Missisquoi, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 63772-63773 [2022-22774]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
63772
Federal Register / Vol. 87, No. 202 / Thursday, October 20, 2022 / Notices
The Commission mailed a copy of the
Notice of Availability of the draft EIS to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The draft EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
environmental-documents). In addition,
the draft EIS may be accessed by using
the eLibrary link on the FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search) select
‘‘General Search’’ and enter the docket
number in the ‘‘Docket Number’’ field,
excluding the last three digits (i.e.,
CP22–138). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
The draft EIS is not a decision
document. It presents Commission
staff’s independent analysis of the
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding. Any person wishing to
comment on the draft EIS may do so.
Your comments should focus on draft
EIS’s disclosure and discussion of
potential environmental effects,
measures to avoid or lessen
environmental impacts, and the
completeness of the submitted
alternatives, information and analyses.
To ensure consideration of your
comments on the proposal in the final
EIS, it is important that the Commission
receive your comments on or before 5:00
p.m. Eastern Time on December 5, 2022.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission will provide equal
consideration to all comments received,
whether filed in written form or
provided verbally. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. This is an easy method for
VerDate Sep<11>2014
16:50 Oct 19, 2022
Jkt 259001
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ If you are filing a comment
on a particular project, please select
‘‘Comment on a Filing’’ as the filing
type; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP22–138–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR part 385.214).
Motions to intervene are more fully
described at https://www.ferc.gov/ferconline/ferc-online/how-guides. Only
intervenors have the right to seek
rehearing or judicial review of the
Commission’s decision. The
Commission grants affected landowners
and others with environmental concerns
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which no other party can adequately
represent. Simply filing environmental
comments will not give you intervenor
status, but you do not need intervenor
status to have your comments
considered.
Questions?
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: October 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–22776 Filed 10–19–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7186–054]
Missisquoi, LLC; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests and Establishing
Procedural Schedule for Relicensing
and a Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 7186–054.
c. Date Filed: September 30, 2022.
d. Applicant: Missisquoi, LLC.
e. Name of Project: Sheldon Springs
Hydroelectric Project.
f. Location: On the Missisquoi River
in Franklin County, Vermont. The
project does not occupy any federal
land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Kevin
Webb, Licensing Manager, Missisquoi,
LLC, 670 N Commercial St., Suite 204,
Manchester, NH 03101; Phone at (978)
935–6039, or email at kwebb@
centralriverspower.com.
i. FERC Contact: John Baummer at
(202) 502–6837, or john.baummer@
ferc.gov.
j. Cooperating Agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
E:\FR\FM\20OCN1.SGM
20OCN1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 202 / Thursday, October 20, 2022 / Notices
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: November 29, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. All filings must
clearly identify the project name and
docket number on the first page:
Sheldon Springs Hydroelectric Project
(P–7186–054).
m. The application is not ready for
environmental analysis at this time.
n. Project Description: The existing
Sheldon Springs Hydroelectric Project
consists of: (1) a 283-foot-long, 35.5foot-high concrete overflow Ambursentype buttress dam that includes a 262foot-long spillway with 2-foot-high
wooden flashboards and a 16-foot-long,
8-foot-high hydraulically operated flap
gate; (2) an impoundment with a surface
area of approximately 175 acres; (3) the
Main Powerhouse containing two
identical vertical Kaplan turbinegenerator units with a total capacity of
20,500 kilowatts (kW); (4) the South
Mill Powerhouse that includes a 1,000kW Francis-type turbine-generator unit;
(5) the Grinder Room Powerhouse that
includes two Francis-type turbinegenerator units with a total capacity of
3,300 kW; (6) a 165-kW Kaplan turbinegenerator unit located in one of the
dam’s Ambursen bays; (7) two
transmission lines; and (8) appurtenant
facilities. The project creates an
VerDate Sep<11>2014
16:50 Oct 19, 2022
Jkt 259001
approximately 4,700-foot-long bypassed
reach of the Missisquoi River.
Missisquoi, LLC voluntarily operates
the project in a run-of-river mode such
that outflow from the project
approximates inflow. The minimum and
maximum hydraulic capacities of the
powerhouses are 70 and 3,342 cubic feet
per second (cfs), respectively. The
average annual generation of the project
was approximately 69,277 megawatthours from 2010 to 2020.
For the purpose of protecting aquatic
resources, Article 35 of the current
license requires Missisquoi, LLC to
release: (1) a minimum flow of 70 cfs or
inflow, whichever is less, to the
bypassed reach; (2) a minimum flow of
270 cfs or inflow, whichever is less, as
measured immediately below the
tailrace of the South Mill Powerhouse;
and (3) a minimum flow of 285 cfs or
inflow, whichever is less, as measured
immediately below the tailrace of the
Main Powerhouse.
