East Tennessee Natural Gas, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned System Alignment Program Project, 64473-64477 [2022-23171]
Download as PDF
Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices
Applicants: Waters Rd S, LLC, Waters
Rd N, LLC, Wakefield Solar Fund, LLC,
USS New Scotland 1 LLC, Turin Solar
Fund, LLC, Tri-County Solar Fund 1,
LLC, Tri-County Solar Fund 1, LLC, TriCounty Solar Fund 1, LLC, Mtn Solar 5
LLC, Mtn Solar 4 LLC, Mtn Solar 2 LLC,
Mtn Solar 1 LLC,ECA Maine BET,
LLC,CO LI CSG 3 LLC,CO LI CSG 1 LLC,
Burrillville Solar, LLC.
Description: Refund Reports of
Burrillville Solar, LLC, et al.
Filed Date: 10/18/22.
Accession Number: 20221018–5159.
Comment Date: 5 p.m. ET 11/8/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 19, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–23175 Filed 10–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF22–8–000]
khammond on DSKJM1Z7X2PROD with NOTICES
East Tennessee Natural Gas, LLC;
Notice of Scoping Period Requesting
Comments on Environmental Issues
for the Planned System Alignment
Program Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document that will
discuss the environmental impacts of
the System Alignment Program Project
involving construction and operation of
facilities by East Tennessee Natural Gas,
LLC (ETNG) in Knox, Jefferson, and
Sevier Counties, Tennessee;
Rockingham County, North Carolina;
VerDate Sep<11>2014
16:52 Oct 24, 2022
Jkt 259001
and Washington and Wythe Counties,
Virginia. ETNG would also complete a
hydrotest of an approximately 1.2-mile
segment of existing pipeline in Patrick
County, Virginia. The Commission will
use this environmental document in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
November 18, 2022. Comments may be
submitted in written or oral form.
Further details on how to submit
comments are provided in the Public
Participation section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written or oral comments
during the preparation of the
environmental document.
If you submitted comments on this
project to the Commission before the
opening of this docket on June 16, 2022,
you will need to file those comments in
Docket No. PF22–8–000 to ensure they
are considered.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
64473
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not subsequently
grant, exercise, or oversee the exercise
of that eminent domain authority. The
courts have exclusive authority to
handle eminent domain cases; the
Commission has no jurisdiction over
these matters.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses typically asked
questions, including the use of eminent
domain and how to participate in the
Commission’s proceedings. This fact
sheet along with other landowner topics
of interest are available for viewing on
the FERC website (www.ferc.gov) under
the links to Natural Gas Questions or
Landowner Topics.
Public Participation
There are four methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
E:\FR\FM\25OCN1.SGM
25OCN1
64474
Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (PF22–8–000) on
your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852; or
(4) In lieu of sending written
comments, the Commission invites you
to attend one of the public scoping
session(s) its staff will conduct. A
schedule of the scoping meeting dates,
times, and locations (if applicable) will
be issued in a separate notice at least
two weeks prior to the date of the
meeting(s).
It is important to note that the
Commission provides equal
consideration to all comments received,
whether filed in written form or
provided orally scoping session.
Additionally, the Commission offers a
free service called eSubscription, which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Summary of the Planned Project
The project involves the installation
of facilities to enhance the physical, bidirectional flow capability on ETNG’s
Line 3300–1. ETNG plans to construct
approximately 16.2 miles of 24-inchdiameter pipeline loop 1 (Boyds Creek
Loop) adjacent to its existing 16-inchdiameter pipeline in Knox and Sevier
Counties, Tennessee; a new 6,000horsepower compressor station (the
Talbot Compressor Station) in Jefferson
County, Tennessee; a new 19,000horsepower compressor station in
Rockingham County, North Carolina
(the Draper Compressor Station); and
ancillary facilities in Knox County and
Sevier Counties, Tennessee and
Washington and Wythe Counties,
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline.
VerDate Sep<11>2014
16:52 Oct 24, 2022
Jkt 259001
Virginia. ETNG would also replace
approximately 6.5 miles of 8-inchdiameter pipeline with new 24-inchdiameter pipeline within its existing
right-of-way in Washington County,
Virginia and complete a hydrotest of an
approximately 1.2 mile-segment of
existing pipeline in Patrick County,
Virginia.
