Airworthiness Directives; Airbus Canada Limited Partnership (Type Certificate Previously Held by C Series Aircraft Limited Partnership (CSALP); Bombardier, Inc.) Airplanes, 65538-65541 [2022-23012]
Download as PDF
65538
Federal Register / Vol. 87, No. 209 / Monday, October 31, 2022 / Proposed Rules
(i) Provisions for Alternative Actions,
Thresholds, and Intervals, Including Life
Limits
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
After performing the action required by
paragraph (g) of this AD, no alternative
actions and associated thresholds and
intervals, including life limits, are allowed
unless they are approved as specified in the
provisions of the ‘‘Ref. Publications’’ section
of EASA AD 2022–0083.
(j) Alternative Methods of Compliance
(AMOCs)
The Manager, ECO Branch, FAA, has the
authority to approve AMOCs for this AD, if
requested using the procedures found in 14
CFR 39.19. In accordance with 14 CFR 39.19,
send your request to your principal inspector
or local Flight Standards District Office, as
appropriate. If sending information directly
to the manager of the certification office,
send it to the attention of the person
identified in paragraph (k) of this AD and
email to: ANE-AD-AMOC@faa.gov. Before
using any approved AMOC, notify your
appropriate principal inspector, or lacking a
principal inspector, the manager of the local
flight standards district office/certificate
holding district office.
(k) Additional Information
For more information about this AD,
contact Kevin Clark, Aviation Safety
Engineer, ECO Branch, FAA, 1200 District
Avenue, Burlington, MA 01803; phone: (781)
238–7088; email: kevin.m.clark@faa.gov.
khammond on DSKJM1Z7X2PROD with PROPOSALS
(l) Material Incorporated by Reference
(1) The Director of the Federal Register
approved the incorporation by reference of
the material listed in this paragraph under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information
as applicable to do the actions required by
this AD, unless the AD specifies otherwise.
(i) European Union Aviation Safety Agency
AD 2022–0083, dated May 11, 2022.
(ii) Reserved.
(3) For EASA AD 2022–0083, contact
EASA, Konrad-Adenauer-Ufer 3, 50668
Cologne, Germany; phone: +49 221 8999 000;
email: ADs@easa.europa.eu. You may find
this material on the EASA website at
ad.easa.europa.eu.
(4) You may view this service information
at FAA, Airworthiness Products Section,
Operational Safety Branch, 1200 District
Avenue, Burlington, MA 01803. For
information on the availability of this
material at the FAA, call (817) 222–5110.
(5) You may view this service information
that is incorporated by reference at the
National Archives and Records
Administration (NARA). For information on
the availability of this material at NARA,
email: fr.inspection@nara.gov, or go to:
www.archives.gov/federal-register/cfr/ibrlocations.html.
Issued on October 20, 2022.
Christina Underwood,
Acting Director, Compliance & Airworthiness
Division, Aircraft Certification Service.
[FR Doc. 2022–23172 Filed 10–28–22; 8:45 am]
BILLING CODE 4910–13–P
VerDate Sep<11>2014
16:52 Oct 28, 2022
Jkt 259001
14 CFR Part 39
[Docket No. FAA–2022–1308; Project
Identifier MCAI–2022–00532–T]
RIN 2120–AA64
Airworthiness Directives; Airbus
Canada Limited Partnership (Type
Certificate Previously Held by C Series
Aircraft Limited Partnership (CSALP);
Bombardier, Inc.) Airplanes
Federal Aviation
Administration (FAA), DOT.
ACTION: Notice of proposed rulemaking
(NPRM).
AGENCY:
The FAA proposes to
supersede Airworthiness Directive (AD)
2021–04–05, which applies to certain
Airbus Canada Limited Partnership
Model BD–500–1A10 and BD–500–
1A11 airplanes. AD 2021–04–05
requires revising the existing
maintenance or inspection program, as
applicable, to incorporate new or more
restrictive airworthiness limitations.
Since the FAA issued AD 2021–04–05,
the FAA has determined that new or
more restrictive airworthiness
limitations are necessary. This proposed
AD would continue to require the
actions in AD 2021–04–05 and require
revising the existing maintenance or
inspection program, as applicable, to
incorporate new or more restrictive
airworthiness limitations. The FAA is
proposing this AD to address the unsafe
condition on these products.
DATES: The FAA must receive comments
on this proposed AD by December 15,
2022.
ADDRESSES: You may send comments,
using the procedures found in 14 CFR
11.43 and 11.45, by any of the following
methods:
• Federal eRulemaking Portal: Go to
regulations.gov. Follow the instructions
for submitting comments.
• Fax: 202–493–2251.
• Mail: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE,
Washington, DC 20590.
• Hand Delivery: Deliver to Mail
address above between 9 a.m. and 5
p.m., Monday through Friday, except
Federal holidays.
AD Docket: You may examine the AD
docket at regulations.gov under Docket
No. FAA–2022–1308; or in person at
Docket Operations between 9 a.m. and
5 p.m., Monday through Friday, except
Federal holidays. The AD docket
SUMMARY:
PO 00000
Frm 00006
Fmt 4702
Sfmt 4702
contains this NPRM, the mandatory
continuing airworthiness information
(MCAI), any comments received, and
other information. The street address for
Docket Operations is listed above.
Material Incorporated by Reference:
• For service information identified
in this NPRM, contact Airbus Canada
Limited Partnership, 13100 Henri-Fabre
Boulevard, Mirabel, Que´bec J7N 3C6,
Canada; telephone 450–476–7676; email
a220_crc@abc.airbus; website
a220world.airbus.com.
• You may view this service
information at the FAA, Airworthiness
Products Section, Operational Safety
Branch, 2200 South 216th St., Des
Moines, WA. For information on the
availability of this material at the FAA,
call 206–231–3195.
FOR FURTHER INFORMATION CONTACT:
Gabriel Kim, Aerospace Engineer,
Airframe and Propulsion Section, FAA,
New York ACO Branch, 1600 Stewart
Avenue, Suite 410, Westbury, NY
11590; telephone 516–228–7300; email
9-avs-nyaco-cos@faa.gov.
