LLC .........................................................................................................................................................
PACE RENEWABLE ENERGY 1 LLC .............................................................................................................................................
PGPV, LLC .......................................................................................................................................................................................
Piedmont Energy Fund, LP ..............................................................................................................................................................
Power Choice Inc .............................................................................................................................................................................
RDAF Energy Solutions, LLC ...........................................................................................................................................................
Renaissance Power, L.L.C ...............................................................................................................................................................
Renewable Power Direct, LLC .........................................................................................................................................................
Rigby Energy Resources, LP ...........................................................................................................................................................
RJUMR ENERGY PARTNERS CORP .............................................................................................................................................
RLD Resources, LLC ........................................................................................................................................................................
Silver Bear Power, LLC ....................................................................................................................................................................
Smith Creek Hydro, LLC ..................................................................................................................................................................
Southard Energy Partners, LLC .......................................................................................................................................................
Southern California Telephone Company ........................................................................................................................................
Spruance Genco, LLC ......................................................................................................................................................................
Sunbury Energy, LLC .......................................................................................................................................................................
Texzon Utilities, Ltd ..........................................................................................................................................................................
Thicksten Grimm Burgum, Inc ..........................................................................................................................................................
Trane Grid Services LLC ..................................................................................................................................................................
Tropicana Manufacturing Company Inc ...........................................................................................................................................
UBS AG ............................................................................................................................................................................................
Viridity Energy, Inc ............................................................................................................................................................................
Volunteer Energy Services, Inc ........................................................................................................................................................
Western Aeon Energy Trading LLC .................................................................................................................................................
Western Reserve Energy Services, LLC ..........................................................................................................................................
White Pine Electric Power L.L.C ......................................................................................................................................................
Windy Flats Partners, LLC ...............................................................................................................................................................
Woomera Energy, LLC .....................................................................................................................................................................
Z&Y Energy Trading LLC .................................................................................................................................................................
On September 22, 2022, the
Commission issued an order
announcing its intent to revoke the
market-based rate authority of the
sellers 1 captioned above that had failed
1 A ‘‘seller’’ is defined as any person that has
authorization to or seeks authorization to engage in
sales for resale of electric energy, capacity or
ancillary services at market-based rates under
VerDate Sep<11>2014
19:33 Nov 25, 2022
Jkt 259001
to file their baseline submissions to the
market-based rate relational database,2
section 205 of the Federal Power Act (FPA). 18 CFR
35.36(a)(1); 16 U.S.C. 824d. Each seller is a public
utility under section 205 of the FPA. 16 U.S.C. 824.
2 Data Collection for Analytics & Surveillance &
Mkt.-Based Rate Purposes, 180 FERC ¶ 61,170
(2022) (September 22 Order).
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
ER19–1826–001
ER13–357–001
ER12–1472–000
ER14–1858–000
ER09–560–000
ER13–797–000
ER95–428–000
ER13–1646–001
ER08–425–000
ER11–2730–000
ER00–136–000
ER09–1075–000
ER07–1247–002
ER05–1079–000
ER11–4536–000
ER11–2825–000
ER20–2087–000
ER12–346–000
ER03–833–000
ER09–712–000
ER12–1613–001
ER11–4050–000
ER09–107–000
ER08–848–000
ER21–1768–000
ER05–744–000
ER18–1549–000
ER11–4603–000
ER13–1249–002
ER10–904–000
ER03–293–000
ER19–178–001
ER12–1603–001
ER13–1135–001
ER10–812–000
ER16–895–002
ER01–3109–000
ER14–1135–000
ER14–166–000
ER14–2013–000
ER12–1244–001
ER13–733–000
ER16–904–001
ER13–698–000
ER11–3186–000
ER06–634–000
ER13–113–002
ER03–1150–000
ER11–4604–000
ER13–1107–000
ER11–2962–001
ER02–973–000
ER11–4706–001
ER04–937–000
ER21–908–000
ER11–3263–000
ER04–262–000
ER09–750–000
ER18–624–000
ER18–2031–000
as required by Order No. 860.3 The
Commission directed those sellers to file
the required baseline submissions
within 15 days of the date of issuance
of the September 22 Order or face
3 Data Collection for Analytics & Surveillance &
Mkt.-Based Rate Purposes, Order No. 860, 168
FERC ¶ 61,039 (2019), order on reh’g, Order No.
860–A, 170 FERC ¶ 61,129 (2020).
