Combined Notice of Filings, 71620 [2022-25557]
Download as PDF
71620
Federal Register / Vol. 87, No. 225 / Wednesday, November 23, 2022 / Notices
lotter on DSK11XQN23PROD with NOTICES1
1. I concur in today’s order.1 I remain
gravely concerned about the North
American Electric Reliability
Corporation’s (NERC) inability to act
swiftly and nimbly in response to
emerging risks that threaten the
reliability of the Bulk-Power System
(BPS). This is due in no small part to the
statutory framework of Federal Power
Act (FPA) section 215.2 According to
NERC’s Inverter-Based Resource (IBR)
Strategy document,3 ‘‘[t]he [Electric
Reliability Organization (ERO)]
Enterprise has analyzed numerous
widespread IBR loss events and
identified many systemic performance
issues with the inverter-based fleet over
the past six years.’’ 4 NERC explains that
‘‘[t]he disturbance reports, alerts,
guidelines, and other deliverables
developed by the ERO thus far have
highlighted that abnormal IBR
performance issues pose a significant
risk to BPS reliability.’’ 5 Our actions
today in this and another proceeding 6
propose firm deadlines by which NERC
must act to register and hold IBR
entities accountable for failure to
comply with mandatory and enforceable
Reliability Standards.
2. Better late than never, I suppose.
Nevertheless, it could be at least four
years before certain of the IBR entities
are registered and another five years
before the full suite of contemplated
requirements are mandatory and
enforceable. So, it will be about ten or
eleven years after the significant
reliability risk was definitively
identified that we will have required
registration and Reliability Standards in
place. The reliability consequences that
attend the rapid deployment of an
unprecedented number of IBRs are, at
this point, unarguable. As NERC’s
President and CEO explained last week:
‘‘the pace of the transformation of the
electric system needs to be managed and
that transition needs to occur in an
orderly way.’’ 7 Mandatory reliability
standards must be implemented as
quickly as possible to ensure the reliable
operation of the BPS. We at FERC are
1 Registration of Inverter-based Resources, 181
FERC ¶ 61,124 (2022).
2 16 U.S.C. 824o.
3 NERC, Inverter-Based Resource Strategy:
Ensuring Reliability of the Bulk Power System with
Increased Levels of BPS-Connected IBRs (Issued
Sep. 14, 2022), https://www.nerc.com/comm/
Documents/NERC_IBR_Strategy.pdf.
4 Id. at 3.
5 Id. at 5.
6 Reliability Standards to Address Inverter-Based
Resources, 181 FERC ¶ 61,125 (2022).
7 Statement of James B. Robb, Annual
Commissioner-led Reliability Technical Conference
(Nov. 10, 2022), https://www.ferc.gov/news-events/
events/annual-commissioner-led-reliabilitytechnical-conference-11102022.
VerDate Sep<11>2014
16:45 Nov 22, 2022
Jkt 259001
responsible for the reliability of the BPS
under FPA section 215. I fear we may
be taking too long to address reliability
challenges that urgently need our
attention.
For these reasons, I respectfully
concur.
James P. Danly,
Commissioner.
[FR Doc. 2022–25589 Filed 11–22–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–186–000.
Applicants: Discovery Gas
Transmission LLC.
Description: § 4(d) Rate Filing: 2023
HMRE Surcharge Filing to be effective
1/1/2023.
Filed Date: 11/15/22.
Accession Number: 20221115–5001.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23–187–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Nov 2022 Clean-up
Filing to be effective 12/15/2022.
Filed Date: 11/15/22.
Accession Number: 20221115–5008.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23–188–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Perm Release
Oglethorpe to Eastman to be effective
11/15/2022.
Filed Date: 11/15/22.
Accession Number: 20221115–5025.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23–189–000.
Applicants: Sierrita Gas Pipeline LLC.
Description: Compliance filing:
Sierrita Opertional Purchase and Sales
Report 2022 to be effective N/A.
Filed Date: 11/15/22.
Accession Number: 20221115–5053.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23–190–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing:
Revision to Part 8, Section 25 to be
effective 12/16/2022.
Filed Date: 11/15/22.
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
Accession Number: 20221115–5085.
Comment Date: 5 p.m. ET 11/28/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–25557 Filed 11–22–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1988–100]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
Temporary Variance of Minimum Flow
Requirement.
b. Project No: 1988–100.
c. Date Filed: October 31, 2022.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Haas-Kings River
Project.
f. Location: The project is located on
the North Fork Kings River in Fresno
County, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Erin Wick,
License Coordinator, Pacific Gas and
Electric Company, (559) 203–4310.
i. FERC Contact: Katherine Schmidt,
(415) 369–3348, katherine.schmidt@
ferc.gov.
E:\FR\FM\23NON1.SGM
23NON1
Agencies
[Federal Register Volume 87, Number 225 (Wednesday, November 23, 2022)]
[Notices]
[Page 71620]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-25557]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23-186-000.
Applicants: Discovery Gas Transmission LLC.
Description: Sec. 4(d) Rate Filing: 2023 HMRE Surcharge Filing to
be effective 1/1/2023.
Filed Date: 11/15/22.
Accession Number: 20221115-5001.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23-187-000.
Applicants: East Tennessee Natural Gas, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rates--Nov 2022
Clean-up Filing to be effective 12/15/2022.
Filed Date: 11/15/22.
Accession Number: 20221115-5008.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23-188-000.
Applicants: East Tennessee Natural Gas, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--Perm Release
Oglethorpe to Eastman to be effective 11/15/2022.
Filed Date: 11/15/22.
Accession Number: 20221115-5025.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23-189-000.
Applicants: Sierrita Gas Pipeline LLC.
Description: Compliance filing: Sierrita Opertional Purchase and
Sales Report 2022 to be effective N/A.
Filed Date: 11/15/22.
Accession Number: 20221115-5053.
Comment Date: 5 p.m. ET 11/28/22.
Docket Numbers: RP23-190-000.
Applicants: Midwestern Gas Transmission Company.
Description: Sec. 4(d) Rate Filing: Revision to Part 8, Section 25
to be effective 12/16/2022.
Filed Date: 11/15/22.
Accession Number: 20221115-5085.
Comment Date: 5 p.m. ET 11/28/22.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-25557 Filed 11-22-22; 8:45 am]
BILLING CODE 6717-01-P