Moretown Hydroelectric LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 68481-68482 [2022-24819]
Download as PDF
Federal Register / Vol. 87, No. 219 / Tuesday, November 15, 2022 / Notices
comments and issuances in this docket
may do so at https://www.ferc.gov.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov and
telephone at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: Gas Pipeline Rates: Refund
Report Requirements.
OMB Control No.: 1902–0084.
Type of Request: Three-year extension
of the FERC–547 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The Commission uses
FERC–547 (Gas Pipeline Rates: Refund
Report Requirements) to implement the
statutory refund provisions governed by
Sections 4 and 16 of the Natural Gas Act
(NGA).1 Section 4 authorizes the
Commission to order a refund (with
interest) for any portion of a natural gas
company’s increased rate or charge
found to be unjust or unreasonable.
Refunds may also be instituted by a
natural gas company as a stipulation to
a Commission-approved settlement
agreement or a provision under the
company’s tariff. Section 16 of the NGA
authorizes the Commission to prescribe
rules and regulations necessary to
administer its refund mandates. The
Commission’s refund reporting
requirements are located in 18 CFR
154.501 (Refund Obligations) and
154.502 (Reports).
The Commission uses the data
collected in FERC–547 to monitor
68481
refunds owed by natural gas companies
to ensure that the flow-through of
refunds owed by these companies are
made as expeditiously as possible and
to assure that refunds are made in
compliance with the Commission’s
regulations.
Type of Respondents: Natural gas
companies.
Estimate of Annual Burden: 2 Refund
obligations occur following a
Commission determination of unjust or
unreasonable rates. Due to the nature of
determinations on an ad hoc basis, the
Commission estimate is based on the
average number of refund obligations.
The Commission estimates the annual
public reporting burden for the
information collection as:
FERC–547—GAS PIPELINE RATES: REFUND REPORT REQUIREMENTS
Number of respondents
Number of
responses per
respondent
Total number
of responses
Average burden
hours &
average cost 3
per response
($)
Total annual
burden hours
& total
annual cost
($)
Cost per
respondent
($)
(1)
(2)
(1) × (2) = (3)
(4)
(3) × (4) = (5)
(5) ÷ (1) = (6)
2 hrs.; $182 ................
88 hrs.; $8,008 ...........
22 ............................................................................................
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: November 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–24816 Filed 11–14–22; 8:45 am]
lotter on DSK11XQN23PROD with NOTICES1
BILLING CODE 6717–01–P
1 15
U.S.C. 717–717w.
is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
2 Burden
VerDate Sep<11>2014
19:16 Nov 14, 2022
Jkt 259001
2
44
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5944–024]
Moretown Hydroelectric LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following license
application has been filed with the
Commission and is available for public
inspection.
a. Type of Application: Subsequent
License.
b. Project No.: P–5944–024.
c. Date filed: November 30, 2020.
d. Applicant: Moretown Hydroelectric
LLC.
e. Name of Project: Moretown No. 8
Hydroelectric Project (Moretown
Project).
f. Location: The existing hydroelectric
project is located on the Mad River in
Washington County, Vermont. The
project does not occupy any federal
land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r)
h. Applicant Contact: Arion
Thiboumery, Moretown Hydroelectric,
explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.
3 FERC staff estimates that industry costs for
salary plus benefits are similar to Commission
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
$364
LLC, 1273 Fowler Rd., Plainfield, VT
05667; (415) 260–6890 or email at
arion@ar-ion.net.
i. FERC Contact: Maryam Zavareh,
(202) 502–8474, maryam.zavareh@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERC.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
costs. The cost figure is the FY2022 FERC average
annual salary plus benefits ($188,992/year or $91/
hour).
E:\FR\FM\15NON1.SGM
15NON1
lotter on DSK11XQN23PROD with NOTICES1
68482
Federal Register / Vol. 87, No. 219 / Tuesday, November 15, 2022 / Notices
page of any filing should include docket
number P–5944–024.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
l. The existing Moretown
Hydroelectric Project consists of: (1) a
407-foot-long, 31-foot-high concrete
gravity dam with a 159-foot-long
overflow spillway and a crest elevation
of 524.26 feet North American Vertical
Datum (NAVD88); (2) a 17.5-acre
impoundment; (3) a 20.3-foot-wide
concrete intake structure with a 12.5foot-wide, 15.1-foot-high trashrack; (4) a
39.4-foot-long, 8.5-foot-diameter steel
penstock; (5) a 39.4-foot-long, 19.7-footwide concrete powerhouse containing a
single 1.2-megawatt turbine-generator
unit; (6) a tailrace; (7) a 105-foot-long,
12.5-kilovolt transmission line; and (8)
appurtenant facilities. The Moretown
Project is operated in a run-of-river
mode with an average annual generation
of 2,094 megawatt-hours.
m. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’, ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’
or ‘‘PRESCRIPTIONS;’’ (2) set forth in
the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
VerDate Sep<11>2014
19:16 Nov 14, 2022
Jkt 259001
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at
https://ferconline.ferc.gov/FERCOnline.
aspx to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
n. The applicant must file no later
than 60 days following the date of
issuance of this notice either: (1)
evidence of the date on which the
certifying agency received the
certification request; (2) a copy of the
water quality certification; or (3)
evidence of waiver of water quality
certification. Please note that the
certification request must comply with
40 CFR 121.5(b), including
documentation that a pre-filing meeting
request was submitted to the certifying
authority at least 30 days prior to
submitting the certification request.