SUPPLEMENTARY INFORMATION:
Comments Invited
The FAA invites you to send any
written relevant data, views, or
arguments about this proposal. Send
your comments to an address listed
under ADDRESSES. Include ‘‘Docket No.
FAA–2022–1308; Project Identifier
MCAI–2022–00532–T’’ at the beginning
of your comments. The most helpful
comments reference a specific portion of
the proposal, explain the reason for any
recommended change, and include
supporting data. The FAA will consider
all comments received by the closing
date and may amend the proposal
because of those comments.
Except for Confidential Business
Information (CBI) as described in the
following paragraph, and other
information as described in 14 CFR
11.35, the FAA will post all comments
received, without change, to
regulations.gov, including any personal
information you provide. The agency
will also post a report summarizing each
substantive verbal contact received
about this NPRM.
Confidential Business Information
CBI is commercial or financial
information that is both customarily and
actually treated as private by its owner.
Under the Freedom of Information Act
(FOIA) (5 U.S.C. 552), CBI is exempt
from public disclosure. If your
comments responsive to this NPRM
contain commercial or financial
information that is customarily treated
as private, that you actually treat as
E:\FR\FM\31OCP1.SGM
31OCP1
Federal Register / Vol. 87, No. 209 / Monday, October 31, 2022 / Proposed Rules
private, and that is relevant or
responsive to this NPRM, it is important
that you clearly designate the submitted
comments as CBI. Please mark each
page of your submission containing CBI
as ‘‘PROPIN.’’ The FAA will treat such
marked submissions as confidential
under the FOIA, and they will not be
placed in the public docket of this
NPRM. Submissions containing CBI
should be sent to Gabriel Kim,
Aerospace Engineer, Airframe and
Propulsion Section, FAA, New York
ACO Branch, 1600 Stewart Avenue,
Suite 410, Westbury, NY 11590;
telephone 516–228–7300; email 9-avsnyaco-cos@faa.gov. Any commentary
that the FAA receives which is not
specifically designated as CBI will be
placed in the public docket for this
rulemaking.
Background
The FAA issued AD 2021–04–05,
Amendment 39–21426 (86 FR 10799,
February 23, 2021) (AD 2021–04–05),
which applies to certain Airbus Canada
Limited Partnership Model BD–500–
1A10 and BD–500–1A11 airplanes. AD
2021–04–05 requires revising the
existing maintenance or inspection
program, as applicable, to incorporate
new or more restrictive airworthiness
limitations. AD 2021–04–05 resulted
from a determination that new or more
restrictive airworthiness limitations are
necessary. The FAA issued AD 2021–
04–05 to address reduced structural
integrity of the airplane or reduced
controllability of the airplane.
khammond on DSKJM1Z7X2PROD with PROPOSALS
Actions Since AD 2021–04–05 Was
Issued
Since the FAA issued AD 2021–04–
05, the FAA has determined that new or
more restrictive airworthiness
limitations are necessary
Transport Canada Civil Aviation
(TCCA), which is the aviation authority
for Canada, has issued TCCA AD CF–
2022–18, dated April 14, 2022 (TCCA
AD CF–2022–18) (also referred to after
this as the MCAI), to correct an unsafe
condition for certain Airbus Canada
Limited Partnership Model BD–500–
1A10 and BD–500–1A11 airplanes.
Airplanes with an original airworthiness
certificate or original export certificate
of airworthiness issued after February 3,
2022, must comply with the
airworthiness limitations specified as
part of the approved type design and
referenced on the type certificate data
sheet; this proposed AD therefore does
not include those airplanes in the
applicability.
You may examine the MCAI in the
AD docket at regulations.gov by
VerDate Sep<11>2014
16:52 Oct 28, 2022
Jkt 259001
searching for and locating Docket No.
FAA–2022–1308.
This proposed AD was prompted by
a determination that new or more
restrictive airworthiness limitations are
necessary. The FAA is proposing this
AD to address reduced structural
integrity of the airplane or reduced
controllability of the airplane.
Related Service Information Under
1 CFR Part 51
Airbus Canada Limited Partnership
has issued A220 Airworthiness
Limitations, BD500–3AB48–11400–02,
Issue 014.00, dated February 3, 2022.
This service information describes
airworthiness limitations for fuel tank
systems, safe life limits, and
certification maintenance requirements.
This proposed AD would also require
Airbus Canada Limited Partnership
A220 Airworthiness Limitations,
BD500–3AB48–11400–02, Issue 011.00,
dated June 18, 2020, which the Director
of the Federal Register approved for
incorporation by reference as of March
30, 2021 (86 FR 10799, February 23,
2021).
This service information is reasonably
available because the interested parties
have access to it through their normal
course of business or by the means
identified in the ADDRESSES section.
65539
General;’’ 05, ‘‘Life limited parts
(systems)—General;’’ 06, ‘‘Life limited
parts (structures)—General;’’ 07, ‘‘Fuel
system limitations—General;’’ 08,
‘‘Critical design configuration control
limitations—General;’’ 09, ‘‘Power plant
limitations—General;’’ 10, ‘‘Structural
repair limitations—General;’’ and 11,
‘‘Limit of validity—General;’’ of Airbus
Canada Limited Partnership A220
Airworthiness Limitations, BD500–
3AB48–11400–02, Issue 011.00, dated
June 18, 2020, only.
This proposed AD would require
revisions to certain operator
maintenance documents to include new
actions (e.g., inspections) and Critical
Design Configuration Control
Limitations (CDCCLs). Compliance with
these actions and CDCCLs is required by
14 CFR 91.403(c). For airplanes that
have been previously modified, altered,
or repaired in the areas addressed by
this proposed AD, the operator may not
be able to accomplish the actions
described in the revisions. In this
situation, to comply with 14 CFR
91.403(c), the operator must request
approval for an alternative method of
compliance according to paragraph
(k)(1) of this proposed AD.
FAA’s Determination
This product has been approved by
the aviation authority of another
country, and is approved for operation
in the United States. Pursuant to the
FAA’s bilateral agreement with the State
of Design Authority, the FAA has been
notified of the unsafe condition
described in the MCAI and service
information referenced above. The FAA
is proposing this AD because the FAA
evaluated all the relevant information
and determined the unsafe condition
described previously is likely to exist or
develop on other products of the same
type design.
