Columbia Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed Coco B Wells Replacement Project, 64786-64787 [2022-23296]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 64786 Federal Register / Vol. 87, No. 206 / Wednesday, October 26, 2022 / Notices would raise and lower the Obermeyer gates to match inflows more closely during high flow events. The applicant would perform all work to install the Obermeyer gates behind a bulkhead that would be anchored on the upstream side of the dam. The Obermeyer gate installation is expected to last 18 to 24 months. This proposed action does not require a drawdown of Goat Rock Lake. The applicant proposes laydown areas in previously disturbed areas and to construct a temporary pier/platform for equipment. During construction and following the Obermeyer gate installation, the licensee would operate the Goat Rock Lake and powerhouse within the current project license range of 398–404 feet. The applicant states that the proposal does not change any of the project features or operations. The project will continue to operate under the terms of its current license and applicable Water Quality Certification. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/esubscription. asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the VerDate Sep<11>2014 17:37 Oct 25, 2022 Jkt 259001 application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: October 20, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–23278 Filed 10–25–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–227–000] Columbia Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed Coco B Wells Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Coco B Wells Replacement Project, proposed by Columbia Gas Transmission, LLC (Columbia) in the above-referenced docket. Columbia requests authorization to construct and operate two new Injection and Withdrawal Wells (I/W) wells and related pipeline and appurtenances in a new well pad, and plug and abandon four I/W wells and related pipeline and appurtenances within the Coco B Storage Field in Kanawha County, West Virginia. The EA assesses the potential environmental effects of the construction and operation of the Coco B Wells Replacement Project in accordance with the requirements of the National Environmental Policy Act. The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The proposed Coco B Wells Replacement Project includes the following facilities: • construct and operate two new I/W wells on a new well pad; PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 • construct 586 feet of related pipeline and appurtenances; • plug and abandon four I/W wells; • abandon by removal 251 feet of pipeline and appurtenances; and • plug and abandon in place 4,927 feet of pipeline. The Commission mailed a copy of the Notice of Availability of the EA to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The EA is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the natural gas environmental documents page (https:// www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the EA may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https://elibrary.ferc.gov/ eLibrary/search), select ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field, excluding the last three digits (i.e., CP22–227). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The EA is not a decision document. It presents Commission staff’s independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the EA’s disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on November 21, 2022. For your convenience, there are three methods you can use to file your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. E:\FR\FM\26OCN1.SGM 26OCN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 206 / Wednesday, October 26, 2022 / Notices (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP22–227–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. At this point in this proceeding, the timeframe for filing timely intervention requests has expired. Any person seeking to become a party to the proceeding must file a motion to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission’s Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and show good cause why the time limitation should be waived. Motions to intervene are more fully described at https://www.ferc.gov/how-intervene. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings VerDate Sep<11>2014 17:37 Oct 25, 2022 Jkt 259001 by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: October 20, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–23296 Filed 10–25–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI22–7–000] Scott Sanicki; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI22–7–000. c. Date Filed: May 2, 2022. d. Applicant: Scott Sanicki. e. Name of Project: Quiet Woods Water Wheel Project. f. Location: The proposed project would be located on Pocotopaug Creek in East Hampton, Middlesex County, Connecticut. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Scott Sanicki; 102 Quiet Woods Road, East Hampton, CT 06424; telephone: (860) 267–2759; email: ssanicki@comcast.net. i. FERC Contact: Ashish Desai, (202) 502–8370, or Ashish.Desai@ferc.gov. j. Deadline for filing comments, protests, and motions to intervene is November 21, 2022. The Commission strongly encourages electronic filing. Please file comments, protests, and motions to intervene using the Commission’s eFiling at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 64787 addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number DI22–7–000. Comments emailed to Commission staff are not considered part of the Commission record. k. Description of Project: The proposed Quiet Woods Water Wheel Project would consist of: (1) an approximately three to six-foot-diameter under shot poncelet water wheel and approximately two-kilowatt generator cantilevered to a concrete mount on the creek bank; (2) a 100-foot transmission line to a private residence; and (3) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the project would affect the interests of interstate or foreign commerce. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/esubscription. asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must bear in all E:\FR\FM\26OCN1.SGM 26OCN1

Agencies

[Federal Register Volume 87, Number 206 (Wednesday, October 26, 2022)]
[Notices]
[Pages 64786-64787]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23296]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP22-227-000]


Columbia Gas Transmission, LLC; Notice of Availability of the 
Environmental Assessment for the Proposed Coco B Wells Replacement 
Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the Coco 
B Wells Replacement Project, proposed by Columbia Gas Transmission, LLC 
(Columbia) in the above-referenced docket. Columbia requests 
authorization to construct and operate two new Injection and Withdrawal 
Wells (I/W) wells and related pipeline and appurtenances in a new well 
pad, and plug and abandon four I/W wells and related pipeline and 
appurtenances within the Coco B Storage Field in Kanawha County, West 
Virginia.
    The EA assesses the potential environmental effects of the 
construction and operation of the Coco B Wells Replacement Project in 
accordance with the requirements of the National Environmental Policy 
Act. The FERC staff concludes that approval of the proposed project, 
with appropriate mitigating measures, would not constitute a major 
federal action significantly affecting the quality of the human 
environment.
    The proposed Coco B Wells Replacement Project includes the 
following facilities:
     construct and operate two new I/W wells on a new well pad;
     construct 586 feet of related pipeline and appurtenances;
     plug and abandon four I/W wells;
     abandon by removal 251 feet of pipeline and appurtenances; 
and
     plug and abandon in place 4,927 feet of pipeline.
    The Commission mailed a copy of the Notice of Availability of the 
EA to federal, state, and local government representatives and 
agencies; elected officials; environmental and public interest groups; 
Native American tribes; potentially affected landowners and other 
interested individuals and groups; and newspapers and libraries in the 
project area. The EA is only available in electronic format. It may be 
viewed and downloaded from the FERC's website (www.ferc.gov), on the 
natural gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In 
addition, the EA may be accessed by using the eLibrary link on the 
FERC's website. Click on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search), select ``General Search'' and enter the docket number 
in the ``Docket Number'' field, excluding the last three digits (i.e., 
CP22-227). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    The EA is not a decision document. It presents Commission staff's 
independent analysis of the environmental issues for the Commission to 
consider when addressing the merits of all issues in this proceeding. 
Any person wishing to comment on the EA may do so. Your comments should 
focus on the EA's disclosure and discussion of potential environmental 
effects, reasonable alternatives, and measures to avoid or lessen 
environmental impacts. The more specific your comments, the more useful 
they will be. To ensure that the Commission has the opportunity to 
consider your comments prior to making its decision on this project, it 
is important that we receive your comments in Washington, DC on or 
before 5:00 p.m. Eastern Time on November 21, 2022.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.

[[Page 64787]]

    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
FERC Online. This is an easy method for submitting brief, text-only 
comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's website (www.ferc.gov) under the 
link to FERC Online. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP22-
227-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, MD 20852.
    Filing environmental comments will not give you intervenor status, 
but you do not need intervenor status to have your comments considered. 
Only intervenors have the right to seek rehearing or judicial review of 
the Commission's decision. At this point in this proceeding, the 
timeframe for filing timely intervention requests has expired. Any 
person seeking to become a party to the proceeding must file a motion 
to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the 
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and 
(d)) and show good cause why the time limitation should be waived. 
Motions to intervene are more fully described at https://www.ferc.gov/how-intervene.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link 
also provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/ferc-online/overview to 
register for eSubscription.

    Dated: October 20, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-23296 Filed 10-25-22; 8:45 am]
BILLING CODE 6717-01-P