Please also note that the certification
request must be sent to the certifying
authority and to the Commission
concurrently.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Deadline for Filing Comments,
Recommendations, and Agency Terms
and Conditions/Prescriptions
January 2023
Licensee’s Reply to REA Comments
February 2023
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Dated: November 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–24819 Filed 11–14–22; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–AO–2022–0729; FRL–10307–01–
OA]
Proposed Information Collection
Request; Comment Request;
Environmental Education Local Grants
Progress Report Form
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit an
information collection request (ICR),
‘‘Comment Request; Environmental
Education Local Grants Progress Report
SUMMARY:
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Form’’ (EPA ICR No. 2731.01, OMB
Control No. 2090–NEW) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. Before
doing so, EPA is soliciting public
comments on specific aspects of the
proposed information collection as
described below. This is a request for
approval of a new collection. An
Agency may not conduct or sponsor and
a person is not required to respond to
a collection of information unless it
displays a currently valid OMB control
number.
DATES: Comments must be submitted on
or before January 17, 2023.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OA–2022–0729 online using
www.regulations.gov (our preferred
method), by email to OEI.docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC
20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Michael Band, Office of Environmental
Education, (1704A), Environmental
Protection Agency, 1200 Pennsylvania
Ave. NW, Washington, DC 20460;
telephone number: 202–564–3155;
email address: band.michael@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
WJC West, Room 3334, 1301
Constitution Ave. NW, Washington, DC.
The telephone number for the Docket
Center is 202–566–1744. For additional
information about EPA’s public docket,
visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 87, Number 219 (Tuesday, November 15, 2022)]
[Notices]
[Pages 68481-68482]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-24819]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5944-024]
Moretown Hydroelectric LLC; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following license application has been filed
with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: P-5944-024.
c. Date filed: November 30, 2020.
d. Applicant: Moretown Hydroelectric LLC.
e. Name of Project: Moretown No. 8 Hydroelectric Project (Moretown
Project).
f. Location: The existing hydroelectric project is located on the
Mad River in Washington County, Vermont. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r)
h. Applicant Contact: Arion Thiboumery, Moretown Hydroelectric,
LLC, 1273 Fowler Rd., Plainfield, VT 05667; (415) 260-6890 or email at
ion.net">[email protected]ion.net.
i. FERC Contact: Maryam Zavareh, (202) 502-8474,
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://ferconline.ferc.gov/FERC.aspx. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You must include your name and
contact information at the end of your comments. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first
[[Page 68482]]
page of any filing should include docket number P-5944-024.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is ready for
environmental analysis at this time.
l. The existing Moretown Hydroelectric Project consists of: (1) a
407-foot-long, 31-foot-high concrete gravity dam with a 159-foot-long
overflow spillway and a crest elevation of 524.26 feet North American
Vertical Datum (NAVD88); (2) a 17.5-acre impoundment; (3) a 20.3-foot-
wide concrete intake structure with a 12.5-foot-wide, 15.1-foot-high
trashrack; (4) a 39.4-foot-long, 8.5-foot-diameter steel penstock; (5)
a 39.4-foot-long, 19.7-foot-wide concrete powerhouse containing a
single 1.2-megawatt turbine-generator unit; (6) a tailrace; (7) a 105-
foot-long, 12.5-kilovolt transmission line; and (8) appurtenant
facilities. The Moretown Project is operated in a run-of-river mode
with an average annual generation of 2,094 megawatt-hours.
m. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDA-TIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. The applicant must file no later than 60 days following the date
of issuance of this notice either: (1) evidence of the date on which
the certifying agency received the certification request; (2) a copy of
the water quality certification; or (3) evidence of waiver of water
quality certification. Please note that the certification request must
comply with 40 CFR 121.5(b), including documentation that a pre-filing
meeting request was submitted to the certifying authority at least 30
days prior to submitting the certification request. Please also note
that the certification request must be sent to the certifying authority
and to the Commission concurrently.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
Deadline for Filing Comments, Recommendations, and Agency Terms and
Conditions/Prescriptions January 2023
Licensee's Reply to REA Comments February 2023
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
Dated: November 8, 2022.
Kimberly D. Bose,
Secretary.