Download as PDF 67464 Federal Register / Vol. 87, No. 215 / Tuesday, November 8, 2022 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3253–000] Mad River Power Associates; Notice of Authorization for Continued Project Operation The license for the Campton Hydroelectric Project No. 3253 was issued for a period ending October 31, 2022. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 3253 is issued to Mad River Power Associates for a period effective November 1, 2022, through October 31, 2023, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before October 31, 2023, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Mad River Power Associates is authorized to continue operation of the Campton Hydroelectric Project under the terms and conditions of the prior license until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. Dated: November 2, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–24346 Filed 11–7–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Kawailoa Solar, LLC ............................................................................................................................................... Sunflower Energy Center, LLC ............................................................................................................................... Chaparral Springs, LLC .......................................................................................................................................... Appaloosa Run Wind, LLC ..................................................................................................................................... Young Wind, LLC ................................................................................................................................................... Lacy Creek Wind, LLC ........................................................................................................................................... Inertia Wind Project, LLC ....................................................................................................................................... AES Energy Storage, LLC ...................................................................................................................................... MTSun LLC ............................................................................................................................................................. Hunt Energy Network Land Company, L.L.C ......................................................................................................... HEN Infrastructure, L.L.C ....................................................................................................................................... Eight Point Wind, LLC ............................................................................................................................................ Clearwater Energy Resources LLC ........................................................................................................................ Sun Valley Solar LLC ............................................................................................................................................. BT Cunningham Storage, LLC ............................................................................................................................... CPV Three Rivers, LLC .......................................................................................................................................... Take notice that during the month of October 2022, the status of the abovecaptioned entities as Exempt Wholesale Generators Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2021). Dated: November 2, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–24336 Filed 11–7–22; 8:45 am] lotter on DSK11XQN23PROD with NOTICES1 BILLING CODE 6717–01–P VerDate Sep<11>2014 16:56 Nov 07, 2022 Jkt 259001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #3 Take notice that the Commission received the following electric corporate filings: Docket Numbers: ER23–335–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: NorthWestern Corporation submits tariff filing per 35.13(a)(2)(iii: SA 296 6th Rev—NITSA with ExxonMobil Corporation to be effective 1/1/2023. Filed Date: 11/1/22. Accession Number: 20221101–5203. Comment Date: 5 p.m. ET 11/22/22. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 EG22–199–000 EG22–200–000 EG22–201–000 EG22–202–000 EG22–203–000 EG22–204–000 EG22–205–000 EG22–206–000 EG22–207–000 EG22–208–000 EG22–209–000 EG22–210–000 EG22–211–000 EG22–212–000 EG22–213–000 EG22–214–000 Docket Numbers: ER23–336–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: Revised Exhibits to Montana Intertie Agreement to be effective 10/1/2022. Filed Date: 11/1/22. Accession Number: 20221101–5212. Comment Date: 5 p.m. ET 11/22/22. Docket Numbers: ER23–337–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3599R1 Missouri Electric Commission NITSA NOA to be effective 1/1/2023. Filed Date: 11/1/22. Accession Number: 20221101–5214. Comment Date: 5 p.m. ET 11/22/22. Docket Numbers: ER23–338–000. E:\FR\FM\08NON1.SGM 08NON1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 215 / Tuesday, November 8, 2022 / Notices Applicants: Duke Energy Florida, LLC, Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: Duke Energy Florida, LLC submits tariff filing per 35.13(a)(2)(iii: DEF—Revisions to Joint OATT to Provide NFEETS to be effective 12/31/9998. Filed Date: 11/1/22. Accession Number: 20221101–5216. Comment Date: 5 p.m. ET 11/22/22. Docket Numbers: ER23–339–000. Applicants: South Carolina Generating Company, Inc. Description: § 205(d) Rate Filing: Small Rate Increase GENCO to be effective 1/1/2023. Filed Date: 11/1/22. Accession Number: 20221101–5219. Comment Date: 5 p.m. ET 11/22/22. Docket Numbers: ER23–340–000. Applicants: El Paso Electric Company (EPE). Description: El Paso Electric Company submits 2022 WECC Soft Price Cap Justification Filing. Filed Date: 10/28/22. Accession Number: 20221028–5394. Comment Date: 5 p.m. ET 11/18/22. Docket Numbers: ER23–341–000. Applicants: Concurrent LLC. Description: Baseline eTariff Filing: Concurrent LLC submits tariff filing per 35.12: Application for Market-Based Rate Authorization to be effective 11/2/ 2022. Filed Date: 11/1/22. Accession Number: 20221102–5000. Comment Date: 5 p.m. ET 11/22/22. Docket Numbers: ER23–342–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 4029 Panhandle Solar & SPS Facilities Service Agreement to be effective 1/2/ 2023. Filed Date: 11/2/22. Accession Number: 20221102–5004. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER23–343–000. Applicants: Sirrius Energy LLC. Description: Notice of Cancellation of Market Based Rate Tariff of Sirrius Energy LLC. Filed Date: 11/1/22. Accession Number: 20221101–5251. Comment Date: 5 p.m. ET 11/22/22. Docket Numbers: ER23–344–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2022–11–02_SA 3321 METC-Isabella Renewables I & II E&P (J717 J728) to be effective 11/3/2022. Filed Date: 11/2/22. Accession Number: 20221102–5039. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER23–345–000. VerDate Sep<11>2014 16:56 Nov 07, 2022 Jkt 259001 Applicants: Versant Power. Description: § 205(d) Rate Filing: Revised Attachment J Formula Rates for MPD OATT to be effective 6/1/2023. Filed Date: 11/2/22. Accession Number: 20221102–5061. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER23–346–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 1127; Queue No. AD2–113/AD2–114 (amend) to be effective 11/12/2019. Filed Date: 11/2/22. Accession Number: 20221102–5069. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER23–347–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Initial Filing of Rate Schedule No. 349 to be effective 10/3/2022. Filed Date: 11/2/22. Accession Number: 20221102–5091. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER23–348–000. Applicants: New England Power Company. Description: § 205(d) Rate Filing: 2022–11–02 Filing of Revisions to New England Power Company Tariff No. 1 to be effective 1/1/2023. Filed Date: 11/2/22. Accession Number: 20221102–5093. Comment Date: 5 p.m. ET 11/23/22. Docket Numbers: ER23–349–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: Section 205 Filing re: Bad Debt Loss Allocation Calculation Revisions to be effective 1/3/2023. Filed Date: 11/2/22. Accession Number: 20221102–5094. Comment Date: 5 p.m. ET 11/23/22. Take notice that the Commission received the following electric reliability filings. Docket Numbers: RD23–1–000. Applicants: North American Electric Reliability Corporation. Description: North American Electric Reliability Corporation submits Petition for Approval of Proposed Reliability Standards EOP–011–3 and EOP–012–1 and Request for Expedited Action. Filed Date: 10/28/22. Accession Number: 20221028–5393. Comment Date: 5 p.m. ET 12/1/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 67465 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 2, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–24332 Filed 11–7–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–17–000. Applicants: RWE Aktiengesellschaft, Consolidated Edison, Inc., RWE Renewables Americas, LLC, Con Edison Clean Energy Businesses, Inc., Alpaugh 50, LLC, Battle Mountain SP, LLC, Broken Bow Wind II, LLC, Campbell County Wind Farm, LLC, CED Timberland Solar, LLC, CED White River Solar 2, LLC, CED Wistaria Solar, LLC, Consolidated Edison Energy, Inc., Consolidated Edison Solutions, Inc., Copper Mountain Solar 1, LLC, Copper Mountain Solar 2, LLC, Copper Mountain Solar 3, LLC, Copper Mountain Solar 4, LLC, Copper Mountain Solar 5, LLC, Great Valley Solar 1, LLC, Great Valley Solar 2, LLC, Great Valley Solar 3, LLC, Mesquite Solar 1, LLC, Mesquite Solar 2, LLC, Mesquite Solar 3, LLC, Mesquite Solar 4, LLC, Mesquite Solar 5, LLC, Panoche Valley Solar, LLC, Pleasant Hill Solar, LLC, SEP II, LLC, Water Strider Solar LLC, Watlington Solar, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of RWE Aktiengesellschaft. Filed Date: 10/28/22. Accession Number: 20221028–5314. Comment Date: 5 p.m. ET 11/18/22. Take notice that the Commission received the following electric rate filings: E:\FR\FM\08NON1.SGM 08NON1

