Surface Transportation Project Delivery Program; Utah Department of Transportation Audit Report, 66348-66352 [2022-23914]
Download as PDF
66348
Federal Register / Vol. 87, No. 212 / Thursday, November 3, 2022 / Notices
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
[Docket No. FRA–2022–0620]
Agency Information Collection
Activities: Requests for Comments;
Clearance of a Renewed Approval of
Information Collection: Pilot
Certification and Qualification
Requirements for Air Carrier
Operations
Federal Aviation
Administration (FAA), DOT.
ACTION: Notice and request for
comments.
AGENCY:
In accordance with the
Paperwork Reduction Act of 1995, FAA
invites public comments about our
intention to request the Office of
Management and Budget (OMB)
approval to renew an information
collection. The Federal Register Notice
with a 60-day comment period soliciting
comments on the following collection of
information was published on May 10,
2022. The collection involves FAA
review of Airline Transport Pilot (ATP)
Certification Training Program (CTP)
submittals to determine that the
program complies with the applicable
requirements. It also involves FAA
review of an institution of higher
education’s application for the authority
to certify its graduates meet the
minimum regulatory requirements.
DATES: Written comments should be
submitted by December 5, 2022.
ADDRESSES: Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain. Find this particular
information collection by selecting
‘‘Currently under 30-day Review—Open
for Public Comments’’ or by using the
search function.
FOR FURTHER INFORMATION CONTACT:
Sandra L. Ray by email at: Sandra.ray@
faa.gov; phone: 412–329–3088.
SUPPLEMENTARY INFORMATION:
Public Comments Invited: You are
asked to comment on any aspect of this
information collection, including (a)
Whether the proposed collection of
information is necessary for FAA’s
performance; (b) the accuracy of the
estimated burden; (c) ways for FAA to
enhance the quality, utility and clarity
of the information collection; and (d)
ways that the burden could be
minimized without reducing the quality
of the collected information.
OMB Control Number: 2120–0755.
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
16:41 Nov 02, 2022
Jkt 259001
Title: Pilot Certification and
Qualification Requirements for Air
Carrier Operations.
Form Numbers: None.
Type of Review: Renewal of an
information collection.
Background: The Federal Register
Notice with a 60-day comment period
soliciting comments on the following
collection of information was published
on May 10, 2022 (87 FR 28098). FAA
aviation safety inspectors review the
Airline Transport Pilot (ATP)
Certification Training Program (CTP)
submittals to determine that the
program complies with the applicable
requirements of 14 CFR 61.156. The
programs that comply with the
minimum requirements receive
approval to begin offering the course to
applicants for an ATP certificate with a
multiengine class rating or an ATP
certificate obtained concurrently with
an airplane type rating. FAA aviation
inspectors also review an institution of
higher education’s application for the
authority to certify its graduates meet
the minimum requirements of 14 CFR
61.160. The institutions of higher
education that receive a letter of
authorization for their degree program(s)
are authorized to place a certifying
statement on a graduates’ transcript
indicating he or she is eligible for a
restricted privileges ATP certificate.
Respondents: Varies per requirement.
Frequency: Varies per requirement.
Estimated Average Burden per
Response: Varies per requirement.
Estimated Total Annual Burden:
1,301 Hours.
Issued in Washington, DC, on October 31,
2022.
Sandra L. Ray,
Aviation Safety Inspector, AFS–200.
[FR Doc. 2022–23907 Filed 11–2–22; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[FHWA Docket No. FHWA–2020–0012]
Surface Transportation Project
Delivery Program; Utah Department of
Transportation Audit Report
Federal Highway
Administration (FHWA), Department of
Transportation (DOT).
ACTION: Notice.
AGENCY:
The Moving Ahead for
Progress in the 21st Century Act (MAP–
21) established the Surface
Transportation Project Delivery Program
that allows a State to assume FHWA’s
responsibilities for environmental
SUMMARY:
PO 00000
Frm 00092
Fmt 4703
Sfmt 4703
review, consultation, and compliance
under the National Environmental
Policy Act (NEPA) for Federal highway
projects. When a State assumes these
Federal responsibilities, the State
becomes solely responsible and liable
for carrying out the responsibilities it
has assumed in lieu of FHWA. This
program mandates annual audits during
each of the first 4 years of State
participation to ensure compliance with
program requirements. This notice
finalizes the findings of the third audit
report for the Utah Department of
Transportation (UDOT).
FOR FURTHER INFORMATION CONTACT: Mr.
David Cohen, Office of Project
Development and Environmental
Review, (202) 366–8531, David.Cohen@
dot.gov, or Mr. Patrick Smith, Office of
the Chief Counsel, (202) 366–1345,
Patrick.C.Smith@dot.gov, Federal
Highway Administration, U.S.
Department of Transportation, 1200
New Jersey Avenue SE, Washington, DC
20590. Office hours are from 8:00 a.m.
to 4:30 p.m., e.t., Monday through
Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this notice may
be downloaded from the specific docket
page at www.regulations.gov.
Background
The Surface Transportation Project
Delivery Program, codified at 23 United
States Code (U.S.C.). 327, commonly
known as the NEPA Assignment
Program, allows a State to assume
FHWA’s environmental responsibilities
for review, consultation, and
compliance for Federal highway
projects. When a State assumes these
Federal responsibilities, the State
becomes solely liable for carrying out
the responsibilities in lieu of the FHWA.
The UDOT published its application for
NEPA assumption on October 9, 2015,
and made it available for public
comment for 30 days. After considering
public comments, UDOT submitted its
application to FHWA on December 1,
2015. The application served as the
basis for developing a Memorandum of
Understanding (MOU) that identifies the
responsibilities and obligations that
UDOT would assume. The FHWA
published a notice of the draft MOU in
the Federal Register on November 16,
2016, with a 30-day comment period to
solicit the views of the public and
Federal agencies. After the end of the
comment period, FHWA and UDOT
considered comments and proceeded to
execute the MOU. Effective January 17,
2017, UDOT assumed FHWA’s
E:\FR\FM\03NON1.SGM
03NON1
Federal Register / Vol. 87, No. 212 / Thursday, November 3, 2022 / Notices
responsibilities under NEPA, and the
responsibilities for other Federal
environmental laws described in the
MOU.