The applicant proposes to: (1) operate
the project in a run-of-river mode; (2)
release a 70-cfs minimum bypassed
reach flow or inflow, whichever is less;
(3) release a 285-cfs minimum flow
downstream of the South Mill
Powerhouse or inflow, whichever is
less; (4) implement an impoundment
refill procedure, in the event of a
drawdown of the impoundment,
whereby 90 percent of inflow is passed
downstream and 10 percent of inflow is
used to refill the impoundment; (5)
release approximately 13 cfs over the
flashboard crest from 7:00 a.m. to 8:00
p.m. from May 1 to October 31; (6)
develop an operation compliance
monitoring plan; (7) install a 400-footlong path from the canoe portage
takeout to a public road; (8) install a
two-car parking area for canoe portage;
(9) improve the existing whitewater
boating access points; and (10)
implement erosion control measures to
protect cultural resources.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
63773
on March 13, 2020. For assistance,
contact FERC at FERCOnlineSupport@
ferc.gov or call toll-free, (866) 208–3676
or (202) 502–8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural Schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter and Request
Additional Information: November
2022
Issue Scoping Document 1 for
comments: February 2023
Request Additional Information (if
necessary): March 2023
Issue Acceptance Letter: March 2023
Issue Scoping Document 2 (if
necessary): April 2023
Issue Notice of Ready for Environmental
Analysis: April 2023
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: October 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–22774 Filed 10–19–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–507–000]
Transcontinental Gas Pipe Line
Company, LLC; Sea Robin Pipeline
Company, LLC; Florida Gas
Transmission Company, LLC; Notice
of Request for Extension of Time
Take notice that on October 11, 2022,
Transcontinental Gas Pipe Line
Company, LLC (Transco), 2800 Post Oak
Boulevard, Houston, Texas 77056,
requested that the Federal Energy
Regulatory Commission (Commission)
grant an extension of time, until
December 31, 2023, in order to complete
abandonment activities as authorized in
Transco’s VR22 to Shore Abandonment
Project (Project) in the March 18, 2021
Order Granting Abandonment 1 (March
1 Transcontinental Gas Pipe Line Company, LLC,
174 FERC ¶ 62,169 (2021).
E:\FR\FM\20OCN1.SGM
20OCN1
Agencies
[Federal Register Volume 87, Number 202 (Thursday, October 20, 2022)]
[Notices]
[Pages 63772-63773]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-22774]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7186-054]
Missisquoi, LLC; Notice of Application Tendered for Filing With
the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 7186-054.
c. Date Filed: September 30, 2022.
d. Applicant: Missisquoi, LLC.
e. Name of Project: Sheldon Springs Hydroelectric Project.
f. Location: On the Missisquoi River in Franklin County, Vermont.
The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Kevin Webb, Licensing Manager,
Missisquoi, LLC, 670 N Commercial St., Suite 204, Manchester, NH 03101;
Phone at (978) 935-6039, or email at [email protected].
i. FERC Contact: John Baummer at (202) 502-6837, or
[email protected].
j. Cooperating Agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See 94 FERC ]
61,076 (2001).
[[Page 63773]]
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: November 29, 2022.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
MD 20852. All filings must clearly identify the project name and docket
number on the first page: Sheldon Springs Hydroelectric Project (P-
7186-054).
m. The application is not ready for environmental analysis at this
time.
n. Project Description: The existing Sheldon Springs Hydroelectric
Project consists of: (1) a 283-foot-long, 35.5-foot-high concrete
overflow Ambursen-type buttress dam that includes a 262-foot-long
spillway with 2-foot-high wooden flashboards and a 16-foot-long, 8-
foot-high hydraulically operated flap gate; (2) an impoundment with a
surface area of approximately 175 acres; (3) the Main Powerhouse
containing two identical vertical Kaplan turbine-generator units with a
total capacity of 20,500 kilowatts (kW); (4) the South Mill Powerhouse
that includes a 1,000-kW Francis-type turbine-generator unit; (5) the
Grinder Room Powerhouse that includes two Francis-type turbine-
generator units with a total capacity of 3,300 kW; (6) a 165-kW Kaplan
turbine-generator unit located in one of the dam's Ambursen bays; (7)
two transmission lines; and (8) appurtenant facilities. The project
creates an approximately 4,700-foot-long bypassed reach of the
Missisquoi River.
Missisquoi, LLC voluntarily operates the project in a run-of-river
mode such that outflow from the project approximates inflow. The
minimum and maximum hydraulic capacities of the powerhouses are 70 and
3,342 cubic feet per second (cfs), respectively. The average annual
generation of the project was approximately 69,277 megawatt-hours from
2010 to 2020.
For the purpose of protecting aquatic resources, Article 35 of the
current license requires Missisquoi, LLC to release: (1) a minimum flow
of 70 cfs or inflow, whichever is less, to the bypassed reach; (2) a
minimum flow of 270 cfs or inflow, whichever is less, as measured
immediately below the tailrace of the South Mill Powerhouse; and (3) a
minimum flow of 285 cfs or inflow, whichever is less, as measured
immediately below the tailrace of the Main Powerhouse.
The applicant proposes to: (1) operate the project in a run-of-
river mode; (2) release a 70-cfs minimum bypassed reach flow or inflow,
whichever is less; (3) release a 285-cfs minimum flow downstream of the
South Mill Powerhouse or inflow, whichever is less; (4) implement an
impoundment refill procedure, in the event of a drawdown of the
impoundment, whereby 90 percent of inflow is passed downstream and 10
percent of inflow is used to refill the impoundment; (5) release
approximately 13 cfs over the flashboard crest from 7:00 a.m. to 8:00
p.m. from May 1 to October 31; (6) develop an operation compliance
monitoring plan; (7) install a 400-foot-long path from the canoe
portage takeout to a public road; (8) install a two-car parking area
for canoe portage; (9) improve the existing whitewater boating access
points; and (10) implement erosion control measures to protect cultural
resources.
o. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (https://www.ferc.gov)
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. At this
time, the Commission has suspended access to the Commission's Public
Reference Room due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19) issued on March 13,
2020. For assistance, contact FERC at [email protected] or
call toll-free, (866) 208-3676 or (202) 502-8659 (TTY).
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural Schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
Issue Deficiency Letter and Request Additional Information: November
2022
Issue Scoping Document 1 for comments: February 2023
Request Additional Information (if necessary): March 2023
Issue Acceptance Letter: March 2023
Issue Scoping Document 2 (if necessary): April 2023
Issue Notice of Ready for Environmental Analysis: April 2023
q. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: October 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-22774 Filed 10-19-22; 8:45 am]
BILLING CODE 6717-01-P