GE-Hitachi Nuclear Energy Americas, LLC; Morris Operation Independent Spent Fuel Storage Installation, 69053-69055 [2022-24993]
Download as PDF
Federal Register / Vol. 87, No. 221 / Thursday, November 17, 2022 / Notices
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
lotter on DSK11XQN23PROD with NOTICES1
II. Additional Information
The NRC is issuing for public
comment a DG in the NRC’s ‘‘Regulatory
Guide’’ series. This series was
developed to describe methods that are
acceptable to the NRC staff for
implementing specific parts of the
agency’s regulations, to explain
techniques that the staff uses in
evaluating specific issues or postulated
events, and to describe information that
the staff needs in its review of
applications for permits and licenses.
The DG, entitled ‘‘Performance-Based
Containment Leak Test Program,’’ is
temporarily identified by its task
number, DG–1391 (ADAMS Accession
No. ML22006A317).
This revision of the guide (Revision 1)
addresses new guidance for
implementing Option B ‘‘PerformanceBased Requirements’’ of Appendix J,
‘‘Primary Reactor Containment Leakage
Testing for Water-Cooled Power
Reactors,’’ of part 50 of title 10 of the
Code of Federal Regulations (10 CFR).
Specifically, extending Type A test
intervals up to 15 years, extending Type
C test intervals up to 75 months, and an
update to ANSI/ANS–56.8–2020 for
acceptable industry standards on
technical methods and techniques for
performing Types A, B, and C tests. This
proposed revised guide contains
information specific for a leakage rate
testing program for both older plants
and newer reactors licensed under both
10 CFR parts 50 and 52.
The staff is also issuing for public
comment a draft regulatory analysis
(ADAMS Accession No. ML22007A009).
The staff developed the regulatory
analysis to assess the value of revising
RG 1.163 as well as alternative courses
of action.
VerDate Sep<11>2014
17:26 Nov 16, 2022
Jkt 259001
III. Backfitting, Forward Fitting, and
Issue Finality
Issuance of DG–1391, if finalized,
would not constitute backfitting as
defined in 10 CFR 50.109, ‘‘Backfitting,’’
and as described in NRC Management
Directive (MD) 8.4, ‘‘Management of
Backfitting, Forward Fitting, Issue
Finality, and Information Requests’’;
would not constitute forward fitting as
that term is defined and described in
MD 8.4; or affect the issue finality of any
approval issued under 10 CFR part 52,
‘‘Licenses, certifications, and approvals
for nuclear power reactors.’’ As
explained in DG–1391, applicants and
licensees would not be required to
comply with the positions set forth in
DG–1391.
IV. Submitting Suggestions for
Improvement of Regulatory Guides
A member of the public may, at any
time, submit suggestions to the NRC for
improvement of existing RGs or for the
development of new RGs. Suggestions
can be submitted on the NRC’s public
website at https://www.nrc.gov/readingrm/doc-collections/reg-guides/
contactus.html. Suggestions will be
considered in future updates and
enhancements to the ‘‘Regulatory
Guide’’ series.
Dated: November 10, 2022.
For the Nuclear Regulatory Commission.
Meraj Rahimi,
Chief, Regulatory Guide and Programs
Management Branch, Division of Engineering,
Office of Nuclear Regulatory Research.
[FR Doc. 2022–24998 Filed 11–16–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 72–0001; NRC–2021–0122]
GE-Hitachi Nuclear Energy Americas,
LLC; Morris Operation Independent
Spent Fuel Storage Installation
Nuclear Regulatory
Commission.
ACTION: Environmental assessment and
finding of no significant impact;
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering a
renewal for twenty years of special
nuclear materials (SNM) License SNM–
2500 for the possession, transfer, and
storage of radioactive material at the
Morris Operation independent spent
fuel storage installation (ISFSI) in
Grundy County, Illinois. The license is
held by GE-Hitachi Nuclear Energy
SUMMARY:
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
69053
Americas, LLC, and, if renewed, would
expire on May 31, 2042.
DATES: The environmental assessment
(EA) and finding of no significant
impact (FONSI) referenced in this
document is available on November 17,
2022.
ADDRESSES: Please refer to Docket ID
NRC–2021–0122 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0122. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. For the
convenience of the reader, instructions
about obtaining materials referenced in
this document are provided in the
‘‘Availability of Documents’’ section.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8:00 a.m. and 4:00 p.m.