Section 327(g) of Title 23, U.S.C.,
requires the Secretary to conduct annual
audits during each of the first 4 years of
State participation. After the fourth
year, the Secretary shall monitor the
State’s compliance with the written
agreement. The results of each audit
must be made available for public
comment. This notice finalizes the
findings of the third audit report for
UDOT participation in the NEPA
Assignment program. The FHWA
published a draft version of this report
in the Federal Register on September
17, 2020, and made it available for
public review and comment for 30 days
in accordance with 23 U.S.C. 327(g).
The FHWA received one response to the
Federal Register notice during the
public comment period for the draft
report. The only response, from the
American Road and Transportation
Builders Association, outlined their
general support for the NEPA
Assignment program to accelerate
Federal-aid highway program and
project delivery. The FHWA determined
that the comment required no changes
to the draft report. This notice finalizes
the third NEPA Assignment audit report
in Utah.
Authority: Section 1313 of Public Law
112–141; Section 6005 of Public Law
109–59; 23 U.S.C. 327; 23 CFR 773.
Stephanie Pollack,
Acting Administrator, Federal Highway
Administration.
Surface Transportation Project Delivery
Program
FHWA Audit of the Utah Department of
Transportation—Final Report
lotter on DSK11XQN23PROD with NOTICES1
July 1, 2018–June 30, 2019
Executive Summary
This report summarizes the results of
the Federal Highway Administration’s
(FHWA) third audit of the Utah
Department of Transportation’s (UDOT)
National Environmental Policy Act
(NEPA) review responsibilities and
obligations that FHWA assigned and
UDOT assumed pursuant to 23 United
States Code (U.S.C.) 327. Throughout
this report, FHWA uses the term ‘‘NEPA
Assignment Program’’ to refer to the
program codified at 23 U.S.C. 327.
Pursuant to 23 U.S.C. 327, UDOT and
FHWA executed a memorandum of
understanding (MOU) on January 17,
2017, to memorialize UDOT’s NEPA
responsibilities and liabilities for
Federal-aid highway projects and
certain other FHWA approvals in Utah.
VerDate Sep<11>2014
16:41 Nov 02, 2022
Jkt 259001
The section 327 MOU covers
environmental review responsibilities
for projects that require the preparation
of environmental assessments (EA),
environmental impact statements (EIS),
and non-designated documented
categorical exclusions (DCE). A separate
MOU, pursuant to 23 U.S.C. 326,
authorizes UDOT’s environmental
review responsibilities for other
categorical exclusions (CE), commonly
known as CE Program Assignment. The
scope of this audit did not include the
CE Program Assignment responsibilities
and projects.
As part of FHWA’s review
responsibilities under 23 U.S.C. 327,
FHWA formed a team (the ‘‘Audit
Team’’) in June 2019 to plan and
conduct an audit of NEPA
responsibilities UDOT assumed. The
Audit Team conducted an on-site
review during the week of October 7 to
October 10, 2019. Prior to the on-site
visit, the Audit Team reviewed UDOT’s
NEPA project files, UDOT’s response to
FHWA’s pre-audit information request
(PAIR), UDOT’s NEPA Assignment SelfAssessment Report, UDOT’s NEPA
Quality Assurance/Quality Control (QA/
QC) Guidance, and UDOT’s NEPA
Assignment Training Plan. The Audit
Team conducted interviews with four
members of UDOT central office staff,
three of UDOT’s legal counsel (one
Assistant Attorney General (AG)
assigned to UDOT and two outside
counsel), and seven staff members from
the U.S. Army Corps of Engineers
(USACE) as part of this on-site review.
Overall, the Audit Team found that
UDOT continues to carry out the
assigned environmental review and
transportation decisionmaking
responsibilities successfully. The UDOT
has made efforts to respond to the
FHWA findings from the second audit,
including improving document
management and QA/QC procedures. In
the first and second audits, the FHWA
Audit Team observed inconsistent
understanding of QA/QC procedures
among UDOT staff and lack of
adherence to its QA/QC procedures. In
the third audit, the Audit Team found
that UDOT issued an environmental
document without a final legal
sufficiency finding, and observed that
there were some ways UDOT could
improve their training.
The Audit Team identified one noncompliance observation and one
observation as well as several successful
practices. The Audit Team found UDOT
has been carrying out the
responsibilities it has assumed in
compliance with the provisions of the
Section 327 MOU.
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
66349
Background
The NEPA Assignment Program
allows a State to assume FHWA’s
environmental responsibilities for
review, consultation, and compliance
for Federal-aid highway projects and
certain other FHWA actions. Under 23
U.S.C. 327, a State that assumes these
Federal responsibilities becomes solely
responsible and solely liable for
carrying them out. Effective January 17,
2017, UDOT assumed FHWA’s
responsibilities under NEPA and other
Federal environmental laws. Examples
of responsibilities UDOT has assumed
in addition to NEPA include section 7
consultation under the Endangered
Species Act and consultation under
section 106 of the National Historic
Preservation Act.
After this third audit, FHWA
conducted the fourth and last annual
audit in November 2020 to satisfy
provisions of 23 U.S.C. 327(g) and Part
11 of the MOU. Audits are the primary
mechanism through which FHWA may
oversee UDOT’s compliance with the
MOU and the NEPA Assignment
Program requirements. This includes
ensuring compliance with applicable
Federal environmental laws and
policies, evaluating UDOT’s progress
toward achieving the performance
measures identified in MOU Section
10.2, and collecting information needed
for the Secretary’s annual report to
Congress. The FHWA must present the
results of each audit in a report and
make it available for public comment in
the Federal Register.
The Audit Team consisted of NEPA
subject matter experts from the FHWA
Utah Division as well as additional
FHWA Division staff from California,
Georgia, Alaska, and FHWA
Headquarters. The subject matter
experts received training on how to
assess UDOT’s compliance and assess
the levels of accomplishment associated
with the implementation of the NEPA
Assignment Program in Utah.
Scope and Methodology
The MOU (Part 3.1.1) states that
‘‘[p]ursuant to 23 U.S.C. 327(a)(2)(A), on
the Effective Date, FHWA assigns, and
UDOT assumes, subject to the terms and
conditions set forth in 23 U.S.C. 327 and
this MOU, all of the USDOT Secretary’s
responsibilities for compliance with the
National Environmental Policy Act of
1969 (NEPA), 42 U.S.C. 4321 et seq.
with respect to the highway projects
specified under subpart 3.3. This
assignment includes statutory
provisions, regulations, policies, and
guidance related to the implementation
of NEPA for highway projects such as 23
E:\FR\FM\03NON1.SGM
03NON1
lotter on DSK11XQN23PROD with NOTICES1
66350
Federal Register / Vol. 87, No. 212 / Thursday, November 3, 2022 / Notices
U.S.C. 139, 40 CFR parts 1500–1508,
DOT Order 5610.1C, and 23 CFR 771 as
applicable.’’ Also, the performance
measure in MOU Part 10.2.1(A) for
compliance with NEPA and other
Federal environmental statutes and
regulations commits UDOT to
maintaining documented compliance
with requirements of all applicable
statutes and regulations, as well as
provisions in the MOU.
