Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 65052-65053 [2022-23412]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
65052
Federal Register / Vol. 87, No. 207 / Thursday, October 27, 2022 / Notices
Description: Compliance filing: MBR
Compliance Filing to be effective 3/7/
2022.
Filed Date: 10/21/22.
Accession Number: 20221021–5143.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER22–680–004.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment:
Second Amended WDAT Enhancements
to be effective 12/21/2022.
Filed Date: 10/21/22.
Accession Number: 20221021–5069.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–151–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA No. 4290, Queue
No. Y3–044/Y3–050/Y3–053 (amend) to
be effective 10/21/2015.
Filed Date: 10/20/22.
Accession Number: 20221020–5157.
Comment Date: 5 p.m. ET 11/10/22.
Docket Numbers: ER23–152–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Amendment to Interim Black Start
Agreement (RS 234) 2022 to be effective
12/20/2022.
Filed Date: 10/21/22.
Accession Number: 20221021–5000.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–153–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6657; Queue No. AF1–050 to be
effective 9/21/2022.
Filed Date: 10/21/22.
Accession Number: 20221021–5013.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–154–000.
Applicants: Carson Hybrid Energy
Center LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate
Authority to be effective 1/1/2023.
Filed Date: 10/21/22.
Accession Number: 20221021–5016.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–155–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 4028
Pixley Solar Energy & ITCGP Facilities
Service Agr to be effective 12/20/2022.
Filed Date: 10/21/22.
Accession Number: 20221021–5041.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–156–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
VerDate Sep<11>2014
16:55 Oct 26, 2022
Jkt 259001
6664; Queue No. AF1–083 to be
effective 9/21/2022.
Filed Date: 10/21/22.
Accession Number: 20221021–5043.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–157–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6198; Queue No. AE1–104 to be
effective 9/9/2021.
Filed Date: 10/21/22.
Accession Number: 20221021–5046.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–158–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
SCC_Attachment B and C to be effective
1/1/2023.
Filed Date: 10/21/22.
Accession Number: 20221021–5099.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–159–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
SCC_Joint Op. Agreement to be effective
1/1/2023.
Filed Date: 10/21/22.
Accession Number: 20221021–5100.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–160–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule Nos. 298 and 299, Navajo
Agreements to be effective 12/21/2022.
Filed Date: 10/21/22.
Accession Number: 20221021–5132.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–161–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
SCC_Cost-based Coord. Services to be
effective 1/1/2023.
Filed Date: 10/21/22.
Accession Number: 20221021–5152.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: ER23–162–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
Social Cost of Carbon_(2) to be effective
1/1/2023.
Filed Date: 10/21/22.
Accession Number: 20221021–5156.
Comment Date: 5 p.m. ET 11/14/22.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF23–85–000.
Applicants: Generate Capital, PBC.
Description: Form 556 of Generate
Capital, PBC.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Filed Date: 10/21/22.
Accession Number: 20221021–5083.
Comment Date: 5 p.m. ET 11/14/22.
Docket Numbers: QF23–86–000.
Applicants: Generate Capital, PBC.
Description: Form 556 of Generate
Capital, PBC [B].
Filed Date: 10/21/22.
Accession Number: 20221021–5086.
Comment Date: 5 p.m. ET 11/14/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–23416 Filed 10–26–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2634–092]
Great Lakes Hydro America, LLC;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Request for a
temporary amendment of reservoir
elevation and minimum required flow
releases.
b. Project No.: 2634–092.
c. Dates Filed: July 14 and September
22, 2022.
d. Applicant: Great Lakes Hydro
America, LLC.
e. Name of Project: Storage Project.
f. Location: The project is located on
the South and West branches of the
Penobscot River and its tributaries in
E:\FR\FM\27OCN1.SGM
27OCN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 207 / Thursday, October 27, 2022 / Notices
Somerset and Piscataquis counties,
Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Kevin
Bernier, Great Lakes Hydro America,
LLC, 1024 Central Street, Millinocket
ME, 04462, (207) 951–5006.
i. FERC Contact: Mr. Steven Sachs,
(202) 502–8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
any filing should include docket
number P–2634–092.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Request: The
applicant requests a temporary
amendment of its normal water level
management and flow release
requirements at the Ragged Lake
development of its Storage Project.