Eastern Time (ET), Monday through
Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Christine Pineda, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, telephone:
301–415–6789, email:
Christine.Pineda@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering a renewal of
License SNM–2500, issued to GEHitachi Nuclear Energy Americas, LLC
(GE-Hitachi), for operation of the Morris
Operation ISFSI in Grundy County,
E:\FR\FM\17NON1.SGM
17NON1
69054
Federal Register / Vol. 87, No. 221 / Thursday, November 17, 2022 / Notices
Illinois. Therefore, as required by
section 51.21 of title 10 of the Code of
Federal Regulations (10 CFR), ‘‘Criteria
for and identification of licensing and
regulatory actions requiring
environmental assessments,’’ the NRC
performed an EA. Based on the results
of the EA, the NRC has determined not
to prepare an environmental impact
statement (EIS) for the renewal and is
issuing a FONSI. The NRC is also
conducting a safety evaluation of the
proposed license renewal.
II. Environmental Assessment
Description of and Need for the
Proposed Action
The proposed license renewal would
allow GE-Hitachi to continue operations
at the Morris Operation ISFSI. As
proposed, GE-Hitachi would continue to
store spent fuel in a wet (water) storage
facility consisting of a cask-loading
basin and two spent fuel storage basins.
In accordance with its license, GEHitachi cannot receive additional spent
fuel or replace any spent fuel currently
in inventory at the ISFSI without prior
NRC approval. Continued storage of the
spent fuel and continued operation of
the ISFSI is necessary because Congress
has not yet established a permanent
national repository, and no facility is yet
available for monitored retrievable
storage.
The proposed action is in accordance
with GE-Hitachi’s application dated
June 30, 2020, as supplemented on
February 26, 2021, March 19, 2021,
March 24, 2021, January 27, 2022, and
May 12, 2022.
Environmental Impacts of the Proposed
Action
Approval of the proposed action is
not expected to result in changes to
current ISFSI operations. Routine
operation of the ISFSI is largely passive;
activities include continuation of
existing monitoring and maintenance
activities for the wet storage basins,
which are inside a building. The
proposed action would not result in any
changes in water use or in the types,
characteristics, or quantities of
radiological or nonradiological air
effluents or wastes. GE-Hitachi would
continue to operate onsite sanitary
wastewater lagoons in compliance with
its state-issued permit and would
manage the radioactive wastewater
system and solid radioactive wastes
generated from ISFSI operations in
accordance with NRC regulations. No
wastewater would be discharged from
the property. As a result of these
continued ISFSI activities, no
significant radiological or nonradiological environmental impacts are
expected. Public and occupational dose
estimates associated with the continued
normal operation and maintenance of
the ISFSI would continue to be at levels
that are as low as reasonably achievable
and within the limits of 10 CFR 20.1101
and 20.1201, respectively, as well as 10
CFR 72.104. The NRC staff also
determined that the proposed action
does not have the potential to cause
effects on historic properties, assuming
such historic properties were present.
Accordingly, under 36 CFR 800.3(a)(1),
no consultation is required under
Section 106 of the National Historic
Preservation Act.
Environmental Impacts of the
Alternatives to the Proposed Action
As alternatives to the proposed action,
the staff considered denial of the
proposed action (i.e., the ‘‘no-action’’
alternative) and the shipment of spent
fuel to an offsite facility. Under the noaction alternative, GE-Hitachi would
continue to maintain the spent fuel
under NRC license at the ISFSI.
Ultimately, GE-Hitachi would need to
remove the spent fuel, transport it to
another ISFSI, and decommission the
Morris Operation ISFSI. Until that time,
storage at the ISFSI would continue and
the potential environmental impacts
would be the same as those assessed for
the proposed action. The NRC
determined that shipment of the spent
fuel to a commercial reprocessing
facility, a Federal repository, or an
interim storage facility is not a
reasonable alternative to renewing the
license because these facilities are not
available in the United States as of the
date of the EA.
Agencies and Persons Consulted
The NRC staff consulted with the
Illinois Emergency Management
Agency, the Illinois Department of
Natural Resources, and the Illinois
Environmental Protection Agency
regarding the environmental impact of
the proposed action. These agencies had
no comments on the NRC’s assessment
and conclusions in the EA.
