Eagle Creek Racine Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, 67473-67474 [2022-24275]
Download as PDF
Federal Register / Vol. 87, No. 215 / Tuesday, November 8, 2022 / Notices
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
This notice is being sent to the
Commission’s current environmental
mailing list for the Project. Public
sessions or site visits will be posted on
the Commission’s calendar located at
https://www.ferc.gov/news-events/
events along with other related
information. Additional information
about the project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link.
Dated: November 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–24278 Filed 11–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2570–034]
lotter on DSK11XQN23PROD with NOTICES1
Eagle Creek Racine Hydro, LLC; Notice
of Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2570–034.
c. Date filed: November 30, 2021.
d. Applicant: Eagle Creek Racine
Hydro, LLC (Eagle Creek).
e. Name of Project: Racine
Hydroelectric Project (Racine Project).
f. Location: The Racine Project is
located at the U.S. Army Corps of
Engineers’ (Corps) Racine Locks and
Dam on the Ohio River near the Town
of Racine in Meigs County, Ohio. The
project occupies 27.99 acres of federal
land administered by the Corps.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Joyce Foster,
Director, Licensing and Compliance;
joyce.foster@eaglecreekre.com or (804)
338–5110.
VerDate Sep<11>2014
16:56 Nov 07, 2022
Jkt 259001
i. FERC Contact: Jay Summers at
jay.summers@ferc.gov or (202) 502–
8764.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper request. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–2570–
034.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
The Council on Environmental
Quality (CEQ) issued a final rule on
April 20, 2022, revising the regulations
under 40 CFR parts 1502, 1507, and
1508 that federal agencies use to
implement the National Environmental
Policy Act (NEPA) (see National
Environmental Policy Act Implementing
Regulations Revisions, 87 FR 23,453–
70). The final rule became effective on
May 20, 2022. Commission staff intends
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
67473
to conduct its NEPA review in
accordance with CEQ’s new regulations.
l. The Racine Project would use the
Corps’ existing Racine Locks and Dam
and consist of the following existing
facilities: (1) four 21.75-foot-wide by 60foot-high intake openings equipped
with steel trashracks having a clear bar
spacing of 5.5 inches; (2) a reinforced
concrete powerhouse located on the east
end of the dam containing two
horizontal bulb generating units with a
combined capacity of 47.5 megawatts;
(3) a 155-foot-long, non-overflow section
of sheet pile cells located between the
powerhouse and the right abutment; (4)
a stand-alone functional replacement
dam located upstream of the sheet pile
cells that consists of a drilled shaft
supported concrete dam with a drilled
secant pile seepage control; (5) a 834foot-long, 69-kilovolt transmission line;
and (6) appurtenant facilities.
The Racine Project is currently
operated in a run-of-release mode using
surplus water from the Corps’ Racine
Locks and Dam, as directed by the
Corps, and has an estimated average
annual energy production of 90,364
megawatt-hours. Eagle Creek does not
propose any new construction and
proposes to continue operating the
project in a run-of-release mode.
m. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnllineSupport@ferc or call tollfree, (886) 208–3676 or TTY, (202) 502–
8659.
You may also register online at https://
www.ferc.gov/docs-filing/esubscription.
asp to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
E:\FR\FM\08NON1.SGM
08NON1
67474
Federal Register / Vol. 87, No. 215 / Tuesday, November 8, 2022 / Notices
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. The license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) a copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification. Please note that the
certification request must comply with
40 CFR 121.5(b), including
documentation that a pre-filing meeting
request was submitted to the certifying
authority at least 30 days prior to
submitting the certification request.
Please note that the certification request
must be sent to the certifying authority
and to the Commission concurrently.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for Filing Protest, Motion to Intervene, Comments, Recommendations, Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions.
Deadline for Filing Reply Comments ............................................................................................................................................
Dated: November 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–24275 Filed 11–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–327–000]
lotter on DSK11XQN23PROD with NOTICES1
Arroyo Energy Storage LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Arroyo
Energy Storage LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
VerDate Sep<11>2014
16:56 Nov 07, 2022
Jkt 259001
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November
22, 2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
December 2022.