E:\FR\FM\28NON1.SGM
28NON1
72986
Federal Register / Vol. 87, No. 227 / Monday, November 28, 2022 / Notices
revocation of their authority to sell
power at market-based rates and
termination of their electric marketbased rate tariffs.4 On October 14, 2022,
the above-captioned sellers were
granted an extension of time to satisfy
the Commission’s requirements in Order
No. 860, and the directives of the
September 22 Order, up to and
including October 21, 2022.5
The time period for compliance with
the September 22 Order and the October
14 Extension has elapsed. The abovecaptioned sellers failed to file their
delinquent baseline submissions to the
market-based rate relational database.
The Commission hereby revokes,
effective as of the date of issuance of
this notice, the market-based rate
authority and terminates the electric
market-based rate tariff of each of the
sellers who are named in the caption of
this order. This revocation does not
preclude the above-captioned sellers
from re-applying for market-based rate
authority.
Dated: November 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–25831 Filed 11–25–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9260–051]
khammond on DSKJM1Z7X2PROD with NOTICES
Sissonville Limited Partnership; Notice
of Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Extension of
License Term.
b. Project No: P–9260–051.
c. Date Filed: November 7, 2022.
d. Applicant: Sissonville Limited
Partnership.
e. Name of Project: Sissonville
Hydroelectric Project (P–9260).
f. Location: The project is located on
the Raquette River in the town of
Potsdam, St. Lawrence County, New
York.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
4 September 22 Order, 180 FERC ¶ 61,170 at
Ordering Paragraph A.
5 Data Collection for Analytics & Surveillance &
Mkt.-Based Rate Purposes, Notice of Extension of
Time, Docket No. RM16–17–000 (Oct. 14, 2022)
(October 14 Extension).
VerDate Sep<11>2014
19:33 Nov 25, 2022
Jkt 259001
h. Applicant Contact: Erik Bergman,
Manager, Boralex Hydro Operations,
Inc., 39 Hudson Falls Road, South Glens
Falls, New York 12803, (518) 747–0930,
erik.bergman@boralex.com.
i. FERC Contact: Maryam Akhavan,
(202) 502–6110, Maryam.Akhavan@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
December 21, 2022.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–9260–051. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Sissonville
Limited Partnership, licensee for the
Sissonville Hydroelectric Project No.
9260 filed a request with the
Commission for a 5-year, 8-month
extension of the 40-year license for the
project, currently expiring on April 30,
2028. The new expiration date for the
project would be December 31, 2033.
The licensee requests the extension to
align the project license expiration date
with several other licensed
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
hydroelectric projects located in the
lower Raquette River Basin. The
licensee states that aligning the
expiration dates for the projects would
allow a more synchronized approach to
the relicensing process. In addition, as
requested by the New York State
Department of Environmental
Conservation and U.S. Fish and Wildlife
Service, in exchange for support for the
license extension, the licensee has
agreed to conduct an eel study of the
lower Raquette River and collect
information on American eel
distribution.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
E:\FR\FM\28NON1.SGM
28NON1
Agencies
[Federal Register Volume 87, Number 227 (Monday, November 28, 2022)]
[Notices]
[Pages 72984-72986]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-25831]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Revocation of Market-Based Rate Authority and
Termination of Electric Market-Based Rate Tariff
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Data Collection for Analytics and RM16-17-001
Surveillance and Market-Based Rate
Purposes.
3C Solar LLC........................... ER11-2649-000
Apple Group............................ ER07-1287-001
Backyard Farms Energy LLC.............. ER09-1689-000
BITH Energy, Inc....................... ER13-48-000
BITH Solar 1, LLC...................... ER13-29-000
[[Page 72985]]
Bolt Energy, LLC....................... ER19-1826-001
Cirrus Wind 1, LLC..................... ER13-357-001
Conch Energy Trading, LLC.............. ER12-1472-000
Consolidated Power Co., LLC............ ER14-1858-000
Covanta Maine, LLC..................... ER09-560-000
EBRFUEL, LLC........................... ER13-797-000
El Paso Marketing Company, L.L.C....... ER95-428-000
Electron Hydro, LLC.................... ER13-1646-001
Energy Exchange Direct, LLC............ ER08-425-000
Energy Exchange International, LLC..... ER11-2730-000
EONY Generation Limited................ ER00-136-000
Falcon Energy, LLC..................... ER09-1075-000
FC Energy Services Company, LLC........ ER07-1247-002
FOREST INVESTMENT GROUP, LLC........... ER05-1079-000
Full Circle Renewables, LLC............ ER11-4536-000
