Reliability Technical Conference; Third Supplemental Notice of Technical Conference, 67680-67681 [2022-24441]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
67680
Federal Register / Vol. 87, No. 216 / Wednesday, November 9, 2022 / Notices
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Wisconsin Public
Service Corporation, et al.
Filed Date: 11/2/22.
Accession Number: 20221102–5156.
Comment Date: 5 p.m. ET 12/19/22.
Docket Numbers: EC23–22–000.
Applicants: Patriot Hydro, LLC,
Gauley River Power Partners, LLC,
Central Rivers Power Super Holdings
Holdco, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Central Rivers
Power Super Holdings Holdco, LLC, et
al.
Filed Date: 11/2/22.
Accession Number: 20221102–5191.
Comment Date: 5 p.m. ET 11/23/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1852–071;
ER10–1890–024; ER10–1951–048;
ER10–1962–024; ER11–2160–024;
ER11–3417–014; ER11–4462–070;
ER11–4677–023; ER11–4678–024;
ER12–199–021; ER12–631–025; ER12–
676–019; ER12–2444–022; ER13–1991–
025; ER13–1992–025; ER13–2112–019;
ER15–1016–016; ER15–1375–018;
ER15–1418–018; ER15–1883–018;
ER15–2243–014; ER15–2477–017;
ER16–90–017; ER16–91–017; ER16–
632–017; ER16–2443–013; ER17–582–
016; ER17–583–016; ER17–838–045;
ER17–2340–014; ER19–1076–009;
ER20–819–011; ER20–2695–009; ER21–
1580–006; ER21–1813–008; ER21–1814–
008; ER21–2294–006; ER22–1370–005;
ER22–2552–002; ER22–2824–002;
ER21–2304–006.
Applicants: Arlington Solar, LLC,
Yellow Pine Solar, LLC, Java Solar, LLC,
Sunlight Storage, LLC, Arlington Energy
Center II, LLC, Yellow Pine Energy
Center II, LLC, Yellow Pine Energy
Center I, LLC, Sky River Wind, LLC,
Mohave County Wind Farm LLC ,Blythe
Solar III, LLC, Windstar Energy, LLC,
Golden Hills North Wind, LLC, NextEra
Energy Marketing, LLC, Whitney Point
Solar, LLC, Westside Solar, LLC,
NextEra Blythe Solar Energy Center,
LLC, Blythe Solar II, LLC, Blythe Solar
110, LLC, Golden Hills Interconnection,
LLC, Golden Hills Wind, LLC, Silver
State Solar Power South, LLC, Adelanto
Solar, LLC, Adelanto Solar II, LLC,
McCoy Solar, LLC, Shafter Solar, LLC,
Genesis Solar, LLC, Desert Sunlight 300,
LLC, Desert Sunlight 250, LLC, North
Sky River Energy, LLC, Perrin Ranch
Wind, LLC, Windpower Partners 1993,
LLC, Coram California Development,
L.P., Vasco Winds, LLC, NextEra Energy
Montezuma II Wind, LLC, NEPM II,
VerDate Sep<11>2014
17:09 Nov 08, 2022
Jkt 259001
LLC, Alta Wind VIII, LLC, FPL Energy
Montezuma Wind, LLC, High Winds,
LLC, NextEra Energy Services
Massachusetts, LLC, FPL Energy Green
Power Wind, LLC, Florida Power &
Light Company.
Description: Notice of Change in
Status of Florida Power & Light
Company, et al.
Filed Date: 10/31/22.
Accession Number: 20221031–5403.
Comment Date: 5 p.m. ET 11/21/22.
Docket Numbers: ER23–350–000.
Applicants: Morongo Transmission
LLC.
Description: § 205(d) Rate Filing:
Annual TRBAA Filing to be effective 1/
1/2023.
Filed Date: 11/2/22.
Accession Number: 20221102–5122.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–351–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–11–02_SA, 3425 Entergy
Arkansas-West Memphis Solar 1st Rev
GIA (J934) to be effective 10/20/2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5134.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–352–000.
