Combined Notice of Filings #1, 68686 [2022-24935]
Download as PDF
68686
Federal Register / Vol. 87, No. 220 / Wednesday, November 16, 2022 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1776–004;
ER10–2824–004; ER10–2825–005;
ER10–2957–005; ER10–2995–005;
ER10–2996–004; ER10–2999–004;
ER10–3000–004; ER10–3009–006;
ER10–3013–005; ER10–3029–004;
ER16–1250–014; ER19–2360–003;
ER21–2272–002; ER21–2748–002;
ER21–2847–002; ER22–2173–001;
ER22–2174–001.
Applicants: Daybreak Solar, LLC,
Bakeoven Solar, LLC, Montague Solar,
LLC, Lund Hill Solar, LLC, Bracewell
LLP, Golden Hills Wind Farm, LLC,
Montague Wind Power Facility, LLC,
Avangrid Renewables, LLC, Klondike
Wind Power III LLC, Star Point Wind
Project LLC, Pebble Springs Wind LLC,
Klondike Wind Power II LLC, Klondike
Wind Power LLC, Klamath Energy LLC,
Juniper Canyon Wind Power LLC, Hay
Canyon Wind LLC, Big Horn II Wind
Project LLC, Big Horn Wind Project
LLC, Leaning Juniper Wind Power II
LLC.
Description: Notice of Change in
Status of Leaning Juniper Wind Power
II LLC, et al.
Filed Date: 11/8/22.
Accession Number: 20221108–5166.
Comment Date: 5 p.m. ET 11/29/22.
Docket Numbers: ER22–2643–000.
Applicants: Three Corners Solar, LLC.
Description: Refund Report: Refund
Report to be effective N/A.
Filed Date: 11/9/22.
Accession Number: 20221109–5043.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER22–2914–000;
ER22–2916–000.
Applicants: Mesquite Solar 5, LLC,
Mesquite Solar 4, LLC.
Description: Supplement to
September 22, 2022, Mesquite Solar 4,
LLC, et al., tariff filing.
Filed Date: 11/4/22.
Accession Number: 20221104–5153.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–394–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Termination of AltaGas San Joaquin
Energy GSFA and GIA—Henrietta (TO
SA 46) to be effective 1/9/2023.
Filed Date: 11/9/22.
Accession Number: 20221109–5000.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23–395–000.
VerDate Sep<11>2014
17:27 Nov 15, 2022
Jkt 259001
Applicants: Lightsource Renewable
Energy Development, LLC.
Description: Petition for Limited
Tariff Waiver and Request for Shortened
Comment Period and Expedited
Commission Approval of Lightsource
Renewable Energy Development, LLC.
Filed Date: 11/8/22.
Accession Number: 20221108–5163.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER23–396–000.
Applicants: New England Power
Company.
Description: § 205(d) Rate Filing:
2022–11–09 Filing of Cost
Reimbursement Agreement with Holden
Muni. Light Dept. to be effective 10/10/
2022.
Filed Date: 11/9/22.
Accession Number: 20221109–5051.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23–397–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA and ICSA, SA Nos.
5564 and 5565; Queue No. AA2–161
(amend) to be effective 1/16/2020.
Filed Date: 11/9/22.
Accession Number: 20221109–5059.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23–398–000.
Applicants: Cove Mountain Solar,
LLC.
Description: Tariff Amendment:
Cancellation of Rate Schedule Tariff to
be effective 11/10/2022.
Filed Date: 11/9/22.
Accession Number: 20221109–5070.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23–399–000.
Applicants: Cove Mountain Solar 2,
LLC.
Description: Tariff Amendment:
Cancellation of Rate Schedule Tariff to
be effective 11/10/2022.
Filed Date: 11/9/22.
Accession Number: 20221109–5071.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23–400–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence for PacifiCorp
Transmission Interconnection
Agreement to be effective 1/7/2023.
Filed Date: 11/9/22.
Accession Number: 20221109–5077.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23–401–000.
Applicants: CED Timberland Solar,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization and Request for Waivers
to be effective 1/9/2023.
Filed Date: 11/9/22.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Accession Number: 20221109–5083.
Comment Date: 5 p.m. ET 11/30/22.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES23–6–000.
Applicants: Mountrail-Williams
Electric Cooperative.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Mountrail-Williams Electric
Cooperative.
Filed Date: 11/9/22.
Accession Number: 20221109–5049.
Comment Date: 5 p.m. ET 11/30/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–24935 Filed 11–15–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14981–001]
Lock+TM Hydro Friends Fund XXIX,
LLC; Notice of Surrender of
Preliminary Permit
Take notice that Lock+TM Hydro
Friends Fund XXIX, LLC, permittee for
the proposed Curwensville Dam
Hydropower Project, has requested that
its preliminary permit be terminated.