ETNG states that the purpose of the
planned project is to improve the
operational reliability of its system by
minimizing the amount of displacement
in the system design to meet customers’
shifting needs. Specifically, ETNG states
that with the existing system design,
delivery of nominated quantities of
natural gas from west-to-east and eastto-west relies upon customers’
nominations of sufficient quantities in
the opposite direction. However,
changes in customer nominations have
increasingly challenged ETNG’s
operational ability to meet all of its firm
service obligations. Planned facilities
would provide existing service to
existing customers; ETNG would not
sell additional capacity as part of the
project.
The general location of the project
facilities is shown in appendix A.2
Land Requirements for Construction
Construction of the planned facilities
would disturb about 361.6 acres of land
for the aboveground facilities and
pipelines. Following construction,
ETNG would maintain about 35 acres
for permanent operation of the project’s
aboveground facilities; the remaining
acreage would be restored. The planned
Boyds Creek Loop is located within or
adjacent to ETNG’s existing Line 3300–
1 right-of-way for 14.3 miles
(approximately 88 percent of its total
length).
NEPA Process and the Environmental
Document
Any environmental document issued
by Commission staff will discuss
impacts that could occur as a result of
the construction and operation of the
planned project under the relevant
general resource areas:
• geology and soils;
• water resources and wetlands;
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’. For instructions on
connecting to eLibrary, refer to the last page of this
notice. At this time, the Commission has suspended
access to the Commission’s Public Reference Room
due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus
Disease (COVID–19), issued by the President on
March 13, 2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• socioeconomics and environmental
justice;
• air quality and noise;
• reliability and safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the planned
project or portions of the project and
make recommendations on how to
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate others from further
study and discussion in the
environmental document.
Although no formal application has
been filed, Commission staff have
already initiated a NEPA review under
the Commission’s pre-filing process.
The purpose of the pre-filing process is
to encourage early involvement of
interested stakeholders and to identify
and resolve issues before the
Commission receives an application. As
part of the pre-filing review,
Commission staff will contact federal
and state agencies to discuss their
involvement in the scoping process and
the preparation of the environmental
document.
If a formal application is filed,
Commission staff will then determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the
environmental issues. If Commission
staff prepares an EA, a Notice of
Schedule for the Preparation of an
Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
determination on the proposed project.
If Commission staff prepares an EIS, a
Notice of Intent to Prepare an EIS/
Notice of Schedule will be issued once
an application is filed, which will open
an additional public comment period.
Staff will then prepare a draft EIS that
will be issued for public comment.
Commission staff will consider all
timely comments received during the
comment period on the draft EIS, and
revise the document, as necessary,
before issuing a final EIS. Any EA or
draft and final EIS will be available in
electronic format in the public record
E:\FR\FM\25OCN1.SGM
25OCN1
Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices
through eLibrary 3 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues related to this
project to formally cooperate in the
preparation of the environmental
document.4 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.5
The environmental document for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
khammond on DSKJM1Z7X2PROD with NOTICES
3 For instructions on connecting to eLibrary, refer
to the last page of this notice.
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.8.
5 The Advisory Council on Historic Preservation
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
16:52 Oct 24, 2022
Jkt 259001
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the planned
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number PF22–8–000 in your
request. If you are requesting a change
to your address, please be sure to
include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Becoming an Intervenor
Once ETNG files its application with
the Commission, you may want to
become an ‘‘intervenor’’ which is an
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
64475
official party to the Commission’s
proceeding. Only intervenors have the
right to seek rehearing of the
Commission’s decision and be heard by
the courts if they choose to appeal the
Commission’s final ruling. An
intervenor formally participates in the
proceeding by filing a request to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Motions
to intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to.asp. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the project, after
which the Commission will issue a
public notice that establishes an
intervention deadline.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: October 19, 2022.
Kimberly D. Bose,
Secretary.