Applicants: Blue Sky West, LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions to be effective 11/3/
2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5146.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–353–000.
Applicants: Evergreen Wind Power II,
LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions to be effective 11/3/
2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5148.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–354–000.
Applicants: Hancock Wind, LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions to be effective 11/3/
2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5149.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–355–000.
Applicants: Mulberry Farm, LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions to be effective 11/3/
2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5152.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–356–000.
Applicants: Selmer Farm, LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions to be effective 11/3/
2022.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Filed Date: 11/2/22.
Accession Number: 20221102–5154.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–357–000.
Applicants: Broad River Energy LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions to be effective 11/3/
2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5159.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–358–000.
Applicants: KMC Thermo, LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions to be effective 11/3/
2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5160.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: ER23–359–000.
Applicants: Townsite Solar, LLC.
Description: Townsite Solar, LLC
submits 2022 WECC Soft Price Cap
Justification Filing.
Filed Date: 10/31/22.
Accession Number: 20221031–5407.
Comment Date: 5 p.m. ET 11/21/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 3, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–24440 Filed 11–8–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD22–10–000]
Reliability Technical Conference; Third
Supplemental Notice of Technical
Conference
As announced in the Notices of
Technical Conference issued in this
E:\FR\FM\09NON1.SGM
09NON1
Federal Register / Vol. 87, No. 216 / Wednesday, November 9, 2022 / Notices
proceeding on August 23, 2022, October
4, 2022, and October 28, 2022, the
Federal Energy Regulatory Commission
(Commission) will convene its annual
Commissioner-led Reliability Technical
Conference in the above-referenced
proceeding on Thursday, November 10,
2022, from approximately 12:00 p.m. to
5:00 p.m. Eastern time. The conference
will be held in-person at the
Commission’s headquarters at 888 First
Street NE, Washington, DC 20426 in the
Commission Meeting Room.
The purpose of this conference is to
discuss policy issues related to the
reliability and security of the BulkPower System.
The conference will be open for the
public to attend, and there is no fee for
attendance. Information about this
technical conference can be found on
the Events Calendar on the
Commission’s website, www.ferc.gov.
The conference will also be transcribed.
Transcripts will be available for a fee
from Ace Reporting, (202) 347–3700.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov,
call toll-free (866) 208–3372 (voice) or
(202) 208–8659 (TTY), or send a fax to
(202) 208–2106 with the required
accommodations.
For more information about this
technical conference, please contact
Lodie White at Lodie.White@ferc.gov or
(202) 502–8453. For information related
to logistics, please contact Sarah
McKinley at Sarah.Mckinley@ferc.gov or
(202) 502–8368.
Dated: November 3, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–24441 Filed 11–8–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
[Docket No. CP22–466–000]
WBI Energy Transmission, Inc.; Notice
of Availability of the Draft
Environmental Impact Statement for
the Proposed Wahpeton Expansion
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Wahpeton Expansion Project,
proposed by WBI Energy Transmission,
Inc. (WBI Energy) in the above-
VerDate Sep<11>2014
17:09 Nov 08, 2022
Jkt 259001
referenced docket. WBI Energy requests
authorization to construct and operate
the Wahpeton Expansion Project, which
would provide an incremental 20,600
equivalent dekatherms per day of firm
natural gas transportation capacity from
WBI Energy’s existing Mapleton
Compressor Station to the proposed
Montana Dakota Utilities (MDU)Kindred and MDU-Wahpeton Border
Stations to provide natural gas services
to the communities of Kindred and
Wahpeton, North Dakota.
The draft EIS assesses the potential
environmental effects of the
construction and operation of the
Wahpeton Expansion Project in
accordance with the requirements of the
National Environmental Policy Act
(NEPA). Commission staff concludes
that approval of the proposed project,
with the mitigation measures
recommended in the EIS, would result
in some adverse environmental impacts.