The Audit Team conducted an
examination of UDOT’s NEPA project
files, UDOT’s responses to the PAIR,
and UDOT’s self-assessment. The audit
also included interviews with staff and
reviews of UDOT policies, guidance,
and manuals pertaining to NEPA
responsibilities. All reviews focused on
objectives related to the six NEPA
Assignment Program elements: program
management; documentation and
records management; QA/QC; legal
sufficiency; training; and performance
measurement.
The focus of the audit was on UDOT’s
process and program implementation.
Therefore, while the Audit Team
reviewed project files to evaluate
UDOT’s NEPA process and procedures,
the Audit Team did not evaluate
UDOT’s project-specific decisions to
determine if they were, in FHWA’s
opinion, appropriate or not. The Audit
Team reviewed 11 NEPA Project files
with DCEs, EAs, and EISs, representing
all projects with decision points or other
actionable items between July 1, 2018,
and June 30, 2019. The Audit Team also
interviewed environmental staff in
UDOT’s headquarters office.
The PAIR consisted of 26 questions
about specific elements in the MOU.
The Audit Team used UDOT’s response
to the PAIR to develop specific followup questions for the on-site interviews
with UDOT staff.
The Audit Team conducted four inperson interviews with UDOT
environmental staff, one in-person
interview with seven staff members of
the USACE, two phone interviews with
UDOT’s outside legal counsel, and one
phone interview with legal counsel from
the Utah Attorney General’s office.
Throughout the document reviews
and interviews, the Audit Team verified
information on the UDOT NEPA
Assignment Program including UDOT
policies, guidance, manuals, and
reports. This included the NEPA QA/QC
Guidance, the NEPA Assignment
Training Plan, and the NEPA
Assignment Self-Assessment Report.
The Audit Team compared the
procedures outlined in UDOT
environmental manuals and policies to
the information obtained during
interviews and project file reviews to
VerDate Sep<11>2014
16:41 Nov 02, 2022
Jkt 259001
determine if there were discrepancies
between UDOT’s performance and
documented procedures. The Audit
Team documented observations under
the six NEPA Assignment Program topic
areas. Below are the audit results.
Overall, UDOT successfully carried
out the environmental responsibilities it
had assumed through the MOU and the
application for the NEPA Assignment
Program, and, as such, the Audit Team
found UDOT was substantially
compliant with the provisions of the
MOU.
Observations and Successful Practices
This section summarizes the Audit
Team’s observations of UDOT’s NEPA
Assignment Program implementation,
including successful practices UDOT
may want to continue or expand.
Successful practices are positive results
FHWA would like to commend UDOT
for developing. These may include ideas
or concepts that UDOT has planned but
not yet implemented. Observations are
items the Audit Team would like to
draw UDOT’s attention to, which may
benefit from revisions to improve
processes, procedures, or outcomes. The
UDOT may have already taken steps to
address or improve upon the Audit
Team’s observations, but at the time of
the audit, they appeared to be areas
where UDOT could make
improvements. This report addresses all
six MOU topic areas as separate
discussions. Under each area, this report
discusses successful practices followed
by observations.
This audit report provides an
opportunity for UDOT to implement
actions to improve their program. The
FHWA considered the status of areas
identified for potential improvement in
this audit’s observations as part of the
scope of Audit #4. The fourth audit
report will include a summary
discussion that describes UDOT’s
progress since this third audit.
Program Management
Successful Practices
During the kickoff meeting, the Audit
Team learned that UDOT has placed the
Environmental Services Division under
Program Development rather than
Project Development. This reorganization helped environmental
services align their work with planning
staff. The UDOT described their interest
in advancing a linking planning and
environment approach related to their
corridor planning process. The UDOT
plans to pilot this approach on some
corridors studies. Implementing this
linking planning and environment
approach could help address new
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
environmental requirements and
initiatives to accelerate project delivery.
The FHWA and UDOT jointly discussed
the opportunity and potential benefits
that could result from hosting a peer
exchange on this subject. In interviews
with the USACE, the Audit Team
learned that they have had recent
discussions with UDOT about this type
of approach.
Within the last auditing period,
UDOT initiated bi-monthly meetings
with USACE to discuss upcoming
projects. Early coordination with
interested agencies can be effective in
early identification and resolution of
issues, and help to accelerate project
delivery. The USACE supports
continuing these early coordination
efforts. In addition, USACE noted that
UDOT’s project managers were diligent
and effective in documenting
discussions in meetings and sending
project-specific meeting notes to them
for review and concurrence.
Through interviews with USACE, the
Audit Team learned that UDOT had
consistently monitored the effectiveness
of its wetland mitigation as required for
permits issued by USACE under Section
404 of the Clean Water Act, and they
sent timely and complete monitoring
reports to the USACE.
The UDOT uses varying methods of
communication for its public
involvement, which UDOT customizes
to the context of each project and the
surrounding community.
Communication methods include, but
are not limited to, one-on-one
discussions with the public, emails and
phone calls UDOT receives from the
public through project websites,
neighborhood gatherings, and placing
door hangers throughout communities.
Public involvement plans evolve
throughout the NEPA process, and
UDOT environmental and public
involvement staff meet as a team to
decide how to address public concerns
as they arise. Through interviews, the
Audit Team learned that UDOT is
exploring the use of virtual public
involvement strategies on some of its
projects, such as the use of videos and
mapping tools, as a means of further
enhancing public engagement.
Documentation and Records
Management
Successful Practices
The UDOT continues to improve
implementation of its project file
system. The UDOT uses ProjectWise as
its environmental file system of record
for NEPA Assignment Program projects.
The folder structure in ProjectWise
outlines the potential components of a
E:\FR\FM\03NON1.SGM
03NON1
Federal Register / Vol. 87, No. 212 / Thursday, November 3, 2022 / Notices
complete project file that consultants
and staff should populate, and UDOT’s
Environmental Document File
Management guidance explains
methods for organizing project files. In
addition, the Environmental
Performance Manager reviews project
folders in ProjectWise to ensure that all
project files are organized in accordance
with the file structure. These measures
have noticeably improved the
organization and completeness of
project files since the first two audits.