Appendix 1
BILLING CODE 6717–01–P
E:\FR\FM\25OCN1.SGM
25OCN1
khammond on DSKJM1Z7X2PROD with NOTICES
64476
VerDate Sep<11>2014
Jkt 259001
e
Propo~ll:!d Compressor Station
Exlsting Compressor Sta!bn
Existing Facmty Slte
Existing Storage Facility
PO 00000
Frm 00045
Fmt 4703
Sfmt 4725
E:\FR\FM\25OCN1.SGM
25OCN1
EN25OC22.095
East Tennessee Natural Gas
Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices
16:52 Oct 24, 2022
Legend
Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices
64477
FROM
-----------------
ATTN: OEP- Gas 3, PJ -11.3
Federal Energy Regulatory Commission
888 First Street NE
Washington, DC 20426
(PF22-8-000, System Alignment Program Project)
Staple or Tape Here
BILLING CODE 6717–01–C
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2022–0132; FRL–9411–09–
OCSPP]
Certain New Chemicals; Receipt and
Status Information for September 2022
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA is required under the
Toxic Substances Control Act (TSCA),
as amended by the Frank R. Lautenberg
Chemical Safety for the 21st Century
Act, to make information publicly
available and to publish information in
the Federal Register pertaining to
submissions under TSCA Section 5,
including notice of receipt of a
Premanufacture notice (PMN),
Significant New Use Notice (SNUN) or
Microbial Commercial Activity Notice
(MCAN), including an amended notice
or test information; an exemption
application (Biotech exemption); an
application for a test marketing
exemption (TME), both pending and/or
concluded; a notice of commencement
(NOC) of manufacture (including
import) for new chemical substances;
and a periodic status report on new
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
16:52 Oct 24, 2022
Jkt 259001
chemical substances that are currently
under EPA review or have recently
concluded review. This document
covers the period from 9/1/2022 to 9/30/
2022.
DATES: Comments identified by the
specific case number provided in this
document must be received on or before
November 25, 2022.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2022–0132,
through the Federal eRulemaking Portal
at https://www.regulations.gov. Follow
the online instructions for submitting
comments. Do not submit electronically
any information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Additional
instructions on commenting and visiting
the docket, along with more information
about dockets generally, is available at
https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT:
For technical information contact: Jim
Rahai, Project Management and
Operations Division (MC 7407M), Office
of Pollution Prevention and Toxics,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460–0001; telephone number: (202)
564–8593; email address: rahai.jim@
epa.gov.
For general information contact: The
TSCA-Hotline, ABVI-Goodwill, 422
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
South Clinton Ave., Rochester, NY
14620; telephone number: (202) 554–
1404; email address: TSCA-Hotline@
epa.gov.
SUPPLEMENTARY INFORMATION:
I. Executive Summary
A. What action is the Agency taking?
This document provides the receipt
and status reports for the period from
09/01/2022 to 09/30/2022. The Agency
is providing notice of receipt of PMNs,
SNUNs, and MCANs (including
amended notices and test information);
an exemption application under 40 CFR
part 725 (Biotech exemption); TMEs,
both pending and/or concluded; NOCs
to manufacture a new chemical
substance; and a periodic status report
on new chemical substances that are
currently under EPA review or have
recently concluded review.
EPA is also providing information on
its website about cases reviewed under
the amended TSCA, including the
section 5 PMN/SNUN/MCAN and
exemption notices received, the date of
receipt, the final EPA determination on
the notice, and the effective date of
EPA’s determination for PMN/SNUN/
MCAN notices on its website at: https://
www.epa.gov/reviewing-new-chemicalsunder-toxic-substances-control-act-tsca/
status-pre-manufacture-notices. This
information is updated on a weekly
basis.