The NRC staff contacted the Illinois
State Historic Preservation Office
(SHPO) to inform it of the proposed
action, and the Illinois SHPO indicated
its review of this project was not
necessary. The NRC staff also notified
16 Federally recognized Indian Tribes of
the proposed action.
III. Finding of No Significant Impact
Based on the EA, the NRC staff has
determined that, pursuant to 10 CFR
51.31, preparation of an EIS is not
required for the proposed action, and
pursuant to 10 CFR 51.32, a FONSI is
appropriate.
IV. Availability of Documents
The documents identified in the
following table are available to
interested persons through one or more
of the following methods, as indicated.
Document description
ADAMS accession No.
lotter on DSK11XQN23PROD with NOTICES1
Environmental Assessment for Proposed License Renewal .........................................................................................
GE-Hitachi’s Renewal Application, dated June 30, 2020 ..............................................................................................
Response to Request for Supplemental Information, dated February 26, 2021 ...........................................................
Response to Request for Clarification, dated March 19, 2021 ......................................................................................
Submittal of Updated Consolidated Safety Analysis Report, dated March 24, 2021 ....................................................
Response to Request for Additional Information, dated January 27, 2022 ...................................................................
Response to Request for Clarification, dated May 12, 2022 .........................................................................................
VerDate Sep<11>2014
17:26 Nov 16, 2022
Jkt 259001
PO 00000
Frm 00059
Fmt 4703
Sfmt 9990
E:\FR\FM\17NON1.SGM
17NON1
ML22270A269.
ML20182A699 (Package).
ML21057A119 (Package).
ML21085A859.
ML21083A200 (Package).
ML22027A516.
ML22132A072.
Federal Register / Vol. 87, No. 221 / Thursday, November 17, 2022 / Notices
Dated: November 10, 2022.
For the Nuclear Regulatory Commission.
Jessie M. Quintero,
Chief, Environmental Review Materials
Branch, Division of Rulemaking,
Environmental, and Financial Support, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2022–24993 Filed 11–16–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2022–0069]
Information Collection: Physical
Protection of Category 1 and Category
2 Quantities of Radioactive Material
Nuclear Regulatory
Commission.
ACTION: Notice of submission to the
Office of Management and Budget;
request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has recently
submitted a request for renewal of an
existing collection of information to the
Office of Management and Budget
(OMB) for review. The information
collection is entitled, ‘‘Physical
Protection of Category 1 and Category 2
Quantities of Radioactive Material.’’
DATES: Submit comments by December
19, 2022. Comments received after this
date will be considered if it is practical
to do so, but the Commission is able to
ensure consideration only for comments
received on or before this date.
ADDRESSES: Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
FOR FURTHER INFORMATION CONTACT:
David C. Cullison, NRC Clearance
Officer, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–2084; email:
Infocollects.Resource@nrc.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
lotter on DSK11XQN23PROD with NOTICES1
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2022–
0069 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
VerDate Sep<11>2014
17:26 Nov 16, 2022
Jkt 259001
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0069.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. A copy of the
collection of information and related
instructions may be obtained without
charge by accessing ADAMS Accession
ML22136A264. The supporting
statement and burden spreadsheet are
available in ADAMS under Accession
No. ML22291A090 and ML22136A213.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8:00 a.m. and 4:00 p.m.
Eastern Time (ET), Monday through
Friday, except Federal holidays.
• NRC’s Clearance Officer: A copy of
the collection of information and related
instructions may be obtained without
charge by contacting the NRC’s
Clearance Officer, David C. Cullison,
Office of the Chief Information Officer,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2084; email:
Infocollects.Resource@nrc.gov.
B. Submitting Comments
Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed in your
comment submission. All comment
submissions are posted at https://
www.regulations.gov and entered into
ADAMS. Comment submissions are not
routinely edited to remove identifying
or contact information.
