Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2, 65617 [2022-23633]
Download as PDF
65617
Federal Register / Vol. 87, No. 209 / Monday, October 31, 2022 / Notices
Document description
ADAMS accession No.
Indian Point Exemption Environmental Assessment Conversation Record (6–16–22), date of contact June 16,
2022.
Neutron Source Assembly Loading Clarification Call, date of contact September 20, 2022 .......................................
Issuance of Certificate of Compliance No. 1014, Amendment No. 15 for the HI–STORM 100 Multipurpose Canister Storage System, dated May 13, 2021.
HI–2002444, Revision 22, Holtec International Final Safety Analysis Report for the HI–STORM 100 Cask System,
dated August 9, 2021.
Environmental Assessment and Finding of No Significant Impact, dated October 25, 2022 .......................................
Indian Point Energy Center—Review of Post-Shutdown Decommissioning Activities Report, dated May 2, 2022 .....
Email Transmitting Indian Point Exemption Draft EA, dated July 19, 2022 .................................................................
New York State Neutron Source Assembly Exemption Comments & Draft Environmental Assessment Review,
dated August 1, 2022.
Response to Comments on Exemption Related to Allowable Contents for the Certificate of Compliance No. 1014,
HI–STORM 100S Version E Cask, dated October 14, 2022.
Email Transmitting Revised Indian Point Exemption Draft EA, dated September 28, 2022 ........................................
New York State Revised Draft EA Response Email, dated September 29, 2022 ........................................................
Dated: October 26, 2022.
For the Nuclear Regulatory Commission.
Yoira K. Diaz-Sanabria,
Chief, Storage and Transportation Licensing
Branch, Division of Fuel Management, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2022–23657 Filed 10–28–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–445 and 50–446; NRC–
2022–0183]
Vistra Operations Company LLC;
Comanche Peak Nuclear Power Plant,
Units 1 and 2
Nuclear Regulatory
Commission.
ACTION: License renewal application;
receipt.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has received an
application for the renewal of Facility
Operating License Nos. NPF–87 and
NPF–89, which authorize Vistra
Operations Company LLC (VOC or the
applicant) to operate Comanche Peak
Nuclear Power Plant (CPNPP), Units 1
and 2. The renewed licenses would
authorize the applicant to operate
CPNPP for an additional 20 years
beyond the period specified in each of
the current licenses. The current
operating licenses for CPNPP expire as
follows: Unit 1 on February 8, 2030, and
Unit 2 on February 2, 2033.
DATES: The license renewal application
referenced in this document was
available on October 3, 2022.
ADDRESSES: Please refer to Docket ID
NRC–2022–0183 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:15 Oct 28, 2022
Jkt 259001
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0183. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. The ‘‘Comanche
Peak Nuclear Power Plant, Units 1 and
2—Facility Operating License Numbers
NPF–87 and NPF–89—License Renewal
Application,’’ is available in ADAMS
under Accession No. ML22276A082.
• Public Library: A copy of the
license renewal application for CPNPP
can be accessed at the following public
libraries: Somervell County Library, 108
Allen Dr, Glen Rose, TX 76043, and
Hood County Library, 222 N Travis St.,
Granbury, TX 76048.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Emmanuel Sayoc, Office of Nuclear
Reactor Regulation, U.S. Nuclear
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
ML22172A174.
ML22264A045.
ML21118A862 (Package).
ML21221A329.
ML22215A098.
ML22082A220.
ML22208A029.
ML22215A042 (Package).
ML22234A063.
ML22271A849.
ML22276A164.
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
4084; email: Emmanuel.Sayoc@nrc.gov.
SUPPLEMENTARY INFORMATION: The NRC
has received an application from VOC,
dated October 3, 2022, filed pursuant to
section 103 of the Atomic Energy Act of
1954, as amended, and part 54 of title
10 of the Code of Federal Regulations,
‘‘Requirements for Renewal of Operating
Licenses for Nuclear Power Plants,’’ to
renew the operating licenses for CPNPP.
Renewal of the licenses would authorize
the applicant to operate the facility for
an additional 20-year period beyond the
period specified in the respective
current operating licenses. The current
operating licenses for CPNPP expire as
follows: Unit 1 on February 8, 2030, and
Unit 2 on February 2, 2033. The CPNPP
units are Pressurized Water Reactors
located in Somervell County, Texas. The
acceptability of the tendered application
for docketing, and other matters,
including an opportunity to request a
hearing, will be the subject of
subsequent Federal Register notices.
Dated: October 26, 2022.
For the Nuclear Regulatory Commission.
Lauren K. Gibson,
Chief, License Renewal Project Branch,
Division of New and Renewed Licenses, Office
of Nuclear Reactor Regulation.
[FR Doc. 2022–23633 Filed 10–28–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2022–0001]
Sunshine Act Meetings
Weeks of October 31,
November 7, 14, 21, 28, December 5,
2022. The schedule for Commission
meetings is subject to change on short
notice. The NRC Commission Meeting
Schedule can be found on the internet
TIME AND DATE:
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 87, Number 209 (Monday, October 31, 2022)]
[Notices]
[Page 65617]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23633]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-445 and 50-446; NRC-2022-0183]
Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant,
Units 1 and 2
AGENCY: Nuclear Regulatory Commission.
ACTION: License renewal application; receipt.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has received an
application for the renewal of Facility Operating License Nos. NPF-87
and NPF-89, which authorize Vistra Operations Company LLC (VOC or the
applicant) to operate Comanche Peak Nuclear Power Plant (CPNPP), Units
1 and 2. The renewed licenses would authorize the applicant to operate
CPNPP for an additional 20 years beyond the period specified in each of
the current licenses. The current operating licenses for CPNPP expire
as follows: Unit 1 on February 8, 2030, and Unit 2 on February 2, 2033.
DATES: The license renewal application referenced in this document was
available on October 3, 2022.
ADDRESSES: Please refer to Docket ID NRC-2022-0183 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0183. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the For Further Information
Contact section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ``Comanche Peak Nuclear Power
Plant, Units 1 and 2--Facility Operating License Numbers NPF-87 and
NPF-89--License Renewal Application,'' is available in ADAMS under
Accession No. ML22276A082.
Public Library: A copy of the license renewal application
for CPNPP can be accessed at the following public libraries: Somervell
County Library, 108 Allen Dr, Glen Rose, TX 76043, and Hood County
Library, 222 N Travis St., Granbury, TX 76048.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Emmanuel Sayoc, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-4084; email: [email protected].
SUPPLEMENTARY INFORMATION: The NRC has received an application from
VOC, dated October 3, 2022, filed pursuant to section 103 of the Atomic
Energy Act of 1954, as amended, and part 54 of title 10 of the Code of
Federal Regulations, ``Requirements for Renewal of Operating Licenses
for Nuclear Power Plants,'' to renew the operating licenses for CPNPP.
Renewal of the licenses would authorize the applicant to operate the
facility for an additional 20-year period beyond the period specified
in the respective current operating licenses. The current operating
licenses for CPNPP expire as follows: Unit 1 on February 8, 2030, and
Unit 2 on February 2, 2033. The CPNPP units are Pressurized Water
Reactors located in Somervell County, Texas. The acceptability of the
tendered application for docketing, and other matters, including an
opportunity to request a hearing, will be the subject of subsequent
Federal Register notices.
Dated: October 26, 2022.
For the Nuclear Regulatory Commission.
Lauren K. Gibson,
Chief, License Renewal Project Branch, Division of New and Renewed
Licenses, Office of Nuclear Reactor Regulation.
[FR Doc. 2022-23633 Filed 10-28-22; 8:45 am]