Great Basin Gas Transmission Company; Notice of Availability of the Environmental Assessment for the Proposed 2023 Mainline Replacement Project, 69019-69020 [2022-25042]

Download as PDF Federal Register / Vol. 87, No. 221 / Thursday, November 17, 2022 / Notices operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. lotter on DSK11XQN23PROD with NOTICES1 Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before January 9, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–8–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing.’’ The Commission’s eFiling staff are available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. (2) You can file a paper copy of your submission. Your submission must reference the Project docket number CP23–8–000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Protests and motions to intervene must be served on the applicant either VerDate Sep<11>2014 17:26 Nov 16, 2022 Jkt 259001 by mail or email (with a link to the document) at: David A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002, by telephone (832) 320– 5477, or by email david_alonzo@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: November 10, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–25045 Filed 11–16–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–141–000] Great Basin Gas Transmission Company; Notice of Availability of the Environmental Assessment for the Proposed 2023 Mainline Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the 2023 Mainline Replacement Project (Project) proposed by Great Basin Gas Transmission Company (Great Basin) in the above-referenced docket. Great Basin proposes to abandon in-place or abandon by removal approximately 20.4 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 69019 miles of its existing 16-inch-diameter steel pipeline and construct as replacement approximately 20.4 miles of new 16-inch-diameter steel pipeline in Humboldt County, Nevada. According to Great Basin, the replacement is needed to address indications that the subject segment is approaching the end of its useful life, as demonstrated by preventative integrity assessments, including inline inspections and direct assessments. The Project would provide no new transportation capacity. The EA assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The Bureau of Land Management (BLM) and Environmental Protection Agency participated as cooperating agencies in the preparation of the EA. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis. The proposed Project includes the following activities and facilities: • abandonment in-place or by removal of 20.4 miles of existing 16inch-diameter steel pipeline; • construction of 20.4 miles of new 16-inch-diameter steel pipeline to replace the abandoned pipeline; and • removal of existing valves and replace with new valves and associated appurtenances within Great Basin’s existing Elko Lateral Tap yard. The Commission mailed a copy of the Notice of Availability of the EA to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The EA is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the natural gas environmental documents page (https:// www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the EA may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https://elibrary.ferc.gov/ eLibrary/search), select ‘‘General Search’’ and enter the docket number in E:\FR\FM\17NON1.SGM 17NON1 lotter on DSK11XQN23PROD with NOTICES1 69020 Federal Register / Vol. 87, No. 221 / Thursday, November 17, 2022 / Notices the ‘‘Docket Number’’ field, excluding the last three digits (i.e., CP22–141). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The EA is not a decision document. It presents Commission staff’s independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the EA’s disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on December 12, 2022. For your convenience, there are three methods you can use to file your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP22–141–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, VerDate Sep<11>2014 17:26 Nov 16, 2022 Jkt 259001 DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. At this point in this proceeding, the timeframe for filing timely intervention requests has expired. Any person seeking to become a party to the proceeding must file a motion to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission’s Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and show good cause why the time limitation should be waived. Motions to intervene are more fully described at https://www.ferc.gov/ferc-online/ferconline/how-guides. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: November 10, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–25042 Filed 11–16–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: PR23–6–000. Applicants: Questar Gas Company. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 Description: § 284.123 Rate Filing: Baseline Refile SOC to be effective 12/ 1/2022. Filed Date: 11/10/22. Accession Number: 20221110–5043. Comment Date: 5 p.m. ET 12/1/22. Docket Numbers: RP23–178–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: REX 2022–11–09 Negotiated Rate Agreement to be effective 11/9/2022. Filed Date: 11/9/22 Accession Number: 20221109–5095 Comment Date: 5 p.m. ET 11/21/22. Docket Numbers: RP23–179–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: TPC 2022–11–09 Negotiated Rate Agreement to be effective 11/9/2022. Filed Date: 11/9/22. Accession Number: 20221109–5096. Comment Date: 5 p.m. ET 11/21/22. Docket Numbers: RP23–180–000. Applicants: Eastern Shore Natural Gas Company. Description: § 4(d) Rate Filing: ESNG Operational Purchases and Sales to be effective 12/10/2022. Filed Date: 11/10/22. Accession Number: 20221110–5079. Comment Date: 5 p.m. ET 11/22/22. Docket Numbers: RP23–181–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: TPC 2022–11–10 Negotiated Rate Agreement to be effective 11/10/2022. Filed Date: 11/10/22. Accession Number: 20221110–5094. Comment Date: 5 p.m. ET 11/22/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP22–824–000. Applicants: Young Gas Storage Company, Ltd. Description: Refund Report: Refund Report in Docket No. RP22–824 to be effective N/A. Filed Date: 11/9/22. Accession Number: 20221109–5103. Comment Date: 5 p.m. ET 11/21/22. Docket Numbers: RP22–825–000. Applicants: Colorado Interstate Gas Company, L.L.C. Description: Refund Report: Refund Report in Docket No. RP22–825–000 to be effective N/A. E:\FR\FM\17NON1.SGM 17NON1