Most of these impacts would be
temporary and occur during
construction (e.g., impacts on wetlands,
land use, traffic, and noise). With the
exception of climate change impacts
that are not characterized in the EIS as
significant or insignificant, Commission
staff conclude that project effects would
not be significant. As part of the
analysis, Commission staff developed
specific mitigation measures (included
in the draft EIS as recommendations).
Staff recommend that these mitigation
measures be attached as conditions to
any authorization issued by the
Commission.
The Wild Rice River Route
Alternative—Milepost (MP) 55 would
affect landowners that have not been
part of the FERC’s environmental
scoping process, as further discussed on
page 4. Therefore, by this letter we are
notifying these parties of our evaluation
and requesting comments about this
route alternative presented in section
3.3.1 of the draft EIS.
The draft EIS addresses the potential
environmental effects of the
construction and operation of the
following project facilities, in Cass and
Richland Counties, North Dakota:
• a new 60.5-mile-long, 12-inchdiameter natural gas pipeline;
• minor modifications to WBI
Energy’s existing Mapleton Compressor
Station;
• a new MDU-Wahpeton Border
Station;
• a new MDU-Kindred Border
Station;
• seven new block valve settings;
• four new pig launcher/receiver
settings; and
• ancillary facilities.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
67681
The Commission mailed a copy of the
Notice of Availability of the draft EIS to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The draft EIS is only
available in electronic format. It may be
viewed and downloaded from FERC’s
website (www.ferc.gov), on the natural
gas environmental documents page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). In addition,
the draft EIS may be accessed by using
the eLibrary link on FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search), select
‘‘General Search’’ and enter the docket
number in the ‘‘Docket Number’’ field,
excluding the last three digits (i.e.,
CP22–466). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
The draft EIS is not a decision
document. It presents Commission
staff’s independent analysis of the
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding. Any person wishing to
comment on the draft EIS may do so.
Your comments should focus on draft
EIS’s disclosure and discussion of
potential environmental effects,
measures to avoid or lessen
environmental impacts, and the
completeness of the submitted
alternatives, information and analyses.
To ensure consideration of your
comments on the proposal in the final
EIS, it is important that the Commission
receive your comments on or before 5:00
p.m. Eastern Time on December 27,
2022.
For your convenience, there are four
methods you can use to submit your
comments to the Commission. The
Commission will provide equal
consideration to all comments received,
whether filed in written form or
provided verbally. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
1. You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
E:\FR\FM\09NON1.SGM
09NON1
Agencies
[Federal Register Volume 87, Number 216 (Wednesday, November 9, 2022)]
[Notices]
[Pages 67680-67681]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-24441]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD22-10-000]
Reliability Technical Conference; Third Supplemental Notice of
Technical Conference
As announced in the Notices of Technical Conference issued in this
[[Page 67681]]
proceeding on August 23, 2022, October 4, 2022, and October 28, 2022,
the Federal Energy Regulatory Commission (Commission) will convene its
annual Commissioner-led Reliability Technical Conference in the above-
referenced proceeding on Thursday, November 10, 2022, from
approximately 12:00 p.m. to 5:00 p.m. Eastern time. The conference will
be held in-person at the Commission's headquarters at 888 First Street
NE, Washington, DC 20426 in the Commission Meeting Room.
The purpose of this conference is to discuss policy issues related
to the reliability and security of the Bulk-Power System.
The conference will be open for the public to attend, and there is
no fee for attendance. Information about this technical conference can
be found on the Events Calendar on the Commission's website,
www.ferc.gov. The conference will also be transcribed. Transcripts will
be available for a fee from Ace Reporting, (202) 347-3700.
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to [email protected], call toll-free (866) 208-3372
(voice) or (202) 208-8659 (TTY), or send a fax to (202) 208-2106 with
the required accommodations.
For more information about this technical conference, please
contact Lodie White at [email protected] or (202) 502-8453. For
information related to logistics, please contact Sarah McKinley at
[email protected] or (202) 502-8368.
Dated: November 3, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-24441 Filed 11-8-22; 8:45 am]
BILLING CODE 6717-01-P