Let It Go, LLC; Notice of Intent To Prepare an Environmental Assessment, 66291 [2022-23952]
Download as PDF
66291
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 212 / Thursday, November 3, 2022 / Notices
Description: Compliance filing:
Evergy Metro, Inc. submits tariff filing
per 35: Evergy Metro, Inc.—Order No.
864 Amended Compliance Filing to be
effective 1/27/2020.
Filed Date: 10/28/22.
Accession Number: 20221028–5100.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER20–2042–004.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Evergy Missouri West, Inc. submits tariff
filing per 35: Evergy Missouri West—
Order No. 864 Amended Compliance
Filing to be effective 1/27/2020.
Filed Date: 10/28/22.
Accession Number: 20221028–5099.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER20–2044–005.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Evergy Kansas Central, Inc. submits
tariff filing per 35: Evergy Kansas
Central—Order No. 864 Amended
Compliance Filing to be effective 1/27/
2020.
Filed Date: 10/28/22.
Accession Number: 20221028–5162.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER20–686–009.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Compliance filing:
Compliance Filing to be effective 11/1/
2022.
Filed Date: 10/28/22.
Accession Number: 20221028–5180.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER21–1225–004;
ER22–867–001.
Applicants: Long Ridge Retail Electric
Supplier LLC, Long Ridge Energy
Generation LLC.
Description: Notice of Non-Material
Change in Status of Long Ridge Energy
Generation LLC, et al.
Filed Date: 10/28/22.
Accession Number: 20221028–5298.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER21–2137–006.
Applicants: IR Energy Management
LLC.
Description: Notice of Change in
Status of IR Energy Management LLC.
Filed Date: 10/28/22.
Accession Number: 20221028–5197.
Comment Date: 5 p.m. ET 11/18/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
VerDate Sep<11>2014
16:41 Nov 02, 2022
Jkt 259001
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 28, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues EA ............
Comments on EA .....................
Target date
April 2023.2
May 2023
Any questions regarding this notice
may be directed to Andy Bernick at
(202) 502–8660 or andrew.bernick@
ferc.gov.
Dated: October 28, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–23952 Filed 11–2–22; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2022–23938 Filed 11–2–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings #3
[Project No. 15038–001]
Let It Go, LLC; Notice of Intent To
Prepare an Environmental Assessment
On December 9, 2021, as
supplemented,1 Let It Go, LLC filed an
application for an exemption from
licensing for the proposed 20-kilowatt
Jefferson Mill Hydroelectric Project
(Jefferson Mill Project) (FERC No.
15038). The Jefferson Mill Project would
be located on the Hardware River near
the Town of Scottsville, Albemarle
County, Virginia. The project would not
occupy federal land.
In accordance with the Commission’s
regulations, on July 21, 2022,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
information in the record, including
comments filed on the REA notice, staff
does not anticipate that exempting the
project from licensing would constitute
a major federal action significantly
affecting the quality of the human
environment. Therefore, staff intends to
prepare an Environmental Assessment
(EA) on the application to exempt the
Jefferson Mill Project from licensing.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s decision on whether to
issue an exemption from licensing for
the project.
1 The final exemption application filed December
9, 2021 was supplemented on December 15, 2021,
December 28, 2021, and March 9, 2022.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–245–000.
Applicants: Frenchtown I Solar, LLC.
Description: Compliance filing:
Reactive power informational filing to
be effective N/A.
Filed Date: 10/28/22.
Accession Number: 20221028–5158.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER23–246–000.
Applicants: Happy Jack Windpower,
LLC.
Description: § 205(d) Rate Filing:
Notice of Non-Material Change of Status
& Tariff Amendment Filing (Happy Jack)
to be effective 12/28/2022.
Filed Date: 10/28/22.
Accession Number: 20221028–5159.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER23–247–000.
Applicants: Frenchtown II Solar, LLC.
Description: Compliance filing:
Reactive power informational filing to
be effective N/A.
Filed Date: 10/28/22.
Accession Number: 20221028–5161.
Comment Date: 5 p.m. ET 11/18/22.
Docket Numbers: ER23–248–000.
Applicants: Frenchtown III Solar,
LLC.
2 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare an EA for the Jefferson Mill Project.
Therefore, in accordance with CEQ’s regulations,
the EA must be issued within 1 year of the issuance
date of this notice.
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 87, Number 212 (Thursday, November 3, 2022)]
[Notices]
[Page 66291]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23952]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15038-001]
Let It Go, LLC; Notice of Intent To Prepare an Environmental
Assessment
On December 9, 2021, as supplemented,\1\ Let It Go, LLC filed an
application for an exemption from licensing for the proposed 20-
kilowatt Jefferson Mill Hydroelectric Project (Jefferson Mill Project)
(FERC No. 15038). The Jefferson Mill Project would be located on the
Hardware River near the Town of Scottsville, Albemarle County,
Virginia. The project would not occupy federal land.
---------------------------------------------------------------------------
\1\ The final exemption application filed December 9, 2021 was
supplemented on December 15, 2021, December 28, 2021, and March 9,
2022.
---------------------------------------------------------------------------
In accordance with the Commission's regulations, on July 21, 2022,
Commission staff issued a notice that the project was ready for
environmental analysis (REA notice). Based on the information in the
record, including comments filed on the REA notice, staff does not
anticipate that exempting the project from licensing would constitute a
major federal action significantly affecting the quality of the human
environment. Therefore, staff intends to prepare an Environmental
Assessment (EA) on the application to exempt the Jefferson Mill Project
from licensing.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's decision on whether to issue an
exemption from licensing for the project.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
---------------------------------------------------------------------------
\2\ The Council on Environmental Quality's (CEQ) regulations
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1
year of the federal action agency's decision to prepare an EA. This
notice establishes the Commission's intent to prepare an EA for the
Jefferson Mill Project. Therefore, in accordance with CEQ's
regulations, the EA must be issued within 1 year of the issuance
date of this notice.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues EA................... April 2023.\2\
Comments on EA......................... May 2023
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Andy Bernick
at (202) 502-8660 or [email protected].
Dated: October 28, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-23952 Filed 11-2-22; 8:45 am]
BILLING CODE 6717-01-P