Differences Between This Proposed AD
and the MCAI
TCCA AD CF–2022–18 specifies to
incorporate all sections of the
airworthiness limitations document.
This proposed AD would not require the
incorporation of Section 03, ‘‘Candidate
CMR limitations—General,’’ of Airbus
Canada Limited Partnership A220
Airworthiness Limitations, BD500–
3AB48–11400–02, Issue 014.00, dated
February 3, 2022. However, this
proposed AD would continue to require
the incorporation of Section 03,
‘‘Candidate CMR limitations—General,’’
of Airbus Canada Limited Partnership
A220 Airworthiness Limitations,
BD500–3AB48–11400–02, Issue 011.00,
dated June 18, 2020.
Proposed Requirements of This NPRM
This proposed AD would retain all of
the requirements of AD 2021–04–05.
This proposed AD would require
revising the existing maintenance or
inspection program, as applicable, to
incorporate new or more restrictive
airworthiness limitations. Revising the
existing maintenance or inspection
program as proposed in this AD would
terminate the retained requirements
from AD 2021–04–05 in paragraph (g) of
this proposed AD, for Sections 01,
‘‘Airworthiness limitations—
Introduction;’’ 02, ‘‘Certification
maintenance requirements—General;’’
04, ‘‘ALI structural inspections—
Costs of Compliance
The FAA estimates that this proposed
AD affects 70 airplanes of U.S. registry.
The FAA estimates the following costs
to comply with this proposed AD:
The FAA estimates the total cost per
operator for the retained actions from
AD 2021–04–05 to be $7,650 (90 workhours × $85 per work-hour).
The FAA has determined that revising
the maintenance or inspection program
takes an average of 90 work-hours per
operator, although the agency
recognizes that this number may vary
from operator to operator. Since
operators incorporate maintenance or
inspection program changes for their
PO 00000
Frm 00007
Fmt 4702
Sfmt 4702
E:\FR\FM\31OCP1.SGM
31OCP1
65540
Federal Register / Vol. 87, No. 209 / Monday, October 31, 2022 / Proposed Rules
affected fleet(s), the FAA has
determined that a per-operator estimate
is more accurate than a per-airplane
estimate. Therefore, the agency
estimates the average total cost per
operator to be $7,650 (90 work-hours ×
$85 per work-hour).
The FAA estimates the total cost per
operator for the new proposed actions to
be $7,650 (90 work-hours × $85 per
work-hour).
Authority for This Rulemaking
Title 49 of the United States Code
specifies the FAA’s authority to issue
rules on aviation safety. Subtitle I,
section 106, describes the authority of
the FAA Administrator. Subtitle VII:
Aviation Programs, describes in more
detail the scope of the Agency’s
authority.
The FAA is issuing this rulemaking
under the authority described in
Subtitle VII, Part A, Subpart III, Section
44701: General requirements. Under
that section, Congress charges the FAA
with promoting safe flight of civil
aircraft in air commerce by prescribing
regulations for practices, methods, and
procedures the Administrator finds
necessary for safety in air commerce.
This regulation is within the scope of
that authority because it addresses an
unsafe condition that is likely to exist or
develop on products identified in this
rulemaking action.
Regulatory Findings
khammond on DSKJM1Z7X2PROD with PROPOSALS
The FAA determined that this
proposed AD would not have federalism
implications under Executive Order
13132. This proposed AD would not
have a substantial direct effect on the
States, on the relationship between the
national Government and the States, or
on the distribution of power and
responsibilities among the various
levels of government.
For the reasons discussed above, I
certify this proposed regulation:
(1) Is not a ‘‘significant regulatory
action’’ under Executive Order 12866,
(2) Would not affect intrastate
aviation in Alaska, and
(3) Would not have a significant
economic impact, positive or negative,
on a substantial number of small entities
under the criteria of the Regulatory
Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation
safety, Incorporation by reference,
Safety.
The Proposed Amendment
Accordingly, under the authority
delegated to me by the Administrator,
VerDate Sep<11>2014
16:52 Oct 28, 2022
Jkt 259001
the FAA proposes to amend 14 CFR part
39 as follows:
PART 39—AIRWORTHINESS
DIRECTIVES
1. The authority citation for part 39
continues to read as follows:
■
Authority: 49 U.S.C. 106(g), 40113, 44701.
§ 39.13
[Amended]
2. The FAA amends § 39.13 by:
a. Removing Airworthiness Directive
(AD) 2021–04–05, Amendment 39–
21426 (86 FR 10799, February 23, 2021);
and
■ b. Adding the following new AD:
■
■
Airbus Canada Limited Partnership (Type
Certificate Previously Held by C Series
Aircraft Limited Partnership (CSALP);
Bombardier, Inc.): Docket No. FAA–
2022–1308; Project Identifier MCAI–
2022–00532–T.
(a) Comments Due Date
The FAA must receive comments on this
airworthiness directive (AD) by December 15,
2022.
(b) Affected ADs
This AD replaces AD 2021–04–05,
Amendment 39–21426 (86 FR 10799,
February 23, 2021) (AD 2021–04–05).
(c) Applicability
This AD applies to Airbus Canada Limited
Partnership airplanes, certificated in any
category, as identified in paragraphs (c)(1)
and (2) of this AD.
(1) Model BD–500–1A10 airplanes, serial
numbers 50001 and subsequent with an
original airworthiness certificate or original
export certificate of airworthiness issued on
or before February 3, 2022.
(2) Model BD–500–1A11 airplanes, serial
numbers 55001 and subsequent with an
original airworthiness certificate or original
export certificate of airworthiness issued on
or before February 3, 2022.
(d) Subject
Air Transport Association (ATA) of
America Code 05, Time Limits/Maintenance
Checks.
(e) Reason
This AD was prompted by a determination
that new or more restrictive airworthiness
limitations are necessary. The FAA is issuing
this AD to address reduced structural
integrity of the airplane or reduced
controllability of the airplane.
(f) Compliance
Comply with this AD within the
compliance times specified, unless already
done.