E:\FR\FM\25OCN1.SGM
25OCN1
EN25OC22.097
[FR Doc. 2022–23171 Filed 10–24–22; 8:45 am]
Agencies
[Federal Register Volume 87, Number 205 (Tuesday, October 25, 2022)]
[Notices]
[Pages 64473-64477]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23171]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF22-8-000]
East Tennessee Natural Gas, LLC; Notice of Scoping Period
Requesting Comments on Environmental Issues for the Planned System
Alignment Program Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document that will discuss
the environmental impacts of the System Alignment Program Project
involving construction and operation of facilities by East Tennessee
Natural Gas, LLC (ETNG) in Knox, Jefferson, and Sevier Counties,
Tennessee; Rockingham County, North Carolina; and Washington and Wythe
Counties, Virginia. ETNG would also complete a hydrotest of an
approximately 1.2-mile segment of existing pipeline in Patrick County,
Virginia. The Commission will use this environmental document in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity. This
gathering of public input is referred to as ``scoping.'' The main goal
of the scoping process is to focus the analysis in the environmental
document on the important environmental issues. Additional information
about the Commission's NEPA process is described below in the NEPA
Process and Environmental Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on November 18, 2022. Comments may be
submitted in written or oral form. Further details on how to submit
comments are provided in the Public Participation section of this
notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written or oral comments during the preparation
of the environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on June 16, 2022, you will need to file
those comments in Docket No. PF22-8-000 to ensure they are considered.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this planned
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the planned facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, the Natural Gas Act conveys the right of eminent
domain to the company. Therefore, if you and the company do not reach
an easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law. The Commission does
not subsequently grant, exercise, or oversee the exercise of that
eminent domain authority. The courts have exclusive authority to handle
eminent domain cases; the Commission has no jurisdiction over these
matters.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses typically
asked questions, including the use of eminent domain and how to
participate in the Commission's proceedings. This fact sheet along with
other landowner topics of interest are available for viewing on the
FERC website (www.ferc.gov) under the links to Natural Gas Questions or
Landowner Topics.
Public Participation
There are four methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You
[[Page 64474]]
will be asked to select the type of filing you are making; a comment on
a particular project is considered a ``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (PF22-8-
000) on your letter. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852; or
(4) In lieu of sending written comments, the Commission invites you
to attend one of the public scoping session(s) its staff will conduct.
A schedule of the scoping meeting dates, times, and locations (if
applicable) will be issued in a separate notice at least two weeks
prior to the date of the meeting(s).
It is important to note that the Commission provides equal
consideration to all comments received, whether filed in written form
or provided orally scoping session.
Additionally, the Commission offers a free service called
eSubscription, which makes it easy to stay informed of all issuances
and submittals regarding the dockets/projects to which you subscribe.
These instant email notifications are the fastest way to receive
notification and provide a link to the document files which can reduce
the amount of time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Summary of the Planned Project
The project involves the installation of facilities to enhance the
physical, bi-directional flow capability on ETNG's Line 3300-1. ETNG
plans to construct approximately 16.2 miles of 24-inch-diameter
pipeline loop \1\ (Boyds Creek Loop) adjacent to its existing 16-inch-
diameter pipeline in Knox and Sevier Counties, Tennessee; a new 6,000-
horsepower compressor station (the Talbot Compressor Station) in
Jefferson County, Tennessee; a new 19,000-horsepower compressor station
in Rockingham County, North Carolina (the Draper Compressor Station);
and ancillary facilities in Knox County and Sevier Counties, Tennessee
and Washington and Wythe Counties, Virginia. ETNG would also replace
approximately 6.5 miles of 8-inch-diameter pipeline with new 24-inch-
diameter pipeline within its existing right-of-way in Washington
County, Virginia and complete a hydrotest of an approximately 1.2 mile-
segment of existing pipeline in Patrick County, Virginia.
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline.
---------------------------------------------------------------------------
ETNG states that the purpose of the planned project is to improve
the operational reliability of its system by minimizing the amount of
displacement in the system design to meet customers' shifting needs.
Specifically, ETNG states that with the existing system design,
delivery of nominated quantities of natural gas from west-to-east and
east-to-west relies upon customers' nominations of sufficient
quantities in the opposite direction. However, changes in customer
nominations have increasingly challenged ETNG's operational ability to
meet all of its firm service obligations. Planned facilities would
provide existing service to existing customers; ETNG would not sell
additional capacity as part of the project.
