Combined Notice of Filings, 67682-67683 [2022-24443]

Download as PDF 67682 Federal Register / Vol. 87, No. 216 / Wednesday, November 9, 2022 / Notices Online. This is an easy method for submitting brief, text-only comments on a project; 2. You can file your comments electronically by using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. With filing, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’ as the filing type; or 3. You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP22–466–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 Date and time Location Tuesday, November 29, 2022, 5:00 p.m.–7:00 p.m ................................ Wahpeton City Hall, 1900 4th Street N, Wahpeton, ND 58075, (701) 591–2110. Kindred High School, 225 Dakota Street, Kindred, ND 58051, (701) 428–3177. Wednesday, November 30, 2022, 5:00 p.m.–7:00 p.m ........................... khammond on DSKJM1Z7X2PROD with NOTICES First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. 4. In lieu of sending written or electronic comments, the Commission invites you to attend one of the public comment sessions its staff will conduct in the project area to receive comments on the draft EIS, scheduled as follows: The primary goal of these comment sessions is to have you identify the specific environmental issues and concerns with the draft EIS. Individual verbal comments will be taken on a oneon-one basis with a court reporter. This format is designed to receive the maximum amount of verbal comments, in a convenient way during the timeframe allotted. Each comment session is scheduled from 5:00 p.m. to 7:00 p.m. Central Standard Time. You may arrive at any time after 5:00 p.m. There will not be a formal presentation by Commission staff when the session opens. Comments will be taken until 7:00 p.m. Please see appendix 1 for additional information on the session format and conduct.1 Your verbal comments will be recorded by the court reporter (with FERC staff or representative present) and become part of the public record for this proceeding. Transcripts will be publicly available on FERC’s eLibrary system (see page 2 for instructions on using eLibrary). If a significant number of people are interested in providing verbal comments in the one-on-one settings, a time limit of 5 minutes may be implemented for each commentor. Although there will not be a formal presentation, Commission staff will be available throughout the comment session to answer your questions about the environmental review process. It is important to note that the Commission provides equal consideration to all comments received, whether filed in written form or provided orally at a comment session. 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or call (202) 502– 8371. VerDate Sep<11>2014 17:09 Nov 08, 2022 Jkt 259001 Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR part 385.214). Motions to intervene are more fully described at https://www.ferc.gov/howintervene. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. The Commission grants affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Route Alternative As indicated on page 1, some landowners are receiving this draft EIS because their property has been identified as potentially being affected by the Wild Rice River Route Alternative—MP 55, which is recommended by FERC staff to avoid or lessen environmental impacts along WBI Energy’s proposed pipeline route. Section 3.3.1 of the draft EIS contains our analysis and discussion of this alternative. The Commission staff wants to ensure that all potentially affected landowners have the opportunity to participate in the environmental review process, thus staff is soliciting comments to assist with the environmental analysis of this route alternative, which will be presented in the final EIS. Questions? Additional information about the project is available from the Commission’s Office of External Affairs, PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: November 3, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–24442 Filed 11–8–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings in Existing Proceedings Docket Numbers: RP23–53–001. Applicants: Iroquois Gas Transmission System, L.P. Description: Tariff Amendment: 11.3.22 Negotiated Rate—Shell Energy North America (U.S.), L.P. R–2170–22 to be effective 11/1/2022. Filed Date: 11/3/22. Accession Number: 20221103–5059. Comment Date: 5 p.m. ET 11/10/22. E:\FR\FM\09NON1.SGM 09NON1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 87, No. 216 / Wednesday, November 9, 2022 / Notices Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. DEPARTMENT OF ENERGY Filings Instituting Proceedings Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–256–015; ER17–242–014; ER17–243–014; ER17– 245–014; ER17–652–014. Applicants: Lightstone Marketing LLC, Waterford Power, LLC, Lawrenceburg Power, LLC, Gavin Power, LLC, Darby Power, LLC. Description: Notice of Non-Material Change in Status of Darby Power, LLC, et al. Filed Date: 11/2/22. Accession Number: 20221102–5197. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER22–2818–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment to ISA, SA No. 6594; Queue Nos. AE2–334 & AG1–103 Correction to Filing to be effective 8/9/ 2022. Filed Date: 11/3/22. Accession Number: 20221103–5088. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–360–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original UCSA, Service Agreement No. 6676; Queue Position J799 to be effective 10/5/2022. Filed Date: 11/3/22. Accession Number: 20221103–5034. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–361–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6675; Queue No. AE1–225 to be effective 10/4/2022. Filed Date: 11/3/22. Accession Number: 20221103–5039. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–362–000. Applicants: Avista Corporation. Description: Compliance Filing for Order No. 676–J of Avista Corporation. Filed Date: 11/2/22. Accession Number: 20221102–5194. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER23–363–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised Service Agreement No. 5814, Queue No. AD1–041/AE1–190/AE1–191 to be effective 10/5/2022. Docket Numbers: PR23–5–000. Applicants: Black Hills/Kansas Gas Utility Company, LLC. Description: § 284.123 Rate Filing: BHKG Revised SOC and Statement of Rates to be effective 11/1/2022. Filed Date: 11/3/22. Accession Number: 20221103–5038. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: RP23–163–000. Applicants: Rover Pipeline LLC. Description: § 4(d) Rate Filing: Summary of Negotiated Rate Capacity Release Agreements on 11–2–2022 to be effective 11/2/2022. Filed Date: 11/2/22. Accession Number: 20221102–5097. Comment Date: 5 p.m. ET 11/14/22. Docket Numbers: RP23–164–000. Applicants: Southern Star Central Gas Pipeline, Inc. Description: Compliance filing: Annual Operational Flow Order Report 2022 to be effective N/A. Filed Date: 11/3/22. Accession Number: 20221103–5000. Comment Date: 5 p.m. ET 11/15/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/docs-filing/ efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 3, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–24443 Filed 11–8–22; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:09 Nov 08, 2022 Jkt 259001 Federal Energy Regulatory Commission Combined Notice of Filings #2 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 67683 Filed Date: 11/3/22. Accession Number: 20221103–5040. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–364–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Sch. 12-Appx A: October 2022 RTEP, 30-Day Comment Period Requested to be effective 2/1/2023. Filed Date: 11/3/22. Accession Number: 20221103–5064. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–365–000. Applicants: Calhoun Power Company, LLC. Description: Tariff Amendment: Notice of Cancellation of Market-Based Rate Tariff to be effective 11/4/2022. Filed Date: 11/3/22. Accession Number: 20221103–5078. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–366–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ISA, SA No. 2782; Queue No. W3–002 to be effective 2/2/2011. Filed Date: 11/3/22. Accession Number: 20221103–5083. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–367–000. Applicants: OnPoint Energy Illinois, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application and Request for Expedited Action to be effective 11/4/2022. Filed Date: 11/3/22. Accession Number: 20221103–5093. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–368–000. Applicants: OnPoint Energy Ohio LLC. Description: Baseline eTariff Filing: Market-Based Rate Application and Request for Expedited Action to be effective 11/4/2022. Filed Date: 11/3/22. Accession Number: 20221103–5098. Comment Date: 5 p.m. ET 11/25/22. Docket Numbers: ER23–369–000. Applicants: OnPoint Energy Pennsylvania, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application and Request for Expedited Action to be effective 11/4/2022. Filed Date: 11/3/22. Accession Number: 20221103–5099. Comment Date: 5 p.m. ET 11/25/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings E:\FR\FM\09NON1.SGM 09NON1

