Moon Lake Electric Association, Inc.; Notice of Authorization for Continued Project Operation, 65766 [2022-23736]
Download as PDF
65766
Federal Register / Vol. 87, No. 210 / Tuesday, November 1, 2022 / Notices
Filed Date: 10/26/22.
Accession Number: 20221026–5033.
Comment Date: 5 p.m. ET 11/7/22.
Docket Numbers: RP23–75–000.
Applicants: Sierrita Gas Pipeline LLC.
Description: § 4(d) Rate Filing: 2022
Oct Quarterly FL&U Filing to be
effective 12/1/2022.
Filed Date: 10/26/22.
Accession Number: 20221026–5053.
Comment Date: 5 p.m. ET 11/7/22.
Docket Numbers: RP23–76–000.
Applicants: National Grid LNG, LLC.
Description: Compliance filing: 2022–
10–26 Fields Point Liquefaction Project
In-Service Tariff Filing to be effective
11/28/2022.
Filed Date: 10/26/22.
Accession Number: 20221026–5093.
Comment Date: 5 p.m. ET 11/7/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 26, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–23768 Filed 10–31–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1773–000]
lotter on DSK11XQN23PROD with NOTICES1
Moon Lake Electric Association, Inc.;
Notice of Authorization for Continued
Project Operation
The license for the Yellowstone
Hydroelectric Project No.1773 was
issued for a period ending September
30, 2022.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
VerDate Sep<11>2014
17:11 Oct 31, 2022
Jkt 259001
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No.1773 is
issued to the Moon Lake Electric
Association, Inc for a period effective
October 1, 2022, through September 30,
2023, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before September 30, 2023,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the Moon Lake Electric Association,
Inc. is authorized to continue operation
of the Yellowstone Hydroelectric Project
under the terms and conditions of the
prior license until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first.
Dated: October 26, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–23736 Filed 10–31–22; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL ELECTION COMMISSION
Sunshine Act Meetings
Tuesday, November 15,
2022, at 10:00 a.m. and its continuation
TIME AND DATE:
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
at the conclusion of the open meeting
on November 17, 2022.
PLACE: 1050 First Street NE,
Washington, DC, and Virtual (This
meeting will be a hybrid meeting).
STATUS: This meeting will be closed to
the public.
MATTERS TO BE CONSIDERED: Compliance
matters pursuant to 52 U.S.C. 30109.
Matters relating to internal personnel
decisions, or internal rules and
practices.
Information the premature disclosure
of which would be likely to have a
considerable adverse effect on the
implementation of a proposed
Commission.
Matters concerning participation in
civil actions or proceedings or
arbitration.
*
*
*
*
*
CONTACT PERSON FOR MORE INFORMATION:
Judith Ingram, Press Officer, Telephone:
(202) 694–1220.
(Authority: Government in the Sunshine Act,
5 U.S.C. 552b)
Vicktoria J. Allen,
Acting Deputy Secretary of the Commission.
[FR Doc. 2022–23794 Filed 10–28–22; 11:15 am]
BILLING CODE 6715–01–P
FEDERAL RESERVE SYSTEM
Formations of, Acquisitions by, and
Mergers of Bank Holding Companies
The companies listed in this notice
have applied to the Board for approval,
pursuant to the Bank Holding Company
Act of 1956 (12 U.S.C. 1841 et seq.)
(BHC Act), Regulation Y (12 CFR part
225), and all other applicable statutes
and regulations to become a bank
holding company and/or to acquire the
assets or the ownership of, control of, or
the power to vote shares of a bank or
bank holding company and all of the
banks and nonbanking companies
owned by the bank holding company,
including the companies listed below.
The public portions of the
applications listed below, as well as
other related filings required by the
Board, if any, are available for
immediate inspection at the Federal
Reserve Bank(s) indicated below and at
the offices of the Board of Governors.
This information may also be obtained
on an expedited basis, upon request, by
contacting the appropriate Federal
Reserve Bank and from the Board’s
Freedom of Information Office at
https://www.federalreserve.gov/foia/
request.htm. Interested persons may
express their views in writing on the
standards enumerated in the BHC Act
(12 U.S.C. 1842(c)).
E:\FR\FM\01NON1.SGM
01NON1
Agencies
[Federal Register Volume 87, Number 210 (Tuesday, November 1, 2022)]
[Notices]
[Page 65766]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23736]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1773-000]
Moon Lake Electric Association, Inc.; Notice of Authorization for
Continued Project Operation
The license for the Yellowstone Hydroelectric Project No.1773 was
issued for a period ending September 30, 2022.
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee(s) under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth
at 18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on its application. If the licensee of such a project
has not filed an application for a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b), to continue project operations
until the Commission issues someone else a license for the project or
otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No.1773 is issued to
the Moon Lake Electric Association, Inc for a period effective October
1, 2022, through September 30, 2023, or until the issuance of a new
license for the project or other disposition under the FPA, whichever
comes first. If issuance of a new license (or other disposition) does
not take place on or before September 30, 2023, notice is hereby given
that, pursuant to 18 CFR 16.18(c), an annual license under section
15(a)(1) of the FPA is renewed automatically without further order or
notice by the Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the Moon Lake Electric Association, Inc. is
authorized to continue operation of the Yellowstone Hydroelectric
Project under the terms and conditions of the prior license until the
issuance of a new license for the project or other disposition under
the FPA, whichever comes first.
Dated: October 26, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-23736 Filed 10-31-22; 8:45 am]
BILLING CODE 6717-01-P