East Tennessee Natural Gas, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned System Alignment Program Project, 64473-64477 [2022-23171]

Download as PDF Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices Applicants: Waters Rd S, LLC, Waters Rd N, LLC, Wakefield Solar Fund, LLC, USS New Scotland 1 LLC, Turin Solar Fund, LLC, Tri-County Solar Fund 1, LLC, Tri-County Solar Fund 1, LLC, TriCounty Solar Fund 1, LLC, Mtn Solar 5 LLC, Mtn Solar 4 LLC, Mtn Solar 2 LLC, Mtn Solar 1 LLC,ECA Maine BET, LLC,CO LI CSG 3 LLC,CO LI CSG 1 LLC, Burrillville Solar, LLC. Description: Refund Reports of Burrillville Solar, LLC, et al. Filed Date: 10/18/22. Accession Number: 20221018–5159. Comment Date: 5 p.m. ET 11/8/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 19, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–23175 Filed 10–24–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF22–8–000] khammond on DSKJM1Z7X2PROD with NOTICES East Tennessee Natural Gas, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned System Alignment Program Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document that will discuss the environmental impacts of the System Alignment Program Project involving construction and operation of facilities by East Tennessee Natural Gas, LLC (ETNG) in Knox, Jefferson, and Sevier Counties, Tennessee; Rockingham County, North Carolina; VerDate Sep<11>2014 16:52 Oct 24, 2022 Jkt 259001 and Washington and Wythe Counties, Virginia. ETNG would also complete a hydrotest of an approximately 1.2-mile segment of existing pipeline in Patrick County, Virginia. The Commission will use this environmental document in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and Environmental Document section of this notice. By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on November 18, 2022. Comments may be submitted in written or oral form. Further details on how to submit comments are provided in the Public Participation section of this notice. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the environmental document. Commission staff will consider all written or oral comments during the preparation of the environmental document. If you submitted comments on this project to the Commission before the opening of this docket on June 16, 2022, you will need to file those comments in Docket No. PF22–8–000 to ensure they are considered. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this planned PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 64473 project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the planned facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. The Commission does not subsequently grant, exercise, or oversee the exercise of that eminent domain authority. The courts have exclusive authority to handle eminent domain cases; the Commission has no jurisdiction over these matters. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ addresses typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website (www.ferc.gov) under the links to Natural Gas Questions or Landowner Topics. Public Participation There are four methods you can use to submit your comments to the Commission. Please carefully follow these instructions so that your comments are properly recorded. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You E:\FR\FM\25OCN1.SGM 25OCN1 64474 Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices khammond on DSKJM1Z7X2PROD with NOTICES will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (PF22–8–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852; or (4) In lieu of sending written comments, the Commission invites you to attend one of the public scoping session(s) its staff will conduct. A schedule of the scoping meeting dates, times, and locations (if applicable) will be issued in a separate notice at least two weeks prior to the date of the meeting(s). It is important to note that the Commission provides equal consideration to all comments received, whether filed in written form or provided orally scoping session. Additionally, the Commission offers a free service called eSubscription, which makes it easy to stay informed of all issuances and submittals regarding the dockets/projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https:// www.ferc.gov/ferc-online/overview to register for eSubscription. Summary of the Planned Project The project involves the installation of facilities to enhance the physical, bidirectional flow capability on ETNG’s Line 3300–1. ETNG plans to construct approximately 16.2 miles of 24-inchdiameter pipeline loop 1 (Boyds Creek Loop) adjacent to its existing 16-inchdiameter pipeline in Knox and Sevier Counties, Tennessee; a new 6,000horsepower compressor station (the Talbot Compressor Station) in Jefferson County, Tennessee; a new 19,000horsepower compressor station in Rockingham County, North Carolina (the Draper Compressor Station); and ancillary facilities in Knox County and Sevier Counties, Tennessee and Washington and Wythe Counties, 1 A pipeline loop is a segment of pipe constructed parallel to an existing pipeline. VerDate Sep<11>2014 16:52 Oct 24, 2022 Jkt 259001 Virginia. ETNG would also replace approximately 6.5 