Agencies

[Federal Register Volume 87, Number 221 (Thursday, November 17, 2022)]
[Notices]
[Pages 69019-69020]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-25042]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP22-141-000]


Great Basin Gas Transmission Company; Notice of Availability of 
the Environmental Assessment for the Proposed 2023 Mainline Replacement 
Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the 2023 
Mainline Replacement Project (Project) proposed by Great Basin Gas 
Transmission Company (Great Basin) in the above-referenced docket. 
Great Basin proposes to abandon in-place or abandon by removal 
approximately 20.4 miles of its existing 16-inch-diameter steel 
pipeline and construct as replacement approximately 20.4 miles of new 
16-inch-diameter steel pipeline in Humboldt County, Nevada. According 
to Great Basin, the replacement is needed to address indications that 
the subject segment is approaching the end of its useful life, as 
demonstrated by preventative integrity assessments, including inline 
inspections and direct assessments. The Project would provide no new 
transportation capacity.
    The EA assesses the potential environmental effects of the 
construction and operation of the Project in accordance with the 
requirements of the National Environmental Policy Act (NEPA). The FERC 
staff concludes that approval of the proposed project, with appropriate 
mitigating measures, would not constitute a major federal action 
significantly affecting the quality of the human environment.
    The Bureau of Land Management (BLM) and Environmental Protection 
Agency participated as cooperating agencies in the preparation of the 
EA. Cooperating agencies have jurisdiction by law or special expertise 
with respect to resources potentially affected by the proposal and 
participate in the NEPA analysis.
    The proposed Project includes the following activities and 
facilities:
     abandonment in-place or by removal of 20.4 miles of 
existing 16-inch-diameter steel pipeline;
     construction of 20.4 miles of new 16-inch-diameter steel 
pipeline to replace the abandoned pipeline; and
     removal of existing valves and replace with new valves and 
associated appurtenances within Great Basin's existing Elko Lateral Tap 
yard.
    The Commission mailed a copy of the Notice of Availability of the 
EA to federal, state, and local government representatives and 
agencies; elected officials; environmental and public interest groups; 
Native American tribes; potentially affected landowners and other 
interested individuals and groups; and newspapers and libraries in the 
project area. The EA is only available in electronic format. It may be 
viewed and downloaded from the FERC's website (www.ferc.gov), on the 
natural gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In 
addition, the EA may be accessed by using the eLibrary link on the 
FERC's website. Click on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search), select ``General Search'' and enter the docket number 
in

[[Page 69020]]

the ``Docket Number'' field, excluding the last three digits (i.e., 
CP22-141). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    The EA is not a decision document. It presents Commission staff's 
independent analysis of the environmental issues for the Commission to 
consider when addressing the merits of all issues in this proceeding. 
Any person wishing to comment on the EA may do so. Your comments should 
focus on the EA's disclosure and discussion of potential environmental 
effects, reasonable alternatives, and measures to avoid or lessen 
environmental impacts. The more specific your comments, the more useful 
they will be. To ensure that the Commission has the opportunity to 
consider your comments prior to making its decision on this project, it 
is important that we receive your comments in Washington, DC on or 
before 5:00 p.m. Eastern Time on December 12, 2022.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
FERC Online. This is an easy method for submitting brief, text-only 
comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's website (www.ferc.gov) under the 
link to FERC Online. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP22-
141-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Filing environmental comments will not give you intervenor status, 
but you do not need intervenor status to have your comments considered. 
Only intervenors have the right to seek rehearing or judicial review of 
the Commission's decision. At this point in this proceeding, the 
timeframe for filing timely intervention requests has expired. Any 
person seeking to become a party to the proceeding must file a motion 
to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the 
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and 
(d)) and show good cause why the time limitation should be waived. 
Motions to intervene are more fully described at https://www.ferc.gov/ferc-online/ferc-online/how-guides.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link 
also provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/ferc-online/overview to 
register for eSubscription.

    Dated: November 10, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-25042 Filed 11-16-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.