GBC Metals LLC......................... ER11-2825-000
Gichi Noodin Wind Farm, LLC............ ER20-2087-000
Global Energy, LLC..................... ER12-346-000
Hawkeye Energy Greenport, LLC.......... ER03-833-000
High Lonesome Mesa, LLC................ ER09-712-000
Hill Energy Resource & Services, LLC... ER12-1613-001
KEPCO Solar of Alamosa LLC............. ER11-4050-000
KODA Energy, LLC....................... ER09-107-000
Lazarus Energy Holdings, LLC........... ER08-848-000
Light Power & Gas LLC.................. ER21-1768-000
Major Lending, LLC..................... ER05-744-000
Manifold Energy Inc.................... ER18-1549-000
Monterey Consulting Associates, Inc.... ER11-4603-000
Myotis Power Marketing LLC............. ER13-1249-002
NFI Solar, LLC......................... ER10-904-000
North Branch Resources, LLC............ ER03-293-000
PACE RENEWABLE ENERGY 1 LLC............ ER19-178-001
PGPV, LLC.............................. ER12-1603-001
Piedmont Energy Fund, LP............... ER13-1135-001
Power Choice Inc....................... ER10-812-000
RDAF Energy Solutions, LLC............. ER16-895-002
Renaissance Power, L.L.C............... ER01-3109-000
Renewable Power Direct, LLC............ ER14-1135-000
Rigby Energy Resources, LP............. ER14-166-000
RJUMR ENERGY PARTNERS CORP............. ER14-2013-000
RLD Resources, LLC..................... ER12-1244-001
Silver Bear Power, LLC................. ER13-733-000
Smith Creek Hydro, LLC................. ER16-904-001
Southard Energy Partners, LLC.......... ER13-698-000
Southern California Telephone Company.. ER11-3186-000
Spruance Genco, LLC.................... ER06-634-000
Sunbury Energy, LLC.................... ER13-113-002
Texzon Utilities, Ltd.................. ER03-1150-000
Thicksten Grimm Burgum, Inc............ ER11-4604-000
Trane Grid Services LLC................ ER13-1107-000
Tropicana Manufacturing Company Inc.... ER11-2962-001
UBS AG................................. ER02-973-000
Viridity Energy, Inc................... ER11-4706-001
Volunteer Energy Services, Inc......... ER04-937-000
Western Aeon Energy Trading LLC........ ER21-908-000
Western Reserve Energy Services, LLC... ER11-3263-000
White Pine Electric Power L.L.C........ ER04-262-000
Windy Flats Partners, LLC.............. ER09-750-000
Woomera Energy, LLC.................... ER18-624-000
Z&Y Energy Trading LLC................. ER18-2031-000
------------------------------------------------------------------------
On September 22, 2022, the Commission issued an order announcing
its intent to revoke the market-based rate authority of the sellers \1\
captioned above that had failed to file their baseline submissions to
the market-based rate relational database,\2\ as required by Order No.
860.\3\ The Commission directed those sellers to file the required
baseline submissions within 15 days of the date of issuance of the
September 22 Order or face
[[Page 72986]]
revocation of their authority to sell power at market-based rates and
termination of their electric market-based rate tariffs.\4\ On October
14, 2022, the above-captioned sellers were granted an extension of time
to satisfy the Commission's requirements in Order No. 860, and the
directives of the September 22 Order, up to and including October 21,
2022.\5\
---------------------------------------------------------------------------
\1\ A ``seller'' is defined as any person that has authorization
to or seeks authorization to engage in sales for resale of electric
energy, capacity or ancillary services at market-based rates under
section 205 of the Federal Power Act (FPA). 18 CFR 35.36(a)(1); 16
U.S.C. 824d. Each seller is a public utility under section 205 of
the FPA. 16 U.S.C. 824.
\2\ Data Collection for Analytics & Surveillance & Mkt.-Based
Rate Purposes, 180 FERC ] 61,170 (2022) (September 22 Order).
\3\ Data Collection for Analytics & Surveillance & Mkt.-Based
Rate Purposes, Order No. 860, 168 FERC ] 61,039 (2019), order on
reh'g, Order No. 860-A, 170 FERC ] 61,129 (2020).
\4\ September 22 Order, 180 FERC ] 61,170 at Ordering Paragraph
A.
\5\ Data Collection for Analytics & Surveillance & Mkt.-Based
Rate Purposes, Notice of Extension of Time, Docket No. RM16-17-000
(Oct. 14, 2022) (October 14 Extension).
---------------------------------------------------------------------------
The time period for compliance with the September 22 Order and the
October 14 Extension has elapsed. The above-captioned sellers failed to
file their delinquent baseline submissions to the market-based rate
relational database. The Commission hereby revokes, effective as of the
date of issuance of this notice, the market-based rate authority and
terminates the electric market-based rate tariff of each of the sellers
who are named in the caption of this order. This revocation does not
preclude the above-captioned sellers from re-applying for market-based
rate authority.
Dated: November 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-25831 Filed 11-25-22; 8:45 am]
BILLING CODE 6717-01-P