(g) Retained Revision of the Existing
Maintenance or Inspection Program, With a
New Terminating Action
This paragraph restates the requirements of
paragraph (g) of AD 2021–04–05, with a new
terminating action. For airplanes with an
original airworthiness certificate or original
PO 00000
Frm 00008
Fmt 4702
Sfmt 4702
export certificate of airworthiness issued on
or before June 18, 2020: Within 90 days after
March 30, 2021 (the effective date of AD
2021–04–05), revise the existing maintenance
or inspection program, as applicable, to
incorporate the information specified in
Airbus Canada Limited Partnership A220
Airworthiness Limitations, BD500–3AB48–
11400–02, Issue 011.00, dated June 18, 2020.
The initial compliance time for doing the
tasks is at the time specified in Airbus
Canada Limited Partnership A220
Airworthiness Limitations, BD500–3AB48–
11400–02, Issue 011.00, dated June 18, 2020,
or within 90 days after March 30, 2021,
whichever occurs later. Accomplishing the
revision of the existing maintenance or
inspection program required by paragraph (i)
of this AD terminates the requirements of this
paragraph for Sections 01, ‘‘Airworthiness
limitations—Introduction;’’ 02, ‘‘Certification
maintenance requirements—General;’’ 04,
‘‘ALI structural inspections—General;’’ 05,
‘‘Life limited parts (systems)—General;’’ 06,
‘‘Life limited parts (structures)—General;’’
07, ‘‘Fuel system limitations—General;’’ 08,
‘‘Critical design configuration control
limitations—General;’’ 09, ‘‘Power plant
limitations—General;’’ 10, ‘‘Structural repair
limitations—General;’’ and 11, ‘‘Limit of
validity—General;’’ of Airbus Canada
Limited Partnership A220 Airworthiness
Limitations, BD500–3AB48–11400–02, Issue
011.00, dated June 18, 2020, only.
(h) Retained No Alternative Actions,
Intervals, or Critical Design Configuration
Control Limitations (CDCCLs), With a New
Exception
This paragraph restates the requirements of
paragraph (h) of AD 2021–04–05, with a new
exception. Except as required by paragraph
(i) of this AD, after the existing maintenance
or inspection program has been revised as
required by paragraph (g) of this AD, no
alternative actions (e.g., inspections),
intervals, or CDCCLs may be used unless the
actions, intervals, and CDCCLs are approved
as an alternative method of compliance
(AMOC) in accordance with the procedures
specified in paragraph (k)(1) of this AD.
(i) New Maintenance or Inspection Program
Revision
Within 90 days after the effective date of
this AD, revise the existing maintenance or
inspection program, as applicable, to
incorporate the information specified in
Sections 01, ‘‘Airworthiness limitations—
Introduction;’’ 02, ‘‘Certification maintenance
requirements—General;’’ 04, ‘‘ALI structural
inspections—General;’’ 05, ‘‘Life limited
parts—General;’’ 06, ‘‘Fuel system
limitations—General;’’ 07, ‘‘Critical design
configuration control limitations—General;’’
08, ‘‘Power plant limitations—General;’’ 09,
‘‘Structural repair limitations—General;’’ and
10, ‘‘Limit of validity—General;’’ inclusive of
Airbus Canada Limited Partnership A220
Airworthiness Limitations, BD500–3AB48–
11400–02, Issue 014.00, dated February 3,
2022. The initial compliance time for doing
the tasks is at the time specified in Airbus
Canada Limited Partnership A220
Airworthiness Limitations, BD500–3AB48–
11400–02, Issue 014.00, dated February 3,
E:\FR\FM\31OCP1.SGM
31OCP1
Federal Register / Vol. 87, No. 209 / Monday, October 31, 2022 / Proposed Rules
2022, or within 90 days after the effective
date of this AD, whichever occurs later.
Accomplishing the revision of the existing
maintenance or inspection program required
by this paragraph terminates the actions
required by paragraph (g) of this AD for
Sections 01, ‘‘Airworthiness limitations—
Introduction;’’ 02, ‘‘Certification maintenance
requirements—General;’’ 04, ‘‘ALI structural
inspections—General;’’ 05, ‘‘Life limited
parts (systems)—General;’’ 06, ‘‘Life limited
parts (structures)—General;’’ 07, ‘‘Fuel
system limitations—General;’’ 08, ‘‘Critical
design configuration control limitations—
General;’’ 09, ‘‘Power plant limitations—
General;’’ 10, ‘‘Structural repair limitations—
General;’’ and 11, ‘‘Limit of validity—
General;’’ of Airbus Canada Limited
Partnership A220 Airworthiness Limitations,
BD500–3AB48–11400–02, Issue 011.00,
dated June 18, 2020, only.
khammond on DSKJM1Z7X2PROD with PROPOSALS
(j) New No Alternative Actions, Intervals, or
CDCCLs
After the existing maintenance or
inspection program has been revised as
required by paragraph (i) of this AD, no
alternative actions (e.g., inspections),
intervals, or CDCCLs may be used unless the
actions, intervals, and CDCCLs are approved
as an AMOC in accordance with the
procedures specified in paragraph (k)(1) of
this AD.
(k) Additional AD Provisions
The following provisions also apply to this
AD:
(1) Alternative Methods of Compliance
(AMOCs): The Manager, New York ACO
Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the
procedures found in 14 CFR 39.19. In
accordance with 14 CFR 39.19, send your
request to your principal inspector or
responsible Flight Standards Office, as
appropriate. If sending information directly
to the manager of the certification office,
send it to ATTN: Program Manager,
Continuing Operational Safety, FAA, New
York ACO Branch, 1600 Stewart Avenue,
Suite 410, Westbury, NY 11590; telephone
516–228–7300. Before using any approved
AMOC, notify your appropriate principal
inspector, or lacking a principal inspector,
the manager of the responsible Flight
Standards Office.
(2) Contacting the Manufacturer: For any
requirement in this AD to obtain instructions
from a manufacturer, the instructions must
be accomplished using a method approved
by the Manager, New York ACO Branch,
FAA; or Transport Canada Civil Aviation
(TCCA); or Airbus Canada Limited
Partnership’s TCCA Design Approval
Organization (DAO). If approved by the DAO,
the approval must include the DAOauthorized signature.