miles of 8-inchdiameter pipeline with new 24-inchdiameter pipeline within its existing right-of-way in Washington County, Virginia and complete a hydrotest of an approximately 1.2 mile-segment of existing pipeline in Patrick County, Virginia. ETNG states that the purpose of the planned project is to improve the operational reliability of its system by minimizing the amount of displacement in the system design to meet customers’ shifting needs. Specifically, ETNG states that with the existing system design, delivery of nominated quantities of natural gas from west-to-east and eastto-west relies upon customers’ nominations of sufficient quantities in the opposite direction. However, changes in customer nominations have increasingly challenged ETNG’s operational ability to meet all of its firm service obligations. Planned facilities would provide existing service to existing customers; ETNG would not sell additional capacity as part of the project. The general location of the project facilities is shown in appendix A.2 Land Requirements for Construction Construction of the planned facilities would disturb about 361.6 acres of land for the aboveground facilities and pipelines. Following construction, ETNG would maintain about 35 acres for permanent operation of the project’s aboveground facilities; the remaining acreage would be restored. The planned Boyds Creek Loop is located within or adjacent to ETNG’s existing Line 3300– 1 right-of-way for 14.3 miles (approximately 88 percent of its total length). NEPA Process and the Environmental Document Any environmental document issued by Commission staff will discuss impacts that could occur as a result of the construction and operation of the planned project under the relevant general resource areas: • geology and soils; • water resources and wetlands; 2 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’. For instructions on connecting to eLibrary, refer to the last page of this notice. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use; • socioeconomics and environmental justice; • air quality and noise; • reliability and safety; and • cumulative impacts. Commission staff will also evaluate reasonable alternatives to the planned project or portions of the project and make recommendations on how to lessen or avoid impacts on the various resource areas. Your comments will help Commission staff identify and focus on the issues that might have an effect on the human environment and potentially eliminate others from further study and discussion in the environmental document. Although no formal application has been filed, Commission staff have already initiated a NEPA review under the Commission’s pre-filing process. The purpose of the pre-filing process is to encourage early involvement of interested stakeholders and to identify and resolve issues before the Commission receives an application. As part of the pre-filing review, Commission staff will contact federal and state agencies to discuss their involvement in the scoping process and the preparation of the environmental document. If a formal application is filed, Commission staff will then determine whether to prepare an Environmental Assessment (EA) or an Environmental Impact Statement (EIS). The EA or the EIS will present Commission staff’s independent analysis of the environmental issues. If Commission staff prepares an EA, a Notice of Schedule for the Preparation of an Environmental Assessment will be issued. The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its determination on the proposed project. If Commission staff prepares an EIS, a Notice of Intent to Prepare an EIS/ Notice of Schedule will be issued once an application is filed, which will open an additional public comment period. Staff will then prepare a draft EIS that will be issued for public comment. Commission staff will consider all timely comments received during the comment period on the draft EIS, and revise the document, as necessary, before issuing a final EIS. Any EA or draft and final EIS will be available in electronic format in the public record E:\FR\FM\25OCN1.SGM 25OCN1 Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices through eLibrary 3 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant email notification when the environmental document is issued. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues related to this project to formally cooperate in the preparation of the environmental document.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.5 The environmental document for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. khammond on DSKJM1Z7X2PROD with NOTICES 3 For instructions on connecting to eLibrary, refer to the last page of this notice. 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.8. 