Quality Assurance/Quality Control
Successful Practices
The Audit Team learned through the
PAIR response and interviews that, in
response to Audit #2, UDOT had revised
the Environmental Document Review
Tool to differentiate requirements for
EAs and EISs. The UDOT had also
created a new checklist for QA/QC. In
interviews, UDOT staff recognized that
they may need to further revise
procedures to ensure documentation is
complete, and stated that they are
committed to continuing to revise and
implement their process to document
legal sufficiency findings on all
documents requiring findings in
accordance with UDOT’s Manual of
Instruction (MOI) and QA/QC plan. The
UDOT staff’s weekly project meetings,
as well as their biweekly meetings to
talk about issues that arise in the
environmental program, are ways they
can continue to refine their processes.
Legal Sufficiency
Successful Practice
The UDOT Environmental Managers
work directly with outside counsel. The
UDOT Environmental Managers, an
Assistant AG, and outside counsel hold
quarterly meetings during which UDOT
apprises counsel of upcoming project
reviews and anticipated review
deadlines. These quarterly meetings are
one of UDOT’s strategies for keeping the
Assistant AG assigned to UDOT
apprised of all communications between
UDOT staff and outside counsel.
Training
lotter on DSK11XQN23PROD with NOTICES1
Observation #1
The UDOT continues to update its
training plan on an annual basis, as
required under Section 12.2 of the
MOU. During the audit period UDOT
provided its staff 12 training
opportunities on NEPA and other
environmental requirements, in
accordance with the training plan.
Section 12.2 of the MOU states that
‘‘UDOT and FHWA, in consultation
with other Federal agencies as deemed
VerDate Sep<11>2014
16:41 Nov 02, 2022
Jkt 259001
appropriate, will assess UDOT’s need
for training and develop a training
plan.’’ During interviews, however,
USACE, staff stated they have not had
the opportunity to provide input on
UDOT’s training plan. The USACE
expressed that their staff may benefit
from training to better understand
UDOT’s highway design standards,
requirements, and policies. Interagency
discussions regarding training needs
may identify opportunities for crosstraining with the potential to improve
interagency communication and
coordination, and lead to more efficient
permit review and consultation
processes.
Performance Measures
Successful Practices
The UDOT’s self-assessment
documented the performance
management details of the NEPA
Assignment Program in Utah, which
demonstrates UDOT’s procedures under
NEPA assignment have resulted in a
reduction in the time needed to
complete DCEs, EAs, and EISs. The
average time to complete environmental
documents is 7 months for DCEs, 24
months for EAs, and 37 months for EISs.
Although these data are based on a
limited number of completed UDOT
NEPA reviews since January 2017,
UDOT’s initial timeliness results are
promising.
The UDOT regularly updates their
MOI to continuously improve their
policies and procedures. During this
audit period, UDOT updated their MOI
in September 2018. The UDOT has
polled resource agencies every year to
get feedback on their performance. The
UDOT’s self-assessment documents that,
although they had a lower response rate
to their annual resource agency poll this
year (24 percent) compared to last year
(50 percent), the overall evaluation
rating is 4 percent higher than the
ratings prior to NEPA assignment. The
UDOT recognized that the low response
rate may be due to timing (UDOT sent
the surveys in the summer and allowed
2 weeks for responses). In interviews
with the USACE, the Audit Team heard
that the distribution method may also be
a factor. The USACE suggested that
UDOT find a way to give the survey
more visibility (e.g., discuss it at the
bimonthly meeting, phone call in
advance of the email, have it come from
someone they work with regularly).
Non-Compliance Observation
Non-compliance observations are
instances where the Audit Team found
UDOT was out of compliance or
deficient in proper implementation of a
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
66351
Federal regulation, statute, guidance,
policy, the terms of the MOU, or
UDOT’s own procedures for compliance
with the NEPA process. Such
observations may also include instances
where UDOT has failed to maintain
technical competency, adequate
personnel, and/or financial resources to
carry out the assumed responsibilities.
Other non-compliance observations
could suggest a persistent failure to
adequately consult, coordinate, or
consider the concerns of other Federal,
State, Tribal, or local agencies with
oversight, consultation, or coordination
responsibilities. The FHWA expects
UDOT to develop and implement
corrective actions to address all noncompliance observations.
The following non-compliance
observation relates to UDOT not
complying with the State’s
environmental review procedures.
Non-Compliance Observation #1—
Issuing a Document Without Final Legal
Sufficiency Finding
As noted in UDOT’s Self-Assessment
and confirmed through audit interviews
and project file reviews, the Audit Team
learned that in the case of one project’s
individual Section 4(f) evaluation, while
outside counsel reviewed and
commented on the draft evaluation prior
to its release, the project file contained
no documentation demonstrating that
the required legal sufficiency review
was completed pursuant to 23 CFR
771.125(b) and/or 23 CFR 774.7(d) prior
to UDOT’s approval of the evaluation.
This was also not in accordance with
UDOT’s QA/QC plan, Section 4.1.B,
which requires the reviewing attorney
provide the Environmental Program
Manager with written documentation
that the legal sufficiency review has
been completed. The UDOT’s response
to the draft audit report indicated that
they have since implemented a standard
checklist form, to be completed by legal
counsel, to document their project
review to clarify the documentation of
legal sufficiency reviews.
Response to Public Comments on the
Draft Report and the Final Report
The FHWA received one comment
from the American Road &
Transportation Builders Association
(ARTBA) in general support of UDOT’s
implementation of the NEPA
Assignment Program to accelerate
Federal-aid highway program and
project delivery in Utah. The FHWA
appreciates ARTBA’s input and
determined that there is no need to
revise the draft audit report in response
to ARTBA’s comment. Therefore,
FHWA is finalizing UDOT’s third NEPA
E:\FR\FM\03NON1.SGM
03NON1
66352
Federal Register / Vol. 87, No. 212 / Thursday, November 3, 2022 / Notices
Assignment audit report with this
Federal Register notice.
[FR Doc. 2022–23914 Filed 11–2–22; 8:45 am]
BILLING CODE 4910–22–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[FHWA Docket No. FHWA–2021–0019]
Surface Transportation Project
Delivery Program; Alaska Department
of Transportation Fourth Audit Report
Federal Highway
Administration (FHWA), Department of
Transportation (DOT).
ACTION: Notice; request for comment.