(l) Additional Information
(1) Refer to TCCA AD CF–2022–18, dated
April 14, 2022, for related information. This
TCCA AD may be found in the AD docket
regulations.gov by searching for and locating
Docket No. FAA–2022–1308.
(2) For more information about this AD,
contact Gabriel Kim, Aerospace Engineer,
Airframe and Propulsion Section, FAA, New
VerDate Sep<11>2014
16:52 Oct 28, 2022
Jkt 259001
York ACO Branch, 1600 Stewart Avenue,
Suite 410, Westbury, NY 11590; telephone
516–228–7300; email 9-avs-nyaco-cos@
faa.gov.
(m) Material Incorporated by Reference
(1) The Director of the Federal Register
approved the incorporation by reference
(IBR) of the service information listed in this
paragraph under 5 U.S.C. 552(a) and 1 CFR
part 51.
(2) You must use this service information
as applicable to do the actions required by
this AD, unless this AD specifies otherwise.
(3) The following service information was
approved for IBR on December 5, 2022.
(i) Airbus Canada Limited Partnership
A220 Airworthiness Limitations, BD500–
3AB48–11400–02, Issue 014.00, dated
February 3, 2022.
(ii) [Reserved]
(4) The following service information was
approved for IBR on March 30, 2021 (86 FR
10799, February 23, 2021).
(i) Airbus Canada Limited Partnership
A220 Airworthiness Limitations, BD500–
3AB48–11400–02, Issue 011.00, dated June
18, 2020.
(ii) [Reserved]
(5) For service information identified in
this AD, contact Airbus Canada Limited
Partnership, 13100 Henri-Fabre Boulevard,
Mirabel, Que´bec J7N 3C6, Canada; telephone
450–476–7676; email a220_crc@abc.airbus;
website a220world.airbus.com.
(6) You may view this service information
at the FAA, Airworthiness Products Section,
Operational Safety Branch, 2200 South 216th
St., Des Moines, WA. For information on the
availability of this material at the FAA, call
206–231–3195.
(7) You may view this service information
that is incorporated by reference at the
National Archives and Records
Administration (NARA). For information on
the availability of this material at NARA,
email fr.inspection@nara.gov, or go to:
www.archives.gov/federal-register/cfr/ibrlocations.html.
Issued on October 17, 2022.
Ross Landes,
Deputy Director for Regulatory Operations,
Compliance & Airworthiness Division,
Aircraft Certification Service.
[FR Doc. 2022–23012 Filed 10–28–22; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2022–1313; Project
Identifier MCAI–2021–01418–T]
RIN 2120–AA64
Airworthiness Directives; BAE
Systems (Operations) Limited
Airplanes
Federal Aviation
Administration (FAA), DOT.
AGENCY:
PO 00000
Frm 00009
Fmt 4702
Sfmt 4702
65541
Notice of proposed rulemaking
(NPRM).
ACTION:
The FAA proposes to
supersede Airworthiness Directive (AD)
99–25–11, which applies to certain BAE
Systems (Operations) Limited Model
BAe 146 and Avro 146–RJ series
airplanes. AD 99–25–11 requires
repetitive inspections for cracks along
the face of the retraction attachment
boss in the nose landing gear (NLG)
sidewall; and corrective action, if
necessary. Since the FAA issued AD 99–
25–11, additional cracking was found
that indicated additional airplanes are
subject to the unsafe condition. This
proposed AD would continue to require
the actions in AD 99–25–11, and expand
the applicability. The FAA is proposing
this AD to address the unsafe condition
on these products.
DATES: The FAA must receive comments
on this proposed AD by December 15,
2022.
ADDRESSES: You may send comments,
using the procedures found in 14 CFR
11.43 and 11.45, by any of the following
methods:
• Federal eRulemaking Portal: Go to
regulations.gov. Follow the instructions
for submitting comments.
• Fax: 202–493–2251.
• Mail: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE,
Washington, DC 20590.
• Hand Delivery: Deliver to Mail
address above between 9 a.m. and 5
p.m., Monday through Friday, except
Federal holidays.
For service information identified in
this NPRM, contact BAE Systems
(Operations) Limited, Customer
Information Department, Prestwick
International Airport, Ayrshire, KA9
2RW, Scotland, United Kingdom;
telephone +44 1292 675207; fax +44
1292 675704; email RApublications@
baesystems.com; website
baesystems.com/Businesses/
RegionalAircraft/index.htm. You may
view this service information at the
FAA, Airworthiness Products Section,
Operational Safety Branch, 2200 South
216th St., Des Moines, WA. For
information on the availability of this
material at the FAA, call 206–231–3195.
SUMMARY:
Examining the AD Docket
You may examine the AD docket at
regulations.gov by searching for and
locating Docket No. FAA–2022–1313; or
in person at Docket Operations between
9 a.m. and 5 p.m., Monday through
Friday, except Federal holidays. The AD
docket contains this NPRM, the
mandatory continuing airworthiness
E:\FR\FM\31OCP1.SGM
31OCP1
Agencies
[Federal Register Volume 87, Number 209 (Monday, October 31, 2022)]
[Proposed Rules]
[Pages 65538-65541]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23012]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2022-1308; Project Identifier MCAI-2022-00532-T]
RIN 2120-AA64
Airworthiness Directives; Airbus Canada Limited Partnership (Type
Certificate Previously Held by C Series Aircraft Limited Partnership
(CSALP); Bombardier, Inc.) Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Notice of proposed rulemaking (NPRM).
-----------------------------------------------------------------------
SUMMARY: The FAA proposes to supersede Airworthiness Directive (AD)
2021-04-05, which applies to certain Airbus Canada Limited Partnership
Model BD-500-1A10 and BD-500-1A11 airplanes. AD 2021-04-05 requires
revising the existing maintenance or inspection program, as applicable,
to incorporate new or more restrictive airworthiness limitations. Since
the FAA issued AD 2021-04-05, the FAA has determined that new or more
restrictive airworthiness limitations are necessary. This proposed AD
would continue to require the actions in AD 2021-04-05 and require
revising the existing maintenance or inspection program, as applicable,
to incorporate new or more restrictive airworthiness limitations. The
FAA is proposing this AD to address the unsafe condition on these
products.