February 2023.
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: November 2, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–24329 Filed 11–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23–4–000.
Applicants: Hope Gas, Inc.
Description: § 284.123(g) Rate Filing:
HGI—2022 PREP Filing to be effective
11/1/2022.
Filed Date: 11/2/22.
Accession Number: 20221102–5055.
Comment Date: 5 p.m. ET 11/23/22.
Docket Numbers: RP23–142–000.
Applicants: Algonquin Gas
Transmission, LLC.
E:\FR\FM\08NON1.SGM
08NON1
Agencies
[Federal Register Volume 87, Number 215 (Tuesday, November 8, 2022)]
[Notices]
[Pages 67473-67474]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-24275]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2570-034]
Eagle Creek Racine Hydro, LLC; Notice of Application Accepted for
Filing, Soliciting Motions To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting Comments, Recommendations,
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2570-034.
c. Date filed: November 30, 2021.
d. Applicant: Eagle Creek Racine Hydro, LLC (Eagle Creek).
e. Name of Project: Racine Hydroelectric Project (Racine Project).
f. Location: The Racine Project is located at the U.S. Army Corps
of Engineers' (Corps) Racine Locks and Dam on the Ohio River near the
Town of Racine in Meigs County, Ohio. The project occupies 27.99 acres
of federal land administered by the Corps.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Joyce Foster, Director, Licensing and
Compliance; [email protected] or (804) 338-5110.
i. FERC Contact: Jay Summers at [email protected] or (202) 502-
8764.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, preliminary
terms and conditions, and preliminary fishway prescriptions using the
Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper
request. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first page of any filing should include
docket number P-2570-034.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
The Council on Environmental Quality (CEQ) issued a final rule on
April 20, 2022, revising the regulations under 40 CFR parts 1502, 1507,
and 1508 that federal agencies use to implement the National
Environmental Policy Act (NEPA) (see National Environmental Policy Act
Implementing Regulations Revisions, 87 FR 23,453-70). The final rule
became effective on May 20, 2022. Commission staff intends to conduct
its NEPA review in accordance with CEQ's new regulations.
l. The Racine Project would use the Corps' existing Racine Locks
and Dam and consist of the following existing facilities: (1) four
21.75-foot-wide by 60-foot-high intake openings equipped with steel
trashracks having a clear bar spacing of 5.5 inches; (2) a reinforced
concrete powerhouse located on the east end of the dam containing two
horizontal bulb generating units with a combined capacity of 47.5
megawatts; (3) a 155-foot-long, non-overflow section of sheet pile
cells located between the powerhouse and the right abutment; (4) a
stand-alone functional replacement dam located upstream of the sheet
pile cells that consists of a drilled shaft supported concrete dam with
a drilled secant pile seepage control; (5) a 834-foot-long, 69-kilovolt
transmission line; and (6) appurtenant facilities.
The Racine Project is currently operated in a run-of-release mode
using surplus water from the Corps' Racine Locks and Dam, as directed
by the Corps, and has an estimated average annual energy production of
90,364 megawatt-hours. Eagle Creek does not propose any new
construction and proposes to continue operating the project in a run-
of-release mode.
m. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
2020. For assistance, contact FERC at [email protected] or call
toll-free, (886) 208-3676 or TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received
[[Page 67474]]
on or before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
o. The license applicant must file no later than 60 days following
the date of issuance of this notice: (1) a copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification. Please note
that the certification request must comply with 40 CFR 121.5(b),
including documentation that a pre-filing meeting request was submitted
to the certifying authority at least 30 days prior to submitting the
certification request. Please note that the certification request must
be sent to the certifying authority and to the Commission concurrently.
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
q. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for Filing Protest, Motion to December 2022.
Intervene, Comments, Recommendations,
Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions.
Deadline for Filing Reply Comments.......... February 2023.
------------------------------------------------------------------------
Dated: November 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-24275 Filed 11-7-22; 8:45 am]
BILLING CODE 6717-01-P