If you are requesting or aggregating
comments from other persons for
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
69055
submission to the OMB, then you
should inform those persons not to
include identifying or contact
information that they do not want to be
publicly disclosed in their comment
submission. Your request should state
that comment submissions are not
routinely edited to remove such
information before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Background
Under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the NRC recently
submitted a request for renewal of an
existing collection of information to
OMB for review entitled, ‘‘10 CFR Part
37, Physical Protection of Category 1
and Category 2 Quantities of
Radioactive Material.’’ The NRC hereby
informs potential respondents that an
agency may not conduct or sponsor, and
that a person is not required to respond
to, a collection of information unless it
displays a currently valid OMB control
number.
The NRC published a Federal
Register notice with a 60-day comment
period on this information collection on
August 10, 2022, 87 FR 48697.
1. The title of the information
collection: 10 CFR Part 37, ‘‘Physical
Protection of Category 1 and Category 2
Quantities of Radioactive Material’’.
2. OMB approval number: 3150–0214.
3. Type of submission: Extension.
4. The form number, if applicable:
NRC Form 755, ‘‘Advance Notification
to the NRC of Shipments of Category 1
Quantities of Radioactive Material’’.
5. How often the collection is required
or requested: One time for initial
compliance notifications and
fingerprints for the reviewing officials;
and as needed for implementation
notifications, event notifications,
notifications of shipments of radioactive
material, and fingerprinting of new
employees.
6. Who will be required or asked to
respond: Licensees that are authorized
to possess and use category 1 or
category 2 quantities of radioactive
material.
7. The estimated number of annual
responses: 101,479 responses (4,704
Reporting + 1,400 Recordkeeping +
95,375 Third-Party Disclosure).
8. The estimated number of annual
respondents: 5,600 respondents (1,140
Agreement State Licensees + 260 NRC
licensees + 4,200 individuals making
personal history disclosures under
37.23(d)).
9. The estimated number of hours
needed annually to comply with the
information collection requirement or
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 87, Number 221 (Thursday, November 17, 2022)]
[Notices]
[Pages 69053-69055]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-24993]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 72-0001; NRC-2021-0122]
GE-Hitachi Nuclear Energy Americas, LLC; Morris Operation
Independent Spent Fuel Storage Installation
AGENCY: Nuclear Regulatory Commission.
ACTION: Environmental assessment and finding of no significant impact;
issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering a
renewal for twenty years of special nuclear materials (SNM) License
SNM-2500 for the possession, transfer, and storage of radioactive
material at the Morris Operation independent spent fuel storage
installation (ISFSI) in Grundy County, Illinois. The license is held by
GE-Hitachi Nuclear Energy Americas, LLC, and, if renewed, would expire
on May 31, 2042.
DATES: The environmental assessment (EA) and finding of no significant
impact (FONSI) referenced in this document is available on November 17,
2022.
ADDRESSES: Please refer to Docket ID NRC-2021-0122 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0122. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. For the convenience of the reader,
instructions about obtaining materials referenced in this document are
provided in the ``Availability of Documents'' section.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between
8:00 a.m. and 4:00 p.m. Eastern Time (ET), Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Christine Pineda, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, telephone: 301-415-6789, email:
[email protected].
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering a renewal of License SNM-2500, issued to GE-
Hitachi Nuclear Energy Americas, LLC (GE-Hitachi), for operation of the
Morris Operation ISFSI in Grundy County,
[[Page 69054]]
Illinois. Therefore, as required by section 51.21 of title 10 of the
Code of Federal Regulations (10 CFR), ``Criteria for and identification
of licensing and regulatory actions requiring environmental
assessments,'' the NRC performed an EA. Based on the results of the EA,
the NRC has determined not to prepare an environmental impact statement
(EIS) for the renewal and is issuing a FONSI. The NRC is also
conducting a safety evaluation of the proposed license renewal.
II. Environmental Assessment
Description of and Need for the Proposed Action
The proposed license renewal would allow GE-Hitachi to continue
operations at the Morris Operation ISFSI. As proposed, GE-Hitachi would
continue to store spent fuel in a wet (water) storage facility
consisting of a cask-loading basin and two spent fuel storage basins.
In accordance with its license, GE-Hitachi cannot receive additional
spent fuel or replace any spent fuel currently in inventory at the
ISFSI without prior NRC approval. Continued storage of the spent fuel
and continued operation of the ISFSI is necessary because Congress has
not yet established a permanent national repository, and no facility is
yet available for monitored retrievable storage.