DATES: The FAA must receive comments on this proposed AD by December
15, 2022.
ADDRESSES: You may send comments, using the procedures found in 14 CFR
11.43 and 11.45, by any of the following methods:
Federal eRulemaking Portal: Go to regulations.gov. Follow
the instructions for submitting comments.
Fax: 202-493-2251.
Mail: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE, Washington, DC 20590.
Hand Delivery: Deliver to Mail address above between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
AD Docket: You may examine the AD docket at regulations.gov under
Docket No. FAA-2022-1308; or in person at Docket Operations between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD
docket contains this NPRM, the mandatory continuing airworthiness
information (MCAI), any comments received, and other information. The
street address for Docket Operations is listed above.
Material Incorporated by Reference:
For service information identified in this NPRM, contact
Airbus Canada Limited Partnership, 13100 Henri-Fabre Boulevard,
Mirabel, Qu[eacute]bec J7N 3C6, Canada; telephone 450-476-7676; email
[email protected]; website a220world.airbus.com.
You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200 South
216th St., Des Moines, WA. For information on the availability of this
material at the FAA, call 206-231-3195.
FOR FURTHER INFORMATION CONTACT: Gabriel Kim, Aerospace Engineer,
Airframe and Propulsion Section, FAA, New York ACO Branch, 1600 Stewart
Avenue, Suite 410, Westbury, NY 11590; telephone 516-228-7300; email [email protected].
SUPPLEMENTARY INFORMATION:
Comments Invited
The FAA invites you to send any written relevant data, views, or
arguments about this proposal. Send your comments to an address listed
under ADDRESSES. Include ``Docket No. FAA-2022-1308; Project Identifier
MCAI-2022-00532-T'' at the beginning of your comments. The most helpful
comments reference a specific portion of the proposal, explain the
reason for any recommended change, and include supporting data. The FAA
will consider all comments received by the closing date and may amend
the proposal because of those comments.
Except for Confidential Business Information (CBI) as described in
the following paragraph, and other information as described in 14 CFR
11.35, the FAA will post all comments received, without change, to
regulations.gov, including any personal information you provide. The
agency will also post a report summarizing each substantive verbal
contact received about this NPRM.
Confidential Business Information
CBI is commercial or financial information that is both customarily
and actually treated as private by its owner. Under the Freedom of
Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public
disclosure. If your comments responsive to this NPRM contain commercial
or financial information that is customarily treated as private, that
you actually treat as
[[Page 65539]]
private, and that is relevant or responsive to this NPRM, it is
important that you clearly designate the submitted comments as CBI.
Please mark each page of your submission containing CBI as ``PROPIN.''
The FAA will treat such marked submissions as confidential under the
FOIA, and they will not be placed in the public docket of this NPRM.
Submissions containing CBI should be sent to Gabriel Kim, Aerospace
Engineer, Airframe and Propulsion Section, FAA, New York ACO Branch,
1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516-228-
7300; email [email protected]. Any commentary that the FAA
receives which is not specifically designated as CBI will be placed in
the public docket for this rulemaking.
Background
The FAA issued AD 2021-04-05, Amendment 39-21426 (86 FR 10799,
February 23, 2021) (AD 2021-04-05), which applies to certain Airbus
Canada Limited Partnership Model BD-500-1A10 and BD-500-1A11 airplanes.
AD 2021-04-05 requires revising the existing maintenance or inspection
program, as applicable, to incorporate new or more restrictive
airworthiness limitations. AD 2021-04-05 resulted from a determination
that new or more restrictive airworthiness limitations are necessary.
The FAA issued AD 2021-04-05 to address reduced structural integrity of
the airplane or reduced controllability of the airplane.
Actions Since AD 2021-04-05 Was Issued
Since the FAA issued AD 2021-04-05, the FAA has determined that new
or more restrictive airworthiness limitations are necessary
Transport Canada Civil Aviation (TCCA), which is the aviation
authority for Canada, has issued TCCA AD CF-2022-18, dated April 14,
2022 (TCCA AD CF-2022-18) (also referred to after this as the MCAI), to
correct an unsafe condition for certain Airbus Canada Limited
Partnership Model BD-500-1A10 and BD-500-1A11 airplanes. Airplanes with
an original airworthiness certificate or original export certificate of
airworthiness issued after February 3, 2022, must comply with the
airworthiness limitations specified as part of the approved type design
and referenced on the type certificate data sheet; this proposed AD
therefore does not include those airplanes in the applicability.
You may examine the MCAI in the AD docket at regulations.gov by
searching for and locating Docket No. FAA-2022-1308.
This proposed AD was prompted by a determination that new or more
restrictive airworthiness limitations are necessary. The FAA is
proposing this AD to address reduced structural integrity of the
airplane or reduced controllability of the airplane.
Related Service Information Under 1 CFR Part 51
Airbus Canada Limited Partnership has issued A220 Airworthiness
Limitations, BD500-3AB48-11400-02, Issue 014.00, dated February 3,
2022. This service information describes airworthiness limitations for
fuel tank systems, safe life limits, and certification maintenance
requirements.
This proposed AD would also require Airbus Canada Limited
Partnership A220 Airworthiness Limitations, BD500-3AB48-11400-02, Issue
011.00, dated June 18, 2020, which the Director of the Federal Register
approved for incorporation by reference as of March 30, 2021 (86 FR
10799, February 23, 2021).
This service information is reasonably available because the
interested parties have access to it through their normal course of
business or by the means identified in the ADDRESSES section.
FAA's Determination
This product has been approved by the aviation authority of another
country, and is approved for operation in the United States. Pursuant
to the FAA's bilateral agreement with the State of Design Authority,
the FAA has been notified of the unsafe condition described in the MCAI
and service information referenced above. The FAA is proposing this AD
because the FAA evaluated all the relevant information and determined
the unsafe condition described previously is likely to exist or develop
on other products of the same type design.