The general location of the project facilities is shown in appendix
A.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary''. For instructions on
connecting to eLibrary, refer to the last page of this notice. At
this time, the Commission has suspended access to the Commission's
Public Reference Room due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact
FERC at [email protected] or call toll free, (886) 208-3676
or TTY (202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned facilities would disturb about 361.6
acres of land for the aboveground facilities and pipelines. Following
construction, ETNG would maintain about 35 acres for permanent
operation of the project's aboveground facilities; the remaining
acreage would be restored. The planned Boyds Creek Loop is located
within or adjacent to ETNG's existing Line 3300-1 right-of-way for 14.3
miles (approximately 88 percent of its total length).
NEPA Process and the Environmental Document
Any environmental document issued by Commission staff will discuss
impacts that could occur as a result of the construction and operation
of the planned project under the relevant general resource areas:
geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
socioeconomics and environmental justice;
air quality and noise;
reliability and safety; and
cumulative impacts.
Commission staff will also evaluate reasonable alternatives to the
planned project or portions of the project and make recommendations on
how to lessen or avoid impacts on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further study and discussion in the environmental
document.
Although no formal application has been filed, Commission staff
have already initiated a NEPA review under the Commission's pre-filing
process. The purpose of the pre-filing process is to encourage early
involvement of interested stakeholders and to identify and resolve
issues before the Commission receives an application. As part of the
pre-filing review, Commission staff will contact federal and state
agencies to discuss their involvement in the scoping process and the
preparation of the environmental document.
If a formal application is filed, Commission staff will then
determine whether to prepare an Environmental Assessment (EA) or an
Environmental Impact Statement (EIS). The EA or the EIS will present
Commission staff's independent analysis of the environmental issues. If
Commission staff prepares an EA, a Notice of Schedule for the
Preparation of an Environmental Assessment will be issued. The EA may
be issued for an allotted public comment period. The Commission would
consider timely comments on the EA before making its determination on
the proposed project. If Commission staff prepares an EIS, a Notice of
Intent to Prepare an EIS/Notice of Schedule will be issued once an
application is filed, which will open an additional public comment
period. Staff will then prepare a draft EIS that will be issued for
public comment. Commission staff will consider all timely comments
received during the comment period on the draft EIS, and revise the
document, as necessary, before issuing a final EIS. Any EA or draft and
final EIS will be available in electronic format in the public record
[[Page 64475]]
through eLibrary \3\ and the Commission's natural gas environmental
documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you will receive
instant email notification when the environmental document is issued.
---------------------------------------------------------------------------
\3\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues related to this project to formally cooperate in
the preparation of the environmental document.\4\ Agencies that would
like to request cooperating agency status should follow the
instructions for filing comments provided under the Public
Participation section of this notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.8.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic
Preservation Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\5\ The environmental document for this
project will document our findings on the impacts on historic
properties and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project and includes a mailing address with their
comments. Commission staff will update the environmental mailing list
as the analysis proceeds to ensure that Commission notices related to
this environmental review are sent to all individuals, organizations,
and government entities interested in and/or potentially affected by
the planned project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number PF22-8-000 in your request.
If you are requesting a change to your address, please be sure to
include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments.
OR
(2) Return the attached ``Mailing List Update Form'' (appendix 2).
Becoming an Intervenor
Once ETNG files its application with the Commission, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Only intervenors have the right to seek
rehearing of the Commission's decision and be heard by the courts if
they choose to appeal the Commission's final ruling. An intervenor
formally participates in the proceeding by filing a request to
intervene pursuant to Rule 214 of the Commission's Rules of Practice
and Procedures (18 CFR 385.214). Motions to intervene are more fully
described at https://www.ferc.gov/resources/guides/how-to.asp. Please
note that the Commission will not accept requests for intervenor status
at this time. You must wait until the Commission receives a formal
application for the project, after which the Commission will issue a
public notice that establishes an intervention deadline.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or toll free at (866) 208-3676,
or for TTY, contact (202) 502-8659. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: October 19, 2022.
Kimberly D. Bose,
Secretary.
Appendix 1
BILLING CODE 6717-01-P
[[Page 64476]]
[GRAPHIC] [TIFF OMITTED] TN25OC22.095
[[Page 64477]]
[GRAPHIC] [TIFF OMITTED] TN25OC22.097
[FR Doc. 2022-23171 Filed 10-24-22; 8:45 am]
BILLING CODE 6717-01-C