The proposed action is in accordance with GE-Hitachi's application
dated June 30, 2020, as supplemented on February 26, 2021, March 19,
2021, March 24, 2021, January 27, 2022, and May 12, 2022.
Environmental Impacts of the Proposed Action
Approval of the proposed action is not expected to result in
changes to current ISFSI operations. Routine operation of the ISFSI is
largely passive; activities include continuation of existing monitoring
and maintenance activities for the wet storage basins, which are inside
a building. The proposed action would not result in any changes in
water use or in the types, characteristics, or quantities of
radiological or nonradiological air effluents or wastes. GE-Hitachi
would continue to operate onsite sanitary wastewater lagoons in
compliance with its state-issued permit and would manage the
radioactive wastewater system and solid radioactive wastes generated
from ISFSI operations in accordance with NRC regulations. No wastewater
would be discharged from the property. As a result of these continued
ISFSI activities, no significant radiological or non-radiological
environmental impacts are expected. Public and occupational dose
estimates associated with the continued normal operation and
maintenance of the ISFSI would continue to be at levels that are as low
as reasonably achievable and within the limits of 10 CFR 20.1101 and
20.1201, respectively, as well as 10 CFR 72.104. The NRC staff also
determined that the proposed action does not have the potential to
cause effects on historic properties, assuming such historic properties
were present. Accordingly, under 36 CFR 800.3(a)(1), no consultation is
required under Section 106 of the National Historic Preservation Act.
Environmental Impacts of the Alternatives to the Proposed Action
As alternatives to the proposed action, the staff considered denial
of the proposed action (i.e., the ``no-action'' alternative) and the
shipment of spent fuel to an offsite facility. Under the no-action
alternative, GE-Hitachi would continue to maintain the spent fuel under
NRC license at the ISFSI. Ultimately, GE-Hitachi would need to remove
the spent fuel, transport it to another ISFSI, and decommission the
Morris Operation ISFSI. Until that time, storage at the ISFSI would
continue and the potential environmental impacts would be the same as
those assessed for the proposed action. The NRC determined that
shipment of the spent fuel to a commercial reprocessing facility, a
Federal repository, or an interim storage facility is not a reasonable
alternative to renewing the license because these facilities are not
available in the United States as of the date of the EA.
Agencies and Persons Consulted
The NRC staff consulted with the Illinois Emergency Management
Agency, the Illinois Department of Natural Resources, and the Illinois
Environmental Protection Agency regarding the environmental impact of
the proposed action. These agencies had no comments on the NRC's
assessment and conclusions in the EA.
The NRC staff contacted the Illinois State Historic Preservation
Office (SHPO) to inform it of the proposed action, and the Illinois
SHPO indicated its review of this project was not necessary. The NRC
staff also notified 16 Federally recognized Indian Tribes of the
proposed action.
III. Finding of No Significant Impact
Based on the EA, the NRC staff has determined that, pursuant to 10
CFR 51.31, preparation of an EIS is not required for the proposed
action, and pursuant to 10 CFR 51.32, a FONSI is appropriate.
IV. Availability of Documents
The documents identified in the following table are available to
interested persons through one or more of the following methods, as
indicated.
----------------------------------------------------------------------------------------------------------------
Document description ADAMS accession No.
----------------------------------------------------------------------------------------------------------------
Environmental Assessment for Proposed License Renewal...... ML22270A269.
GE-Hitachi's Renewal Application, dated June 30, 2020...... ML20182A699 (Package).
Response to Request for Supplemental Information, dated ML21057A119 (Package).
February 26, 2021.
Response to Request for Clarification, dated March 19, 2021 ML21085A859.
Submittal of Updated Consolidated Safety Analysis Report, ML21083A200 (Package).
dated March 24, 2021.
Response to Request for Additional Information, dated ML22027A516.
January 27, 2022.
Response to Request for Clarification, dated May 12, 2022.. ML22132A072.
----------------------------------------------------------------------------------------------------------------
[[Page 69055]]
Dated: November 10, 2022.
For the Nuclear Regulatory Commission.
Jessie M. Quintero,
Chief, Environmental Review Materials Branch, Division of Rulemaking,
Environmental, and Financial Support, Office of Nuclear Material Safety
and Safeguards.
[FR Doc. 2022-24993 Filed 11-16-22; 8:45 am]
BILLING CODE 7590-01-P