Great Basin Gas Transmission Company; Notice of Availability of the Environmental Assessment for the Proposed 2023 Mainline Replacement Project, 69019-69020 [2022-25042]
Download as PDF
Federal Register / Vol. 87, No. 221 / Thursday, November 17, 2022 / Notices
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
lotter on DSK11XQN23PROD with NOTICES1
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before January 9,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–8–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing.’’ The
Commission’s eFiling staff are available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
(2) You can file a paper copy of your
submission. Your submission must
reference the Project docket number
CP23–8–000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Protests and motions to intervene
must be served on the applicant either
VerDate Sep<11>2014
17:26 Nov 16, 2022
Jkt 259001
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager, Project Authorizations,
Columbia Gas Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002, by telephone (832) 320–
5477, or by email david_alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: November 10, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–25045 Filed 11–16–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–141–000]
Great Basin Gas Transmission
Company; Notice of Availability of the
Environmental Assessment for the
Proposed 2023 Mainline Replacement
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
2023 Mainline Replacement Project
(Project) proposed by Great Basin Gas
Transmission Company (Great Basin) in
the above-referenced docket. Great
Basin proposes to abandon in-place or
abandon by removal approximately 20.4
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
69019
miles of its existing 16-inch-diameter
steel pipeline and construct as
replacement approximately 20.4 miles
of new 16-inch-diameter steel pipeline
in Humboldt County, Nevada.
According to Great Basin, the
replacement is needed to address
indications that the subject segment is
approaching the end of its useful life, as
demonstrated by preventative integrity
assessments, including inline
inspections and direct assessments. The
Project would provide no new
transportation capacity.
The EA assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The Bureau of Land Management
(BLM) and Environmental Protection
Agency participated as cooperating
agencies in the preparation of the EA.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis.
The proposed Project includes the
following activities and facilities:
• abandonment in-place or by
removal of 20.4 miles of existing 16inch-diameter steel pipeline;
• construction of 20.4 miles of new
16-inch-diameter steel pipeline to
replace the abandoned pipeline; and
• removal of existing valves and
replace with new valves and associated
appurtenances within Great Basin’s
existing Elko Lateral Tap yard.
The Commission mailed a copy of the
Notice of Availability of the EA to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The EA is only available in
electronic format. It may be viewed and
downloaded from the FERC’s website
(www.ferc.gov), on the natural gas
environmental documents page (https://
www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the EA may be
accessed by using the eLibrary link on
the FERC’s website. Click on the
eLibrary link (https://elibrary.ferc.gov/
eLibrary/search), select ‘‘General
Search’’ and enter the docket number in
E:\FR\FM\17NON1.SGM
17NON1
lotter on DSK11XQN23PROD with NOTICES1
69020
Federal Register / Vol. 87, No. 221 / Thursday, November 17, 2022 / Notices
the ‘‘Docket Number’’ field, excluding
the last three digits (i.e., CP22–141). Be
sure you have selected an appropriate
date range. For assistance, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
The EA is not a decision document.
It presents Commission staff’s
independent analysis of the
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding. Any person wishing to
comment on the EA may do so. Your
comments should focus on the EA’s
disclosure and discussion of potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before 5:00 p.m. Eastern Time on
December 12, 2022.
For your convenience, there are three
methods you can use to file your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. This is an easy method for
submitting brief, text-only comments on
a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You must select the type of
filing you are making. If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP22–141–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
VerDate Sep<11>2014
17:26 Nov 16, 2022
Jkt 259001
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Filing environmental comments will
not give you intervenor status, but you
do not need intervenor status to have
your comments considered. Only
intervenors have the right to seek
rehearing or judicial review of the
Commission’s decision. At this point in
this proceeding, the timeframe for filing
timely intervention requests has
expired. Any person seeking to become
a party to the proceeding must file a
motion to intervene out-of-time
pursuant to Rule 214(b)(3) and (d) of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time
limitation should be waived. Motions to
intervene are more fully described at
https://www.ferc.gov/ferc-online/ferconline/how-guides.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: November 10, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–25042 Filed 11–16–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23–6–000.
Applicants: Questar Gas Company.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Description: § 284.123 Rate Filing:
Baseline Refile SOC to be effective 12/
1/2022.
Filed Date: 11/10/22.
Accession Number: 20221110–5043.
Comment Date: 5 p.m. ET 12/1/22.
Docket Numbers: RP23–178–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2022–11–09 Negotiated Rate Agreement
to be effective 11/9/2022.
Filed Date: 11/9/22
Accession Number: 20221109–5095
Comment Date: 5 p.m. ET 11/21/22.
Docket Numbers: RP23–179–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: TPC
2022–11–09 Negotiated Rate Agreement
to be effective 11/9/2022.
Filed Date: 11/9/22.
Accession Number: 20221109–5096.