The permit was issued on January 3,
2020 and would have expired on
December 31, 2023.1 The project would
have been located at the U.S. Army
Corps of Engineers’ (Corps)
1 170
E:\FR\FM\16NON1.SGM
FERC ¶ 62,001 (2020).
16NON1
Agencies
[Federal Register Volume 87, Number 220 (Wednesday, November 16, 2022)]
[Notices]
[Page 68686]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-24935]
[[Page 68686]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1776-004; ER10-2824-004; ER10-2825-005; ER10-
2957-005; ER10-2995-005; ER10-2996-004; ER10-2999-004; ER10-3000-004;
ER10-3009-006; ER10-3013-005; ER10-3029-004; ER16-1250-014; ER19-2360-
003; ER21-2272-002; ER21-2748-002; ER21-2847-002; ER22-2173-001; ER22-
2174-001.
Applicants: Daybreak Solar, LLC, Bakeoven Solar, LLC, Montague
Solar, LLC, Lund Hill Solar, LLC, Bracewell LLP, Golden Hills Wind
Farm, LLC, Montague Wind Power Facility, LLC, Avangrid Renewables, LLC,
Klondike Wind Power III LLC, Star Point Wind Project LLC, Pebble
Springs Wind LLC, Klondike Wind Power II LLC, Klondike Wind Power LLC,
Klamath Energy LLC, Juniper Canyon Wind Power LLC, Hay Canyon Wind LLC,
Big Horn II Wind Project LLC, Big Horn Wind Project LLC, Leaning
Juniper Wind Power II LLC.
Description: Notice of Change in Status of Leaning Juniper Wind
Power II LLC, et al.
Filed Date: 11/8/22.
Accession Number: 20221108-5166.
Comment Date: 5 p.m. ET 11/29/22.
Docket Numbers: ER22-2643-000.
Applicants: Three Corners Solar, LLC.
Description: Refund Report: Refund Report to be effective N/A.
Filed Date: 11/9/22.
Accession Number: 20221109-5043.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER22-2914-000; ER22-2916-000.
Applicants: Mesquite Solar 5, LLC, Mesquite Solar 4, LLC.
Description: Supplement to September 22, 2022, Mesquite Solar 4,
LLC, et al., tariff filing.
Filed Date: 11/4/22.
Accession Number: 20221104-5153.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23-394-000.
Applicants: Pacific Gas and Electric Company.
Description: Tariff Amendment: Termination of AltaGas San Joaquin
Energy GSFA and GIA--Henrietta (TO SA 46) to be effective 1/9/2023.
Filed Date: 11/9/22.
Accession Number: 20221109-5000.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23-395-000.
Applicants: Lightsource Renewable Energy Development, LLC.
Description: Petition for Limited Tariff Waiver and Request for
Shortened Comment Period and Expedited Commission Approval of
Lightsource Renewable Energy Development, LLC.
Filed Date: 11/8/22.
Accession Number: 20221108-5163.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER23-396-000.
Applicants: New England Power Company.
Description: Sec. 205(d) Rate Filing: 2022-11-09 Filing of Cost
Reimbursement Agreement with Holden Muni. Light Dept. to be effective
10/10/2022.
Filed Date: 11/9/22.
Accession Number: 20221109-5051.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23-397-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA and ICSA,
SA Nos. 5564 and 5565; Queue No. AA2-161 (amend) to be effective 1/16/
2020.
Filed Date: 11/9/22.
Accession Number: 20221109-5059.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23-398-000.
Applicants: Cove Mountain Solar, LLC.
Description: Tariff Amendment: Cancellation of Rate Schedule Tariff
to be effective 11/10/2022.
Filed Date: 11/9/22.
Accession Number: 20221109-5070.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23-399-000.
Applicants: Cove Mountain Solar 2, LLC.
Description: Tariff Amendment: Cancellation of Rate Schedule Tariff
to be effective 11/10/2022.
Filed Date: 11/9/22.
Accession Number: 20221109-5071.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23-400-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
for PacifiCorp Transmission Interconnection Agreement to be effective
1/7/2023.
Filed Date: 11/9/22.
Accession Number: 20221109-5077.
Comment Date: 5 p.m. ET 11/30/22.
Docket Numbers: ER23-401-000.
Applicants: CED Timberland Solar, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization and Request for Waivers to be effective 1/9/2023.
Filed Date: 11/9/22.
Accession Number: 20221109-5083.
Comment Date: 5 p.m. ET 11/30/22.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES23-6-000.
Applicants: Mountrail-Williams Electric Cooperative.
Description: Application Under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Mountrail-Williams Electric
Cooperative.
Filed Date: 11/9/22.
Accession Number: 20221109-5049.
Comment Date: 5 p.m. ET 11/30/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-24935 Filed 11-15-22; 8:45 am]
BILLING CODE 6717-01-P