AGENCY:
The Moving Ahead for
Progress in the 21st Century Act (MAP–
21) established the Surface
Transportation Project Delivery Program
that allows a State to assume FHWA’s
environmental responsibilities for
environmental review, consultation, and
compliance under the National
Environmental Policy Act (NEPA) for
Federal highway projects. When a State
assumes these Federal responsibilities,
the State becomes solely responsible
and liable for carrying out the
responsibilities it has assumed, in lieu
of FHWA. This program mandates
annual audits during each of the first 4
years of State participation to ensure
compliance with program requirements.
This notice announces and solicits
comments on the fourth audit report for
the Alaska Department of
Transportation and Public Facilities
(DOT&PF).
SUMMARY:
Comments must be received on
or before December 5, 2022.
ADDRESSES: Mail or hand deliver
comments to Docket Management
Facility: U.S. Department of
Transportation, 1200 New Jersey
Avenue SE, Room W12–140,
Washington, DC 20590. You may also
submit comments electronically at
www.regulations.gov. All comments
should include the docket number that
appears in the heading of this
document. All comments received will
be available for examination and
copying at the above address from 9
a.m. to 5 p.m., e.t., Monday through
Friday, except Federal holidays. Those
desiring notification of receipt of
comments must include a selfaddressed, stamped postcard or you
may print the acknowledgment page
that appears after submitting comments
electronically. Anyone can search the
electronic form of all comments in any
of our dockets by the name of the
lotter on DSK11XQN23PROD with NOTICES1
DATES:
VerDate Sep<11>2014
16:41 Nov 02, 2022
Jkt 259001
individual submitting the comment (or
signing the comment, if submitted on
behalf of an association, business, or
labor union). The DOT posts these
comments, without edits, including any
personal information the commenter
provides, to www.regulations.gov, as
described in the system of records
notice (DOT/ALL–14 FDMS), which can
be reviewed at www.dot.gov/privacy.
FOR FURTHER INFORMATION CONTACT: Mr.
David T. Williams, Office of Project
Development and Environmental
Review, (202) 366–5074,
David.Williams@dot.gov, or Mr. Patrick
Smith, Office of the Chief Counsel, (202)
366–1345, Patrick.C.Smith@dot.gov;
Federal Highway Administration, U.S.
Department of Transportation, 1200
New Jersey Avenue SE, Washington, DC
20590. Office hours are from 8:00 a.m.
to 4:30 p.m., e.t., Monday through
Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this notice may
be downloaded from the specific docket
page at www.regulations.gov.
Background
The Surface Transportation Project
Delivery Program, codified at 23 U.S.C.
327, commonly known as the NEPA
Assignment Program, allows a State to
assume FHWA’s environmental
responsibilities for review, consultation,
and compliance for Federal highway
projects. When a State assumes these
Federal responsibilities, the State
becomes solely liable for carrying out
the responsibilities it has assumed, in
lieu of FHWA. The Alaska DOT&PF
published its application for NEPA
assumption on May 1, 2016; and made
it available for public comment for 30
days. After considering public
comments, DOT&PF submitted its
application to FHWA on July 12, 2016.
The application served as the basis for
developing a memorandum of
understanding (MOU) that identified the
responsibilities and obligations that
DOT&PF would assume. The FHWA
published a notice of the draft MOU in
the Federal Register on August 25,
2017, with a 30-day comment period to
solicit the views of the public and
Federal agencies. After the close of the
comment period, FHWA and DOT&PF
considered comments and proceeded to
execute the MOU. Effective November
13, 2017, DOT&PF assumed FHWA’s
responsibilities under NEPA, and the
responsibilities for NEPA-related
Federal environmental laws described
in the MOU.
Section 327(g) of title 23, U.S.C.,
requires the Secretary to conduct annual
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
audits to ensure compliance with the
MOU during each of the first 4 years of
State participation and, after the fourth
year, monitor compliance. The FHWA
must make the results of each audit
available for public comment. The
FHWA published a notice regarding the
third audit report in the Federal
Register on December 7, 2020, soliciting
comments for 30 days pursuant to 23
U.S.C. 327(g). The FHWA received
comments on the draft report from the
American Road & Transportation
Builders Association (ARTBA). The
ARTBA’s comments were supportive of
the Surface Transportation Project
Delivery Program and did not relate
specifically to the audit. The team has
considered these comments and is
finalizing the audit report. This notice
announces the availability of the fourth
audit report to the DOT&PF and solicits
public comment on the same.
Authority: Section 1313 of Public Law
112–141; Section 6005 of Public Law
109–59; 23 U.S.C 327; 23 CFR 773.
Stephanie Pollack,
Deputy Administrator, Federal Highway
Administration.
Surface Transportation Project Delivery
Program, FHWA’s Audit of the Alaska
Department of Transportation
April 12–16, 2021
Executive Summary
This report summarizes the results of
the Federal Highway Administration’s
(FHWA) fourth audit of the Alaska
Department of Transportation and
Public Facilities’ (DOT&PF) assumption
of FHWA’s project-level National
Environmental Policy Act (NEPA)
responsibilities and obligations
pursuant to a 23 U.S.C. 327
Memorandum of Understanding (MOU).
The DOT&PF entered the NEPA
Assignment Program after more than 8
years of experience making FHWA
NEPA Categorical Exclusion (CE)
determinations pursuant to 23 U.S.C.
326 (beginning September 22, 2009).
Alaska’s MOU became effective on
November 13, 2017; and was amended
on August 20, 2020. Currently, FHWA’s
NEPA responsibilities in Alaska include
the oversight and auditing of the
DOT&PF’s execution of the NEPA
Assignment Program and certain
activities excluded from the MOU, such
as the NEPA reviews of projects
advanced by direct recipients other than
the DOT&PF.
The FHWA audit team began to
prepare for the site visit in November
2020. The audit team reviewed
DOT&PF’s NEPA project files,
DOT&PF’s response to FHWA’s pre-
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 87, Number 212 (Thursday, November 3, 2022)]
[Notices]
[Pages 66348-66352]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23914]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[FHWA Docket No. FHWA-2020-0012]
Surface Transportation Project Delivery Program; Utah Department
of Transportation Audit Report
AGENCY: Federal Highway Administration (FHWA), Department of
Transportation (DOT).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Moving Ahead for Progress in the 21st Century Act (MAP-21)
established the Surface Transportation Project Delivery Program that
allows a State to assume FHWA's responsibilities for environmental
review, consultation, and compliance under the National Environmental
Policy Act (NEPA) for Federal highway projects. When a State assumes
these Federal responsibilities, the State becomes solely responsible
and liable for carrying out the responsibilities it has assumed in lieu
of FHWA. This program mandates annual audits during each of the first 4
years of State participation to ensure compliance with program
requirements. This notice finalizes the findings of the third audit
report for the Utah Department of Transportation (UDOT).