Agencies

[Federal Register Volume 87, Number 215 (Tuesday, November 8, 2022)]
[Notices]
[Pages 67464-67465]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-24332]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #3

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: ER23-335-000.
    Applicants: NorthWestern Corporation.
    Description: Sec.  205(d) Rate Filing: NorthWestern Corporation 
submits tariff filing per 35.13(a)(2)(iii: SA 296 6th Rev--NITSA with 
ExxonMobil Corporation to be effective 1/1/2023.
    Filed Date: 11/1/22.
    Accession Number: 20221101-5203.
    Comment Date: 5 p.m. ET 11/22/22.

    Docket Numbers: ER23-336-000.
    Applicants: NorthWestern Corporation.
    Description: Sec.  205(d) Rate Filing: Revised Exhibits to Montana 
Intertie Agreement to be effective 10/1/2022.
    Filed Date: 11/1/22.
    Accession Number: 20221101-5212.
    Comment Date: 5 p.m. ET 11/22/22.

    Docket Numbers: ER23-337-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3599R1 Missouri Electric 
Commission NITSA NOA to be effective 1/1/2023.
    Filed Date: 11/1/22.
    Accession Number: 20221101-5214.
    Comment Date: 5 p.m. ET 11/22/22.

    Docket Numbers: ER23-338-000.

[[Page 67465]]

    Applicants: Duke Energy Florida, LLC, Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: Duke Energy Florida, LLC 
submits tariff filing per 35.13(a)(2)(iii: DEF--Revisions to Joint OATT 
to Provide NFEETS to be effective 12/31/9998.
    Filed Date: 11/1/22.
    Accession Number: 20221101-5216.
    Comment Date: 5 p.m. ET 11/22/22.

    Docket Numbers: ER23-339-000.
    Applicants: South Carolina Generating Company, Inc.
    Description: Sec.  205(d) Rate Filing: Small Rate Increase GENCO to 
be effective 1/1/2023.
    Filed Date: 11/1/22.
    Accession Number: 20221101-5219.
    Comment Date: 5 p.m. ET 11/22/22.

    Docket Numbers: ER23-340-000.
    Applicants: El Paso Electric Company (EPE).
    Description: El Paso Electric Company submits 2022 WECC Soft Price 
Cap Justification Filing.
    Filed Date: 10/28/22.
    Accession Number: 20221028-5394.
    Comment Date: 5 p.m. ET 11/18/22.

    Docket Numbers: ER23-341-000.
    Applicants: Concurrent LLC.
    Description: Baseline eTariff Filing: Concurrent LLC submits tariff 
filing per 35.12: Application for Market-Based Rate Authorization to be 
effective 11/2/2022.
    Filed Date: 11/1/22.
    Accession Number: 20221102-5000.
    Comment Date: 5 p.m. ET 11/22/22.

    Docket Numbers: ER23-342-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 4029 Panhandle Solar & SPS 
Facilities Service Agreement to be effective 1/2/2023.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5004.
    Comment Date: 5 p.m. ET 11/23/22.

    Docket Numbers: ER23-343-000.
    Applicants: Sirrius Energy LLC.
    Description: Notice of Cancellation of Market Based Rate Tariff of 
Sirrius Energy LLC.
    Filed Date: 11/1/22.
    Accession Number: 20221101-5251.
    Comment Date: 5 p.m. ET 11/22/22.

    Docket Numbers: ER23-344-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2022-11-02_SA 3321 METC-
Isabella Renewables I & II E&P (J717 J728) to be effective 11/3/2022.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5039.
    Comment Date: 5 p.m. ET 11/23/22.

    Docket Numbers: ER23-345-000.
    Applicants: Versant Power.
    Description: Sec.  205(d) Rate Filing: Revised Attachment J Formula 
Rates for MPD OATT to be effective 6/1/2023.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5061.
    Comment Date: 5 p.m. ET 11/23/22.

    Docket Numbers: ER23-346-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, SA No. 
1127; Queue No. AD2-113/AD2-114 (amend) to be effective 11/12/2019.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5069.
    Comment Date: 5 p.m. ET 11/23/22.

    Docket Numbers: ER23-347-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Initial Filing of Rate 
Schedule No. 349 to be effective 10/3/2022.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5091.
    Comment Date: 5 p.m. ET 11/23/22.

    Docket Numbers: ER23-348-000.
    Applicants: New England Power Company.
    Description: Sec.  205(d) Rate Filing: 2022-11-02 Filing of 
Revisions to New England Power Company Tariff No. 1 to be effective 1/
1/2023.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5093.
    Comment Date: 5 p.m. ET 11/23/22.

    Docket Numbers: ER23-349-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: Section 205 Filing re: Bad 
Debt Loss Allocation Calculation Revisions to be effective 1/3/2023.
    Filed Date: 11/2/22.
    Accession Number: 20221102-5094.
    Comment Date: 5 p.m. ET 11/23/22.

    Take notice that the Commission received the following electric 
reliability filings.

    Docket Numbers: RD23-1-000.
    Applicants: North American Electric Reliability Corporation.
    Description: North American Electric Reliability Corporation 
submits Petition for Approval of Proposed Reliability Standards EOP-
011-3 and EOP-012-1 and Request for Expedited Action.
    Filed Date: 10/28/22.
    Accession Number: 20221028-5393.
    Comment Date: 5 p.m. ET 12/1/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: November 2, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-24332 Filed 11-7-22; 8:45 am]
BILLING CODE 6717-01-P