Proposed Requirements of This NPRM
This proposed AD would retain all of the requirements of AD 2021-
04-05. This proposed AD would require revising the existing maintenance
or inspection program, as applicable, to incorporate new or more
restrictive airworthiness limitations. Revising the existing
maintenance or inspection program as proposed in this AD would
terminate the retained requirements from AD 2021-04-05 in paragraph (g)
of this proposed AD, for Sections 01, ``Airworthiness limitations--
Introduction;'' 02, ``Certification maintenance requirements--
General;'' 04, ``ALI structural inspections--General;'' 05, ``Life
limited parts (systems)--General;'' 06, ``Life limited parts
(structures)--General;'' 07, ``Fuel system limitations--General;'' 08,
``Critical design configuration control limitations--General;'' 09,
``Power plant limitations--General;'' 10, ``Structural repair
limitations--General;'' and 11, ``Limit of validity--General;'' of
Airbus Canada Limited Partnership A220 Airworthiness Limitations,
BD500-3AB48-11400-02, Issue 011.00, dated June 18, 2020, only.
This proposed AD would require revisions to certain operator
maintenance documents to include new actions (e.g., inspections) and
Critical Design Configuration Control Limitations (CDCCLs). Compliance
with these actions and CDCCLs is required by 14 CFR 91.403(c). For
airplanes that have been previously modified, altered, or repaired in
the areas addressed by this proposed AD, the operator may not be able
to accomplish the actions described in the revisions. In this
situation, to comply with 14 CFR 91.403(c), the operator must request
approval for an alternative method of compliance according to paragraph
(k)(1) of this proposed AD.
Differences Between This Proposed AD and the MCAI
TCCA AD CF-2022-18 specifies to incorporate all sections of the
airworthiness limitations document. This proposed AD would not require
the incorporation of Section 03, ``Candidate CMR limitations--
General,'' of Airbus Canada Limited Partnership A220 Airworthiness
Limitations, BD500-3AB48-11400-02, Issue 014.00, dated February 3,
2022. However, this proposed AD would continue to require the
incorporation of Section 03, ``Candidate CMR limitations--General,'' of
Airbus Canada Limited Partnership A220 Airworthiness Limitations,
BD500-3AB48-11400-02, Issue 011.00, dated June 18, 2020.
Costs of Compliance
The FAA estimates that this proposed AD affects 70 airplanes of
U.S. registry. The FAA estimates the following costs to comply with
this proposed AD:
The FAA estimates the total cost per operator for the retained
actions from AD 2021-04-05 to be $7,650 (90 work-hours x $85 per work-
hour).
The FAA has determined that revising the maintenance or inspection
program takes an average of 90 work-hours per operator, although the
agency recognizes that this number may vary from operator to operator.
Since operators incorporate maintenance or inspection program changes
for their
[[Page 65540]]
affected fleet(s), the FAA has determined that a per-operator estimate
is more accurate than a per-airplane estimate. Therefore, the agency
estimates the average total cost per operator to be $7,650 (90 work-
hours x $85 per work-hour).
The FAA estimates the total cost per operator for the new proposed
actions to be $7,650 (90 work-hours x $85 per work-hour).
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: General requirements.
Under that section, Congress charges the FAA with promoting safe flight
of civil aircraft in air commerce by prescribing regulations for
practices, methods, and procedures the Administrator finds necessary
for safety in air commerce. This regulation is within the scope of that
authority because it addresses an unsafe condition that is likely to
exist or develop on products identified in this rulemaking action.
Regulatory Findings
The FAA determined that this proposed AD would not have federalism
implications under Executive Order 13132. This proposed AD would not
have a substantial direct effect on the States, on the relationship
between the national Government and the States, or on the distribution
of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify this proposed
regulation:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Would not affect intrastate aviation in Alaska, and
(3) Would not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Proposed Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by:
0
a. Removing Airworthiness Directive (AD) 2021-04-05, Amendment 39-21426
(86 FR 10799, February 23, 2021); and
0
b. Adding the following new AD:
Airbus Canada Limited Partnership (Type Certificate Previously Held
by C Series Aircraft Limited Partnership (CSALP); Bombardier, Inc.):
Docket No. FAA-2022-1308; Project Identifier MCAI-2022-00532-T.
(a) Comments Due Date
The FAA must receive comments on this airworthiness directive
(AD) by December 15, 2022.
(b) Affected ADs
This AD replaces AD 2021-04-05, Amendment 39-21426 (86 FR 10799,
February 23, 2021) (AD 2021-04-05).
(c) Applicability
This AD applies to Airbus Canada Limited Partnership airplanes,
certificated in any category, as identified in paragraphs (c)(1) and
(2) of this AD.
(1) Model BD-500-1A10 airplanes, serial numbers 50001 and
subsequent with an original airworthiness certificate or original
export certificate of airworthiness issued on or before February 3,
2022.
(2) Model BD-500-1A11 airplanes, serial numbers 55001 and
subsequent with an original airworthiness certificate or original
export certificate of airworthiness issued on or before February 3,
2022.
(d) Subject
Air Transport Association (ATA) of America Code 05, Time Limits/
Maintenance Checks.
(e) Reason
This AD was prompted by a determination that new or more
restrictive airworthiness limitations are necessary. The FAA is
issuing this AD to address reduced structural integrity of the
airplane or reduced controllability of the airplane.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Retained Revision of the Existing Maintenance or Inspection
Program, With a New Terminating Action
This paragraph restates the requirements of paragraph (g) of AD
2021-04-05, with a new terminating action. For airplanes with an
original airworthiness certificate or original export certificate of
airworthiness issued on or before June 18, 2020: Within 90 days
after March 30, 2021 (the effective date of AD 2021-04-05), revise
the existing maintenance or inspection program, as applicable, to
incorporate the information specified in Airbus Canada Limited
Partnership A220 Airworthiness Limitations, BD500-3AB48-11400-02,
Issue 011.00, dated June 18, 2020. The initial compliance time for
doing the tasks is at the time specified in Airbus Canada Limited
Partnership A220 Airworthiness Limitations, BD500-3AB48-11400-02,
Issue 011.00, dated June 18, 2020, or within 90 days after March 30,
2021, whichever occurs later. Accomplishing the revision of the
existing maintenance or inspection program required by paragraph (i)
of this AD terminates the requirements of this paragraph for
Sections 01, ``Airworthiness limitations--Introduction;'' 02,
``Certification maintenance requirements--General;'' 04, ``ALI
structural inspections--General;'' 05, ``Life limited parts
(systems)--General;'' 06, ``Life limited parts (structures)--
General;'' 07, ``Fuel system limitations--General;'' 08, ``Critical
design configuration control limitations--General;'' 09, ``Power
plant limitations--General;'' 10, ``Structural repair limitations--
General;'' and 11, ``Limit of validity--General;'' of Airbus Canada
Limited Partnership A220 Airworthiness Limitations, BD500-3AB48-
11400-02, Issue 011.00, dated June 18, 2020, only.