5 The Advisory Council on Historic Preservation regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. VerDate Sep<11>2014 16:52 Oct 24, 2022 Jkt 259001 Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please complete one of the following steps: (1) Send an email to GasProjectAddressChange@ferc.gov stating your request. You must include the docket number PF22–8–000 in your request. If you are requesting a change to your address, please be sure to include your name and the correct address. If you are requesting to delete your address from the mailing list, please include your name and address as it appeared on this notice. This email address is unable to accept comments. OR (2) Return the attached ‘‘Mailing List Update Form’’ (appendix 2). Becoming an Intervenor Once ETNG files its application with the Commission, you may want to become an ‘‘intervenor’’ which is an PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 64475 official party to the Commission’s proceeding. Only intervenors have the right to seek rehearing of the Commission’s decision and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214). Motions to intervene are more fully described at https://www.ferc.gov/resources/guides/ how-to.asp. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project, after which the Commission will issue a public notice that establishes an intervention deadline. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. Dated: October 19, 2022. Kimberly D. Bose, Secretary. Appendix 1 BILLING CODE 6717–01–P E:\FR\FM\25OCN1.SGM 25OCN1 khammond on DSKJM1Z7X2PROD with NOTICES 64476 VerDate Sep<11>2014 Jkt 259001 e Propo~ll:!d Compressor Station Exlsting Compressor Sta!bn Existing Facmty Slte Existing Storage Facility PO 00000 Frm 00045 Fmt 4703 Sfmt 4725 E:\FR\FM\25OCN1.SGM 25OCN1 EN25OC22.095</GPH> East Tennessee Natural Gas Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices 16:52 Oct 24, 2022 Legend Federal Register / Vol. 87, No. 205 / Tuesday, October 25, 2022 / Notices 64477 FROM ----------------- ATTN: OEP- Gas 3, PJ -11.3 Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 (PF22-8-000, System Alignment Program Project) Staple or Tape Here BILLING CODE 6717–01–C ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2022–0132; FRL–9411–09– OCSPP] Certain New Chemicals; Receipt and Status Information for September 2022 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: EPA is required under the Toxic Substances Control Act (TSCA), as amended by the Frank R. Lautenberg Chemical Safety for the 21st Century Act, to make information publicly available and to publish information in the Federal Register pertaining to submissions under TSCA Section 5, including notice of receipt of a Premanufacture notice (PMN), Significant New Use Notice (SNUN) or Microbial Commercial Activity Notice (MCAN), including an amended notice or test information; an exemption application (Biotech exemption); an application for a test marketing exemption (TME), both pending and/or concluded; a notice of commencement (NOC) of manufacture (including import) for new chemical substances; and a periodic status report on new khammond on DSKJM1Z7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 16:52 Oct 24, 2022 Jkt 259001 chemical substances that are currently under EPA review or have recently concluded review. This document covers the period from 9/1/2022 to 9/30/ 2022. DATES: Comments identified by the specific case number provided in this document must be received on or before November 25, 2022. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2022–0132, through the Federal eRulemaking Portal at https://www.regulations.gov. Follow the online instructions for submitting comments. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Additional instructions on commenting and visiting the docket, along with more information about dockets generally, is available at https://www.epa.gov/dockets. FOR FURTHER INFORMATION CONTACT: For technical information contact: Jim Rahai, Project Management and Operations Division (MC 7407M), Office of Pollution Prevention and Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460–0001; telephone number: (202) 564–8593; email address: rahai.jim@ epa.gov. For general information contact: The TSCA-Hotline, ABVI-Goodwill, 422 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 South Clinton Ave., Rochester, NY 14620; telephone number: (202) 554– 1404; email address: TSCA-Hotline@ epa.gov. SUPPLEMENTARY INFORMATION: I. Executive Summary A. What action is the Agency taking? This document provides the receipt and status reports for the period from 09/01/2022 to 09/30/2022. The Agency is providing notice of receipt of PMNs, SNUNs, and MCANs (including amended notices and test information); an exemption application under 40 CFR part 725 (Biotech exemption); TMEs, both pending and/or concluded; NOCs to manufacture a new chemical substance; and a periodic status report on new chemical substances that are currently under EPA review or have recently concluded review. EPA is also providing information on its website about cases reviewed under the amended TSCA, including the section 5 PMN/SNUN/MCAN and exemption notices received, the date of receipt, the final EPA determination on the notice, and the effective date of EPA’s determination for PMN/SNUN/ MCAN notices on its website at: https:// www.epa.gov/reviewing-new-chemicalsunder-toxic-substances-control-act-tsca/ status-pre-manufacture-notices. This information is updated on a weekly basis. E:\FR\FM\25OCN1.SGM 25OCN1 EN25OC22.097</GPH> [FR Doc. 2022–23171 Filed 10–24–22; 8:45 am]