Comment Date: 5 p.m. ET 11/21/22.
Docket Numbers: RP23–180–000.
Applicants: Eastern Shore Natural Gas
Company.
Description: § 4(d) Rate Filing: ESNG
Operational Purchases and Sales to be
effective 12/10/2022.
Filed Date: 11/10/22.
Accession Number: 20221110–5079.
Comment Date: 5 p.m. ET 11/22/22.
Docket Numbers: RP23–181–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: TPC
2022–11–10 Negotiated Rate Agreement
to be effective 11/10/2022.
Filed Date: 11/10/22.
Accession Number: 20221110–5094.
Comment Date: 5 p.m. ET 11/22/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP22–824–000.
Applicants: Young Gas Storage
Company, Ltd.
Description: Refund Report: Refund
Report in Docket No. RP22–824 to be
effective N/A.
Filed Date: 11/9/22.
Accession Number: 20221109–5103.
Comment Date: 5 p.m. ET 11/21/22.
Docket Numbers: RP22–825–000.
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: Refund Report: Refund
Report in Docket No. RP22–825–000 to
be effective N/A.
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 87, Number 221 (Thursday, November 17, 2022)]
[Notices]
[Pages 69019-69020]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-25042]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-141-000]
Great Basin Gas Transmission Company; Notice of Availability of
the Environmental Assessment for the Proposed 2023 Mainline Replacement
Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the 2023
Mainline Replacement Project (Project) proposed by Great Basin Gas
Transmission Company (Great Basin) in the above-referenced docket.
Great Basin proposes to abandon in-place or abandon by removal
approximately 20.4 miles of its existing 16-inch-diameter steel
pipeline and construct as replacement approximately 20.4 miles of new
16-inch-diameter steel pipeline in Humboldt County, Nevada. According
to Great Basin, the replacement is needed to address indications that
the subject segment is approaching the end of its useful life, as
demonstrated by preventative integrity assessments, including inline
inspections and direct assessments. The Project would provide no new
transportation capacity.
The EA assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act (NEPA). The FERC
staff concludes that approval of the proposed project, with appropriate
mitigating measures, would not constitute a major federal action
significantly affecting the quality of the human environment.
The Bureau of Land Management (BLM) and Environmental Protection
Agency participated as cooperating agencies in the preparation of the
EA. Cooperating agencies have jurisdiction by law or special expertise
with respect to resources potentially affected by the proposal and
participate in the NEPA analysis.
The proposed Project includes the following activities and
facilities:
abandonment in-place or by removal of 20.4 miles of
existing 16-inch-diameter steel pipeline;
construction of 20.4 miles of new 16-inch-diameter steel
pipeline to replace the abandoned pipeline; and
removal of existing valves and replace with new valves and
associated appurtenances within Great Basin's existing Elko Lateral Tap
yard.
The Commission mailed a copy of the Notice of Availability of the
EA to federal, state, and local government representatives and
agencies; elected officials; environmental and public interest groups;
Native American tribes; potentially affected landowners and other
interested individuals and groups; and newspapers and libraries in the
project area. The EA is only available in electronic format. It may be
viewed and downloaded from the FERC's website (www.ferc.gov), on the
natural gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In
addition, the EA may be accessed by using the eLibrary link on the
FERC's website. Click on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search), select ``General Search'' and enter the docket number
in
[[Page 69020]]
the ``Docket Number'' field, excluding the last three digits (i.e.,
CP22-141). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
The EA is not a decision document. It presents Commission staff's
independent analysis of the environmental issues for the Commission to
consider when addressing the merits of all issues in this proceeding.
Any person wishing to comment on the EA may do so. Your comments should
focus on the EA's disclosure and discussion of potential environmental
effects, reasonable alternatives, and measures to avoid or lessen
environmental impacts. The more specific your comments, the more useful
they will be. To ensure that the Commission has the opportunity to
consider your comments prior to making its decision on this project, it
is important that we receive your comments in Washington, DC on or
before 5:00 p.m. Eastern Time on December 12, 2022.
For your convenience, there are three methods you can use to file
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov) under the link to
FERC Online. This is an easy method for submitting brief, text-only
comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's website (www.ferc.gov) under the
link to FERC Online. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP22-
141-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Filing environmental comments will not give you intervenor status,
but you do not need intervenor status to have your comments considered.
Only intervenors have the right to seek rehearing or judicial review of
the Commission's decision. At this point in this proceeding, the
timeframe for filing timely intervention requests has expired. Any
person seeking to become a party to the proceeding must file a motion
to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time limitation should be waived.
Motions to intervene are more fully described at https://www.ferc.gov/ferc-online/ferc-online/how-guides.
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/ferc-online/overview to
register for eSubscription.
Dated: November 10, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-25042 Filed 11-16-22; 8:45 am]
BILLING CODE 6717-01-P