Agencies

[Federal Register Volume 87, Number 216 (Wednesday, November 9, 2022)]
[Notices]
[Pages 67682-67683]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-24443]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings in Existing Proceedings

    Docket Numbers: RP23-53-001.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Tariff Amendment: 11.3.22 Negotiated Rate--Shell 
Energy North America (U.S.), L.P. R-2170-22 to be effective 11/1/2022.
    Filed Date: 11/3/22.
    Accession Number: 20221103-5059.
    Comment Date: 5 p.m. ET 11/10/22.


[[Page 67683]]


    Any person desiring to protest in any the above proceedings must 
file in accordance with Rule 211 of the Commission's Regulations (18 
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.

Filings Instituting Proceedings

    Docket Numbers: PR23-5-000.
    Applicants: Black Hills/Kansas Gas Utility Company, LLC.
    Description: Sec.  284.123 Rate Filing: BHKG Revised SOC and 
Statement of Rates to be effective 11/1/2022.
    Filed Date: 11/3/22.
    Accession Number: 20221103-5038.
    Comment Date: 5 p.m. ET 11/25/22.

    Docket Numbers: RP23-163-000.
    Applicants: Rover Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: Summary of Negotiated Rate 
Capacity Release Agreements on 11-2-2022 to be effective 11/2/2022.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5097.
    Comment Date: 5 p.m. ET 11/14/22.

    Docket Numbers: RP23-164-000.
    Applicants: Southern Star Central Gas Pipeline, Inc.
    Description: Compliance filing: Annual Operational Flow Order 
Report 2022 to be effective N/A.
    Filed Date: 11/3/22.
    Accession Number: 20221103-5000.
    Comment Date: 5 p.m. ET 11/15/22.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at:
    https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other 
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.

    Dated: November 3, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-24443 Filed 11-8-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.