(h) Retained No Alternative Actions, Intervals, or Critical Design
Configuration Control Limitations (CDCCLs), With a New Exception
This paragraph restates the requirements of paragraph (h) of AD
2021-04-05, with a new exception. Except as required by paragraph
(i) of this AD, after the existing maintenance or inspection program
has been revised as required by paragraph (g) of this AD, no
alternative actions (e.g., inspections), intervals, or CDCCLs may be
used unless the actions, intervals, and CDCCLs are approved as an
alternative method of compliance (AMOC) in accordance with the
procedures specified in paragraph (k)(1) of this AD.
(i) New Maintenance or Inspection Program Revision
Within 90 days after the effective date of this AD, revise the
existing maintenance or inspection program, as applicable, to
incorporate the information specified in Sections 01,
``Airworthiness limitations--Introduction;'' 02, ``Certification
maintenance requirements--General;'' 04, ``ALI structural
inspections--General;'' 05, ``Life limited parts--General;'' 06,
``Fuel system limitations--General;'' 07, ``Critical design
configuration control limitations--General;'' 08, ``Power plant
limitations--General;'' 09, ``Structural repair limitations--
General;'' and 10, ``Limit of validity--General;'' inclusive of
Airbus Canada Limited Partnership A220 Airworthiness Limitations,
BD500-3AB48-11400-02, Issue 014.00, dated February 3, 2022. The
initial compliance time for doing the tasks is at the time specified
in Airbus Canada Limited Partnership A220 Airworthiness Limitations,
BD500-3AB48-11400-02, Issue 014.00, dated February 3,
[[Page 65541]]
2022, or within 90 days after the effective date of this AD,
whichever occurs later. Accomplishing the revision of the existing
maintenance or inspection program required by this paragraph
terminates the actions required by paragraph (g) of this AD for
Sections 01, ``Airworthiness limitations--Introduction;'' 02,
``Certification maintenance requirements--General;'' 04, ``ALI
structural inspections--General;'' 05, ``Life limited parts
(systems)--General;'' 06, ``Life limited parts (structures)--
General;'' 07, ``Fuel system limitations--General;'' 08, ``Critical
design configuration control limitations--General;'' 09, ``Power
plant limitations--General;'' 10, ``Structural repair limitations--
General;'' and 11, ``Limit of validity--General;'' of Airbus Canada
Limited Partnership A220 Airworthiness Limitations, BD500-3AB48-
11400-02, Issue 011.00, dated June 18, 2020, only.
(j) New No Alternative Actions, Intervals, or CDCCLs
After the existing maintenance or inspection program has been
revised as required by paragraph (i) of this AD, no alternative
actions (e.g., inspections), intervals, or CDCCLs may be used unless
the actions, intervals, and CDCCLs are approved as an AMOC in
accordance with the procedures specified in paragraph (k)(1) of this
AD.
(k) Additional AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, New
York ACO Branch, FAA, has the authority to approve AMOCs for this
AD, if requested using the procedures found in 14 CFR 39.19. In
accordance with 14 CFR 39.19, send your request to your principal
inspector or responsible Flight Standards Office, as appropriate. If
sending information directly to the manager of the certification
office, send it to ATTN: Program Manager, Continuing Operational
Safety, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410,
Westbury, NY 11590; telephone 516-228-7300. Before using any
approved AMOC, notify your appropriate principal inspector, or
lacking a principal inspector, the manager of the responsible Flight
Standards Office.
(2) Contacting the Manufacturer: For any requirement in this AD
to obtain instructions from a manufacturer, the instructions must be
accomplished using a method approved by the Manager, New York ACO
Branch, FAA; or Transport Canada Civil Aviation (TCCA); or Airbus
Canada Limited Partnership's TCCA Design Approval Organization
(DAO). If approved by the DAO, the approval must include the DAO-
authorized signature.
(l) Additional Information
(1) Refer to TCCA AD CF-2022-18, dated April 14, 2022, for
related information. This TCCA AD may be found in the AD docket
regulations.gov by searching for and locating Docket No. FAA-2022-
1308.
(2) For more information about this AD, contact Gabriel Kim,
Aerospace Engineer, Airframe and Propulsion Section, FAA, New York
ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590;
telephone 516-228-7300; email [email protected].
(m) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(3) The following service information was approved for IBR on
December 5, 2022.
(i) Airbus Canada Limited Partnership A220 Airworthiness
Limitations, BD500-3AB48-11400-02, Issue 014.00, dated February 3,
2022.
(ii) [Reserved]
(4) The following service information was approved for IBR on
March 30, 2021 (86 FR 10799, February 23, 2021).
(i) Airbus Canada Limited Partnership A220 Airworthiness
Limitations, BD500-3AB48-11400-02, Issue 011.00, dated June 18,
2020.
(ii) [Reserved]
(5) For service information identified in this AD, contact
Airbus Canada Limited Partnership, 13100 Henri-Fabre Boulevard,
Mirabel, Qu[eacute]bec J7N 3C6, Canada; telephone 450-476-7676;
email [email protected]; website a220world.airbus.com.
(6) You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200
South 216th St., Des Moines, WA. For information on the availability
of this material at the FAA, call 206-231-3195.
(7) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, email [email protected], or go to: www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued on October 17, 2022.
Ross Landes,
Deputy Director for Regulatory Operations, Compliance & Airworthiness
Division, Aircraft Certification Service.
[FR Doc. 2022-23012 Filed 10-28-22; 8:45 am]