FOR FURTHER INFORMATION CONTACT: Mr. David Cohen, Office of Project
Development and Environmental Review, (202) 366-8531,
[email protected], or Mr. Patrick Smith, Office of the Chief Counsel,
(202) 366-1345, [email protected], Federal Highway
Administration, U.S. Department of Transportation, 1200 New Jersey
Avenue SE, Washington, DC 20590. Office hours are from 8:00 a.m. to
4:30 p.m., e.t., Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this notice may be downloaded from the
specific docket page at www.regulations.gov.
Background
The Surface Transportation Project Delivery Program, codified at 23
United States Code (U.S.C.). 327, commonly known as the NEPA Assignment
Program, allows a State to assume FHWA's environmental responsibilities
for review, consultation, and compliance for Federal highway projects.
When a State assumes these Federal responsibilities, the State becomes
solely liable for carrying out the responsibilities in lieu of the
FHWA. The UDOT published its application for NEPA assumption on October
9, 2015, and made it available for public comment for 30 days. After
considering public comments, UDOT submitted its application to FHWA on
December 1, 2015. The application served as the basis for developing a
Memorandum of Understanding (MOU) that identifies the responsibilities
and obligations that UDOT would assume. The FHWA published a notice of
the draft MOU in the Federal Register on November 16, 2016, with a 30-
day comment period to solicit the views of the public and Federal
agencies. After the end of the comment period, FHWA and UDOT considered
comments and proceeded to execute the MOU. Effective January 17, 2017,
UDOT assumed FHWA's
[[Page 66349]]
responsibilities under NEPA, and the responsibilities for other Federal
environmental laws described in the MOU.
Section 327(g) of Title 23, U.S.C., requires the Secretary to
conduct annual audits during each of the first 4 years of State
participation. After the fourth year, the Secretary shall monitor the
State's compliance with the written agreement. The results of each
audit must be made available for public comment. This notice finalizes
the findings of the third audit report for UDOT participation in the
NEPA Assignment program. The FHWA published a draft version of this
report in the Federal Register on September 17, 2020, and made it
available for public review and comment for 30 days in accordance with
23 U.S.C. 327(g). The FHWA received one response to the Federal
Register notice during the public comment period for the draft report.
The only response, from the American Road and Transportation Builders
Association, outlined their general support for the NEPA Assignment
program to accelerate Federal-aid highway program and project delivery.
The FHWA determined that the comment required no changes to the draft
report. This notice finalizes the third NEPA Assignment audit report in
Utah.
Authority: Section 1313 of Public Law 112-141; Section 6005 of
Public Law 109-59; 23 U.S.C. 327; 23 CFR 773.
Stephanie Pollack,
Acting Administrator, Federal Highway Administration.
Surface Transportation Project Delivery Program
FHWA Audit of the Utah Department of Transportation--Final Report
July 1, 2018-June 30, 2019
Executive Summary
This report summarizes the results of the Federal Highway
Administration's (FHWA) third audit of the Utah Department of
Transportation's (UDOT) National Environmental Policy Act (NEPA) review
responsibilities and obligations that FHWA assigned and UDOT assumed
pursuant to 23 United States Code (U.S.C.) 327. Throughout this report,
FHWA uses the term ``NEPA Assignment Program'' to refer to the program
codified at 23 U.S.C. 327. Pursuant to 23 U.S.C. 327, UDOT and FHWA
executed a memorandum of understanding (MOU) on January 17, 2017, to
memorialize UDOT's NEPA responsibilities and liabilities for Federal-
aid highway projects and certain other FHWA approvals in Utah. The
section 327 MOU covers environmental review responsibilities for
projects that require the preparation of environmental assessments
(EA), environmental impact statements (EIS), and non-designated
documented categorical exclusions (DCE). A separate MOU, pursuant to 23
U.S.C. 326, authorizes UDOT's environmental review responsibilities for
other categorical exclusions (CE), commonly known as CE Program
Assignment. The scope of this audit did not include the CE Program
Assignment responsibilities and projects.
As part of FHWA's review responsibilities under 23 U.S.C. 327, FHWA
formed a team (the ``Audit Team'') in June 2019 to plan and conduct an
audit of NEPA responsibilities UDOT assumed. The Audit Team conducted
an on-site review during the week of October 7 to October 10, 2019.
Prior to the on-site visit, the Audit Team reviewed UDOT's NEPA project
files, UDOT's response to FHWA's pre-audit information request (PAIR),
UDOT's NEPA Assignment Self-Assessment Report, UDOT's NEPA Quality
Assurance/Quality Control (QA/QC) Guidance, and UDOT's NEPA Assignment
Training Plan. The Audit Team conducted interviews with four members of
UDOT central office staff, three of UDOT's legal counsel (one Assistant
Attorney General (AG) assigned to UDOT and two outside counsel), and
seven staff members from the U.S. Army Corps of Engineers (USACE) as
part of this on-site review.
Overall, the Audit Team found that UDOT continues to carry out the
assigned environmental review and transportation decisionmaking
responsibilities successfully. The UDOT has made efforts to respond to
the FHWA findings from the second audit, including improving document
management and QA/QC procedures. In the first and second audits, the
FHWA Audit Team observed inconsistent understanding of QA/QC procedures
among UDOT staff and lack of adherence to its QA/QC procedures. In the
third audit, the Audit Team found that UDOT issued an environmental
document without a final legal sufficiency finding, and observed that
there were some ways UDOT could improve their training.
The Audit Team identified one non-compliance observation and one
observation as well as several successful practices. The Audit Team
found UDOT has been carrying out the responsibilities it has assumed in
compliance with the provisions of the Section 327 MOU.
Background
The NEPA Assignment Program allows a State to assume FHWA's
environmental responsibilities for review, consultation, and compliance
for Federal-aid highway projects and certain other FHWA actions. Under
23 U.S.C. 327, a State that assumes these Federal responsibilities
becomes solely responsible and solely liable for carrying them out.
Effective January 17, 2017, UDOT assumed FHWA's responsibilities under
NEPA and other Federal environmental laws. Examples of responsibilities
UDOT has assumed in addition to NEPA include section 7 consultation
under the Endangered Species Act and consultation under section 106 of
the National Historic Preservation Act.