Rather than maintaining as high a water
level as possible through July 15 and
gradually drawing down the reservoir
until winter, the applicant is
maintaining Ragged Lake at an elevation
of approximately 1,115.5 feet U.S.
Geological Survey datum or 19.5 feet
below the full pond elevation at the dam
VerDate Sep<11>2014
16:55 Oct 26, 2022
Jkt 259001
beginning on April 27, 2022.
Furthermore, instead of drawing on
reservoir storage to provide for elevated
required flow releases through the
summer and early autumn, the
applicant is maintaining run-of-river
operation, in which outflow is equal to
inflow. The applicant states the
temporary amendment is necessary to
alleviate dam safety concerns and
expects to continue the modified
operation until the winter of 2022–2023.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions To Intervene,
or Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number(s) of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person intervening or
protesting; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
65053
proceeding, in accordance with 18 CFR
385.2010.
Dated: October 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–23412 Filed 10–26–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–461–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Availability
of the Draft Environmental Impact
Statement for the Proposed Southside
Reliability Enhancement Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Southside Reliability
Enhancement Project (Project), proposed
by Transcontinental Gas Pipe Line
Company, LLC (Transco) in the abovereferenced docket. Transco requests
authorization to construct and operate
one new compressor station and modify
two existing compressor stations and
three existing meter stations in North
Carolina and Virginia. The Project
would provide an incremental 423,400
dekatherms per day (Dth/d) of yearround firm transportation capacity from
Transco’s Compressor Station 165 and
the Pine Needle Storage Facility along
the mainline pipeline system to delivery
points in North Carolina.
The draft EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA).
FERC staff concludes that approval of
the proposed Project, with the
mitigation measures recommended in
the EIS, would result in some adverse
environmental impacts; however,
impacts would be reduced to less-thansignificant levels. Regarding climate
change impacts, the Project’s
construction and operation emissions
would increase the atmospheric
concentration of greenhouse gases
(GHG), in combination with past,
present, and future emissions from all
other sources. Climate change impacts
are not characterized in the EIS as
significant or insignificant because the
Commission is conducting a generic
proceeding to determine whether and
how the Commission will conduct
significance determinations going
E:\FR\FM\27OCN1.SGM
27OCN1
Agencies
[Federal Register Volume 87, Number 207 (Thursday, October 27, 2022)]
[Notices]
[Pages 65052-65053]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23412]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2634-092]
Great Lakes Hydro America, LLC; Notice of Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Request for a temporary amendment of
reservoir elevation and minimum required flow releases.
b. Project No.: 2634-092.
c. Dates Filed: July 14 and September 22, 2022.
d. Applicant: Great Lakes Hydro America, LLC.
e. Name of Project: Storage Project.
f. Location: The project is located on the South and West branches
of the Penobscot River and its tributaries in
[[Page 65053]]
Somerset and Piscataquis counties, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Kevin Bernier, Great Lakes Hydro America,
LLC, 1024 Central Street, Millinocket ME, 04462, (207) 951-5006.
i. FERC Contact: Mr. Steven Sachs, (202) 502-8666,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. The first page of any filing should
include docket number P-2634-092.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Request: The applicant requests a temporary
amendment of its normal water level management and flow release
requirements at the Ragged Lake development of its Storage Project.
Rather than maintaining as high a water level as possible through July
15 and gradually drawing down the reservoir until winter, the applicant
is maintaining Ragged Lake at an elevation of approximately 1,115.5
feet U.S. Geological Survey datum or 19.5 feet below the full pond
elevation at the dam beginning on April 27, 2022. Furthermore, instead
of drawing on reservoir storage to provide for elevated required flow
releases through the summer and early autumn, the applicant is
maintaining run-of-river operation, in which outflow is equal to
inflow. The applicant states the temporary amendment is necessary to
alleviate dam safety concerns and expects to continue the modified
operation until the winter of 2022-2023.
l. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Motions To Intervene, or Protests: Anyone may submit
comments, a motion to intervene, or a protest in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, motions to
intervene, or protests must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``MOTION TO
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading
the name of the applicant and the project number(s) of the application
to which the filing responds; (3) furnish the name, address, and
telephone number of the person intervening or protesting; and (4)
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. All comments, motions to intervene, or protests must set
forth their evidentiary basis. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Dated: October 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-23412 Filed 10-26-22; 8:45 am]
BILLING CODE 6717-01-P