Agencies

[Federal Register Volume 87, Number 205 (Tuesday, October 25, 2022)]
[Notices]
[Pages 64473-64477]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-23171]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF22-8-000]


East Tennessee Natural Gas, LLC; Notice of Scoping Period 
Requesting Comments on Environmental Issues for the Planned System 
Alignment Program Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document that will discuss 
the environmental impacts of the System Alignment Program Project 
involving construction and operation of facilities by East Tennessee 
Natural Gas, LLC (ETNG) in Knox, Jefferson, and Sevier Counties, 
Tennessee; Rockingham County, North Carolina; and Washington and Wythe 
Counties, Virginia. ETNG would also complete a hydrotest of an 
approximately 1.2-mile segment of existing pipeline in Patrick County, 
Virginia. The Commission will use this environmental document in its 
decision-making process to determine whether the project is in the 
public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the project. As part of the National Environmental 
Policy Act (NEPA) review process, the Commission takes into account 
concerns the public may have about proposals and the environmental 
impacts that could result from its action whenever it considers the 
issuance of a Certificate of Public Convenience and Necessity. This 
gathering of public input is referred to as ``scoping.'' The main goal 
of the scoping process is to focus the analysis in the environmental 
document on the important environmental issues. Additional information 
about the Commission's NEPA process is described below in the NEPA 
Process and Environmental Document section of this notice.
    By this notice, the Commission requests public comments on the 
scope of issues to address in the environmental document. To ensure 
that your comments are timely and properly recorded, please submit your 
comments so that the Commission receives them in Washington, DC on or 
before 5:00 p.m. Eastern Time on November 18, 2022. Comments may be 
submitted in written or oral form. Further details on how to submit 
comments are provided in the Public Participation section of this 
notice.
    Your comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the environmental document. Commission 
staff will consider all written or oral comments during the preparation 
of the environmental document.
    If you submitted comments on this project to the Commission before 
the opening of this docket on June 16, 2022, you will need to file 
those comments in Docket No. PF22-8-000 to ensure they are considered.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the planned facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law. The Commission does 
not subsequently grant, exercise, or oversee the exercise of that 
eminent domain authority. The courts have exclusive authority to handle 
eminent domain cases; the Commission has no jurisdiction over these 
matters.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' addresses typically 
asked questions, including the use of eminent domain and how to 
participate in the Commission's proceedings. This fact sheet along with 
other landowner topics of interest are available for viewing on the 
FERC website (www.ferc.gov) under the links to Natural Gas Questions or 
Landowner Topics.

Public Participation

    There are four methods you can use to submit your comments to the 
Commission. Please carefully follow these instructions so that your 
comments are properly recorded. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You

[[Page 64474]]

will be asked to select the type of filing you are making; a comment on 
a particular project is considered a ``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (PF22-8-
000) on your letter. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852; or
    (4) In lieu of sending written comments, the Commission invites you 
to attend one of the public scoping session(s) its staff will conduct. 
A schedule of the scoping meeting dates, times, and locations (if 
applicable) will be issued in a separate notice at least two weeks 
prior to the date of the meeting(s).
    It is important to note that the Commission provides equal 
consideration to all comments received, whether filed in written form 
or provided orally scoping session.
    Additionally, the Commission offers a free service called 
eSubscription, which makes it easy to stay informed of all issuances 
and submittals regarding the dockets/projects to which you subscribe. 
These instant email notifications are the fastest way to receive 
notification and provide a link to the document files which can reduce 
the amount of time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.

Summary of the Planned Project

    The project involves the installation of facilities to enhance the 
physical, bi-directional flow capability on ETNG's Line 3300-1. ETNG 
plans to construct approximately 16.2 miles of 24-inch-diameter 
pipeline loop \1\ (Boyds Creek Loop) adjacent to its existing 16-inch-
diameter pipeline in Knox and Sevier Counties, Tennessee; a new 6,000-
horsepower compressor station (the Talbot Compressor Station) in 
Jefferson County, Tennessee; a new 19,000-horsepower compressor station 
in Rockingham County, North Carolina (the Draper Compressor Station); 
and ancillary facilities in Knox County and Sevier Counties, Tennessee 
and Washington and Wythe Counties, Virginia. ETNG would also replace 
approximately 6.5 miles of 8-inch-diameter pipeline with new 24-inch-
diameter pipeline within its existing right-of-way in Washington 
County, Virginia and complete a hydrotest of an approximately 1.2 mile-
segment of existing pipeline in Patrick County, Virginia.
---------------------------------------------------------------------------

    \1\ A pipeline loop is a segment of pipe constructed parallel to 
an existing pipeline.
---------------------------------------------------------------------------

    ETNG states that the purpose of the planned project is to improve 
the operational reliability of its system by minimizing the amount of 
displacement in the system design to meet customers' shifting needs. 
Specifically, ETNG states that with the existing system design, 
delivery of nominated quantities of natural gas from west-to-east and 
east-to-west relies upon customers' nominations of sufficient 
quantities in the opposite direction. However, changes in customer 
nominations have increasingly challenged ETNG's operational ability to 
meet all of its firm service obligations. Planned facilities would 
provide existing service to existing customers; ETNG would not sell 
additional capacity as part of the project.
    The general location of the project facilities is shown in appendix 
A.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary''. For instructions on 
connecting to eLibrary, refer to the last page of this notice. At 
this time, the Commission has suspended access to the Commission's 
Public Reference Room due to the proclamation declaring a National 
Emergency concerning the Novel Coronavirus Disease (COVID-19), 
issued by the President on March 13, 2020. For assistance, contact 
FERC at [email protected] or call toll free, (886) 208-3676 
or TTY (202) 502-8659.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would disturb about 361.6 
acres of land for the aboveground facilities and pipelines. Following 
construction, ETNG would maintain about 35 acres for permanent 
operation of the project's aboveground facilities; the remaining 
acreage would be restored. The planned Boyds Creek Loop is located 
within or adjacent to ETNG's existing Line 3300-1 right-of-way for 14.3 
miles (approximately 88 percent of its total length).