After this third audit, FHWA conducted the fourth and last annual
audit in November 2020 to satisfy provisions of 23 U.S.C. 327(g) and
Part 11 of the MOU. Audits are the primary mechanism through which FHWA
may oversee UDOT's compliance with the MOU and the NEPA Assignment
Program requirements. This includes ensuring compliance with applicable
Federal environmental laws and policies, evaluating UDOT's progress
toward achieving the performance measures identified in MOU Section
10.2, and collecting information needed for the Secretary's annual
report to Congress. The FHWA must present the results of each audit in
a report and make it available for public comment in the Federal
Register.
The Audit Team consisted of NEPA subject matter experts from the
FHWA Utah Division as well as additional FHWA Division staff from
California, Georgia, Alaska, and FHWA Headquarters. The subject matter
experts received training on how to assess UDOT's compliance and assess
the levels of accomplishment associated with the implementation of the
NEPA Assignment Program in Utah.
Scope and Methodology
The MOU (Part 3.1.1) states that ``[p]ursuant to 23 U.S.C.
327(a)(2)(A), on the Effective Date, FHWA assigns, and UDOT assumes,
subject to the terms and conditions set forth in 23 U.S.C. 327 and this
MOU, all of the USDOT Secretary's responsibilities for compliance with
the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C. 4321 et
seq. with respect to the highway projects specified under subpart 3.3.
This assignment includes statutory provisions, regulations, policies,
and guidance related to the implementation of NEPA for highway projects
such as 23
[[Page 66350]]
U.S.C. 139, 40 CFR parts 1500-1508, DOT Order 5610.1C, and 23 CFR 771
as applicable.'' Also, the performance measure in MOU Part 10.2.1(A)
for compliance with NEPA and other Federal environmental statutes and
regulations commits UDOT to maintaining documented compliance with
requirements of all applicable statutes and regulations, as well as
provisions in the MOU.
The Audit Team conducted an examination of UDOT's NEPA project
files, UDOT's responses to the PAIR, and UDOT's self-assessment. The
audit also included interviews with staff and reviews of UDOT policies,
guidance, and manuals pertaining to NEPA responsibilities. All reviews
focused on objectives related to the six NEPA Assignment Program
elements: program management; documentation and records management; QA/
QC; legal sufficiency; training; and performance measurement.
The focus of the audit was on UDOT's process and program
implementation. Therefore, while the Audit Team reviewed project files
to evaluate UDOT's NEPA process and procedures, the Audit Team did not
evaluate UDOT's project-specific decisions to determine if they were,
in FHWA's opinion, appropriate or not. The Audit Team reviewed 11 NEPA
Project files with DCEs, EAs, and EISs, representing all projects with
decision points or other actionable items between July 1, 2018, and
June 30, 2019. The Audit Team also interviewed environmental staff in
UDOT's headquarters office.
The PAIR consisted of 26 questions about specific elements in the
MOU. The Audit Team used UDOT's response to the PAIR to develop
specific follow-up questions for the on-site interviews with UDOT
staff.
The Audit Team conducted four in-person interviews with UDOT
environmental staff, one in-person interview with seven staff members
of the USACE, two phone interviews with UDOT's outside legal counsel,
and one phone interview with legal counsel from the Utah Attorney
General's office.
Throughout the document reviews and interviews, the Audit Team
verified information on the UDOT NEPA Assignment Program including UDOT
policies, guidance, manuals, and reports. This included the NEPA QA/QC
Guidance, the NEPA Assignment Training Plan, and the NEPA Assignment
Self-Assessment Report.
The Audit Team compared the procedures outlined in UDOT
environmental manuals and policies to the information obtained during
interviews and project file reviews to determine if there were
discrepancies between UDOT's performance and documented procedures. The
Audit Team documented observations under the six NEPA Assignment
Program topic areas. Below are the audit results.
Overall, UDOT successfully carried out the environmental
responsibilities it had assumed through the MOU and the application for
the NEPA Assignment Program, and, as such, the Audit Team found UDOT
was substantially compliant with the provisions of the MOU.
Observations and Successful Practices
This section summarizes the Audit Team's observations of UDOT's
NEPA Assignment Program implementation, including successful practices
UDOT may want to continue or expand. Successful practices are positive
results FHWA would like to commend UDOT for developing. These may
include ideas or concepts that UDOT has planned but not yet
implemented. Observations are items the Audit Team would like to draw
UDOT's attention to, which may benefit from revisions to improve
processes, procedures, or outcomes. The UDOT may have already taken
steps to address or improve upon the Audit Team's observations, but at
the time of the audit, they appeared to be areas where UDOT could make
improvements. This report addresses all six MOU topic areas as separate
discussions. Under each area, this report discusses successful
practices followed by observations.
This audit report provides an opportunity for UDOT to implement
actions to improve their program. The FHWA considered the status of
areas identified for potential improvement in this audit's observations
as part of the scope of Audit #4. The fourth audit report will include
a summary discussion that describes UDOT's progress since this third
audit.
Program Management
Successful Practices
During the kickoff meeting, the Audit Team learned that UDOT has
placed the Environmental Services Division under Program Development
rather than Project Development. This re-organization helped
environmental services align their work with planning staff. The UDOT
described their interest in advancing a linking planning and
environment approach related to their corridor planning process. The
UDOT plans to pilot this approach on some corridors studies.
Implementing this linking planning and environment approach could help
address new environmental requirements and initiatives to accelerate
project delivery. The FHWA and UDOT jointly discussed the opportunity
and potential benefits that could result from hosting a peer exchange
on this subject. In interviews with the USACE, the Audit Team learned
that they have had recent discussions with UDOT about this type of
approach.
Within the last auditing period, UDOT initiated bi-monthly meetings
with USACE to discuss upcoming projects. Early coordination with
interested agencies can be effective in early identification and
resolution of issues, and help to accelerate project delivery. The
USACE supports continuing these early coordination efforts. In
addition, USACE noted that UDOT's project managers were diligent and
effective in documenting discussions in meetings and sending project-
specific meeting notes to them for review and concurrence.
Through interviews with USACE, the Audit Team learned that UDOT had
consistently monitored the effectiveness of its wetland mitigation as
required for permits issued by USACE under Section 404 of the Clean
Water Act, and they sent timely and complete monitoring reports to the
USACE.
The UDOT uses varying methods of communication for its public
involvement, which UDOT customizes to the context of each project and
the surrounding community. Communication methods include, but are not
limited to, one-on-one discussions with the public, emails and phone
calls UDOT receives from the public through project websites,
neighborhood gatherings, and placing door hangers throughout
communities. Public involvement plans evolve throughout the NEPA
process, and UDOT environmental and public involvement staff meet as a
team to decide how to address public concerns as they arise. Through
interviews, the Audit Team learned that UDOT is exploring the use of
virtual public involvement strategies on some of its projects, such as
the use of videos and mapping tools, as a means of further enhancing
public engagement.
Documentation and Records Management
Successful Practices
The UDOT continues to improve implementation of its project file
system. The UDOT uses ProjectWise as its environmental file system of
record for NEPA Assignment Program projects. The folder structure in
ProjectWise outlines the potential components of a
[[Page 66351]]
complete project file that consultants and staff should populate, and
UDOT's Environmental Document File Management guidance explains methods
for organizing project files. In addition, the Environmental
Performance Manager reviews project folders in ProjectWise to ensure
that all project files are organized in accordance with the file
structure. These measures have noticeably improved the organization and
completeness of project files since the first two audits.
Quality Assurance/Quality Control
Successful Practices
The Audit Team learned through the PAIR response and interviews
that, in response to Audit #2, UDOT had revised the Environmental
Document Review Tool to differentiate requirements for EAs and EISs.
The UDOT had also created a new checklist for QA/QC. In interviews,
UDOT staff recognized that they may need to further revise procedures
to ensure documentation is complete, and stated that they are committed
to continuing to revise and implement their process to document legal
sufficiency findings on all documents requiring findings in accordance
with UDOT's Manual of Instruction (MOI) and QA/QC plan. The UDOT
staff's weekly project meetings, as well as their biweekly meetings to
talk about issues that arise in the environmental program, are ways
they can continue to refine their processes.
Legal Sufficiency
Successful Practice
The UDOT Environmental Managers work directly with outside counsel.
The UDOT Environmental Managers, an Assistant AG, and outside counsel
hold quarterly meetings during which UDOT apprises counsel of upcoming
project reviews and anticipated review deadlines. These quarterly
meetings are one of UDOT's strategies for keeping the Assistant AG
assigned to UDOT apprised of all communications between UDOT staff and
outside counsel.
Training
Observation #1
The UDOT continues to update its training plan on an annual basis,
as required under Section 12.2 of the MOU. During the audit period UDOT
provided its staff 12 training opportunities on NEPA and other
environmental requirements, in accordance with the training plan.
Section 12.2 of the MOU states that ``UDOT and FHWA, in consultation
with other Federal agencies as deemed appropriate, will assess UDOT's
need for training and develop a training plan.'' During interviews,
however, USACE, staff stated they have not had the opportunity to
provide input on UDOT's training plan. The USACE expressed that their
staff may benefit from training to better understand UDOT's highway
design standards, requirements, and policies. Interagency discussions
regarding training needs may identify opportunities for cross-training
with the potential to improve interagency communication and
coordination, and lead to more efficient permit review and consultation
processes.
Performance Measures
Successful Practices
The UDOT's self-assessment documented the performance management
details of the NEPA Assignment Program in Utah, which demonstrates
UDOT's procedures under NEPA assignment have resulted in a reduction in
the time needed to complete DCEs, EAs, and EISs. The average time to
complete environmental documents is 7 months for DCEs, 24 months for
EAs, and 37 months for EISs. Although these data are based on a limited
number of completed UDOT NEPA reviews since January 2017, UDOT's
initial timeliness results are promising.
The UDOT regularly updates their MOI to continuously improve their
policies and procedures. During this audit period, UDOT updated their
MOI in September 2018. The UDOT has polled resource agencies every year
to get feedback on their performance. The UDOT's self-assessment
documents that, although they had a lower response rate to their annual
resource agency poll this year (24 percent) compared to last year (50
percent), the overall evaluation rating is 4 percent higher than the
ratings prior to NEPA assignment. The UDOT recognized that the low
response rate may be due to timing (UDOT sent the surveys in the summer
and allowed 2 weeks for responses). In interviews with the USACE, the
Audit Team heard that the distribution method may also be a factor. The
USACE suggested that UDOT find a way to give the survey more visibility
(e.g., discuss it at the bimonthly meeting, phone call in advance of
the email, have it come from someone they work with regularly).
Non-Compliance Observation
Non-compliance observations are instances where the Audit Team
found UDOT was out of compliance or deficient in proper implementation
of a Federal regulation, statute, guidance, policy, the terms of the
MOU, or UDOT's own procedures for compliance with the NEPA process.
Such observations may also include instances where UDOT has failed to
maintain technical competency, adequate personnel, and/or financial
resources to carry out the assumed responsibilities. Other non-
compliance observations could suggest a persistent failure to
adequately consult, coordinate, or consider the concerns of other
Federal, State, Tribal, or local agencies with oversight, consultation,
or coordination responsibilities. The FHWA expects UDOT to develop and
implement corrective actions to address all non-compliance
observations.
The following non-compliance observation relates to UDOT not
complying with the State's environmental review procedures.
Non-Compliance Observation #1--Issuing a Document Without Final Legal
Sufficiency Finding
As noted in UDOT's Self-Assessment and confirmed through audit
interviews and project file reviews, the Audit Team learned that in the
case of one project's individual Section 4(f) evaluation, while outside
counsel reviewed and commented on the draft evaluation prior to its
release, the project file contained no documentation demonstrating that
the required legal sufficiency review was completed pursuant to 23 CFR
771.125(b) and/or 23 CFR 774.7(d) prior to UDOT's approval of the
evaluation. This was also not in accordance with UDOT's QA/QC plan,
Section 4.1.B, which requires the reviewing attorney provide the
Environmental Program Manager with written documentation that the legal
sufficiency review has been completed. The UDOT's response to the draft
audit report indicated that they have since implemented a standard
checklist form, to be completed by legal counsel, to document their
project review to clarify the documentation of legal sufficiency
reviews.
Response to Public Comments on the Draft Report and the Final Report
The FHWA received one comment from the American Road &
Transportation Builders Association (ARTBA) in general support of
UDOT's implementation of the NEPA Assignment Program to accelerate
Federal-aid highway program and project delivery in Utah. The FHWA
appreciates ARTBA's input and determined that there is no need to
revise the draft audit report in response to ARTBA's comment.
Therefore, FHWA is finalizing UDOT's third NEPA
[[Page 66352]]
Assignment audit report with this Federal Register notice.
[FR Doc. 2022-23914 Filed 11-2-22; 8:45 am]
BILLING CODE 4910-22-P