NEPA Process and the Environmental Document

    Any environmental document issued by Commission staff will discuss 
impacts that could occur as a result of the construction and operation 
of the planned project under the relevant general resource areas:
     geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use;
     socioeconomics and environmental justice;
     air quality and noise;
     reliability and safety; and
     cumulative impacts.
    Commission staff will also evaluate reasonable alternatives to the 
planned project or portions of the project and make recommendations on 
how to lessen or avoid impacts on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further study and discussion in the environmental 
document.
    Although no formal application has been filed, Commission staff 
have already initiated a NEPA review under the Commission's pre-filing 
process. The purpose of the pre-filing process is to encourage early 
involvement of interested stakeholders and to identify and resolve 
issues before the Commission receives an application. As part of the 
pre-filing review, Commission staff will contact federal and state 
agencies to discuss their involvement in the scoping process and the 
preparation of the environmental document.
    If a formal application is filed, Commission staff will then 
determine whether to prepare an Environmental Assessment (EA) or an 
Environmental Impact Statement (EIS). The EA or the EIS will present 
Commission staff's independent analysis of the environmental issues. If 
Commission staff prepares an EA, a Notice of Schedule for the 
Preparation of an Environmental Assessment will be issued. The EA may 
be issued for an allotted public comment period. The Commission would 
consider timely comments on the EA before making its determination on 
the proposed project. If Commission staff prepares an EIS, a Notice of 
Intent to Prepare an EIS/Notice of Schedule will be issued once an 
application is filed, which will open an additional public comment 
period. Staff will then prepare a draft EIS that will be issued for 
public comment. Commission staff will consider all timely comments 
received during the comment period on the draft EIS, and revise the 
document, as necessary, before issuing a final EIS. Any EA or draft and 
final EIS will be available in electronic format in the public record

[[Page 64475]]

through eLibrary \3\ and the Commission's natural gas environmental 
documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you will receive 
instant email notification when the environmental document is issued.
---------------------------------------------------------------------------

    \3\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues related to this project to formally cooperate in 
the preparation of the environmental document.\4\ Agencies that would 
like to request cooperating agency status should follow the 
instructions for filing comments provided under the Public 
Participation section of this notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.8.
---------------------------------------------------------------------------

    Consultation Under Section 106 of the National Historic 
Preservation Act
    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office(s), 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the project's potential 
effects on historic properties.\5\ The environmental document for this 
project will document our findings on the impacts on historic 
properties and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the planned project.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please complete one of 
the following steps:
    (1) Send an email to [email protected] stating your 
request. You must include the docket number PF22-8-000 in your request. 
If you are requesting a change to your address, please be sure to 
include your name and the correct address. If you are requesting to 
delete your address from the mailing list, please include your name and 
address as it appeared on this notice. This email address is unable to 
accept comments.
    OR
    (2) Return the attached ``Mailing List Update Form'' (appendix 2).

Becoming an Intervenor

    Once ETNG files its application with the Commission, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Only intervenors have the right to seek 
rehearing of the Commission's decision and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene pursuant to Rule 214 of the Commission's Rules of Practice 
and Procedures (18 CFR 385.214). Motions to intervene are more fully 
described at https://www.ferc.gov/resources/guides/how-to.asp. Please 
note that the Commission will not accept requests for intervenor status 
at this time. You must wait until the Commission receives a formal 
application for the project, after which the Commission will issue a 
public notice that establishes an intervention deadline.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field. Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at [email protected] or toll free at (866) 208-3676, 
or for TTY, contact (202) 502-8659. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at https://www.ferc.gov/news-events/events along with 
other related information.

    Dated: October 19, 2022.
Kimberly D. Bose,
Secretary.

Appendix 1

BILLING CODE 6717-01-P

[[Page 64476]]

[GRAPHIC] [TIFF OMITTED] TN25OC22.095


[[Page 64477]]


[GRAPHIC] [TIFF OMITTED] TN25OC22.097

[FR Doc. 2022-23171 Filed 10-24-22; 8:45 am]
BILLING CODE 6717-01-C