Gas Transmission Northwest LLC; Notice of Revised Schedule for Environmental Review of the GTN XPress Project, 62403-62404 [2022-22365]
Download as PDF
Federal Register / Vol. 87, No. 198 / Friday, October 14, 2022 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–22350 Filed 10–13–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. TX23–2–000]
EnerSmart Imperial Beach BESS LLC;
Notice of Filing
jspears on DSK121TN23PROD with NOTICES
Take notice that on October 6, 2022,
pursuant to section 211 of the Federal
Power Act,1 and Section 9.3.3 of the San
Diego Gas & Electric Company (SDG&E)
Transmission Owner Tariff (SDG&E TO
Tariff), and Section 4 of the SDG&E
Wholesale Distribution Open Access
Tariff (SDG&E Tariffs), EnerSmart
Imperial Beach BESS LLC (EnerSmart
Imperial Beach) filed an application
requesting that the Federal Energy
Regulatory Commission (Commission)
issue an order requiring SDG&E to
provide interconnection and
transmission service for the proposed
Imperial Beach BESS battery energy
storage facility under the terms and
conditions of the Transmission Control
Agreement between SDG&E and the
California Independent System Operator
Corporation (CAISO), the SDG&E
Tariffs, CAISO’s Fifth Replacement
FERC Electric Tariff, and the Small
Generator Interconnection Agreements
between EnerSmart Imperial Beach and
SDG&E, dated May 31, 2022, as it may
be in effect from time to time.2
1 16
U.S.C. 824j (2018).
SGIA is associated with application
numbers W192 and W193 for two 3 MW battery
energy storage facilities, interconnecting at two
points of interconnection, specified as (i) an
extension of Imperial Beach circuit 158 from the
manhole M1528073924 and (ii) an extension of
Imperial Beach circuit 532 from the manhole
M1526873925.
2 The
VerDate Sep<11>2014
17:22 Oct 13, 2022
Jkt 259001
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern
Time on November 7, 2022.
Dated: October 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–22351 Filed 10–13–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
62403
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–2–000]
Gas Transmission Northwest LLC;
Notice of Revised Schedule for
Environmental Review of the GTN
XPress Project
This notice provides the Federal
Energy Regulatory Commission staff’s
revised schedule for completion of the
environmental impact statement (EIS)
for Gas Transmission Northwest LLC’s
(GTN) GTN XPress Project. The Notice
of Intent issued on January 21, 2022
identified October 14, 2022 as the final
EIS issuance date. However, numerous
comments filed during the draft EIS
comment period require additional time
for Commission staff’s analysis. As a
result, staff has revised the schedule for
issuance of the final EIS.
Schedule for Environmental Review
Issuance of the Notice of Availability of
the final EIS—November 18, 2022
90-day Federal Authorization Decision
Deadline 1—February 16, 2023
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP22–2), and follow the
1 The Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
E:\FR\FM\14OCN1.SGM
14OCN1
62404
Federal Register / Vol. 87, No. 198 / Friday, October 14, 2022 / Notices
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: October 7, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–22365 Filed 10–13–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. TX23–1–000]
jspears on DSK121TN23PROD with NOTICES
EnerSmart Mesa Heights BESS LLC;
Notice of Filing
Take notice that on October 6, 2022,
pursuant to section 211 of the Federal
Power Act,1 and Section 9.3.3 of the San
Diego Gas & Electric Company (SDG&E)
Transmission Owner Tariff (SDG&E TO
Tariff), and Section 4 of the SDG&E
Wholesale Distribution Open Access
Tariff (SDG&E Tariffs), EnerSmart Mesa
Heights BESS LLC (EnerSmart Mesa
Heights) filed an application requesting
that the Federal Energy Regulatory
Commission (Commission) issue an
order requiring SDG&E to provide
interconnection and transmission
service for the proposed Mesa Heights
BESS battery energy storage facility
under the terms and conditions of the
Transmission Control Agreement
between SDG&E and the California
Independent System Operator
Corporation (CAISO), the SDG&E
Tariffs, CAISO’s Fifth Replacement
FERC Electric Tariff, and the Small
Generator Interconnection Agreement
between EnerSmart Mesa Heights and
SDG&E, dated May 31, 2022, as it may
be in effect from time to time.2
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
1 16
U.S.C. 824j (2018).
SGIA is associated with application number
W162 for the 3 MW battery energy storage facility,
interconnecting at a single point of interconnection,
specified as an extension of Mesa Heights circuit
1286 from the nearby pole P95664. SGIA at
Attachment 2.
2 The
VerDate Sep<11>2014
17:22 Oct 13, 2022
Jkt 259001
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern
Time on November 7, 2022.
Dated: October 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–22349 Filed 10–13–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC22–22–000]
Commission Information Collection
Activities (Ferc–539), Comment
Request; Extension
Federal Energy Regulatory
Commission, DOE.
AGENCY:
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Notice of information collection
and request for comments.
ACTION:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
539 (Gas Pipeline Certificates: Import &
Export Related Applications), which
will be submitted to the Office of
Management and Budget (OMB). The
Commission published a 60-day notice
in the Federal Register on August 1,
2022 and received no comments on the
60-day notice.
DATES: Comments on the collection of
information are due November 14, 2022.
ADDRESSES: Send written comments on
FERC 539 to OMB through
www.reginfo.gov/public/do/PRAMain,
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB Control Number
1902–0062 (Gas Pipeline Certificates:
Import & Export Related Applications)
in the subject line. Your comments
should be sent within 30 days of
publication of this notice in the Federal
Register.
Please submit copies of your
comments (identified by Docket No.
IC22–22–000 and the form) to the
Commission as noted below. Electronic
filing through https://www.ferc.gov, is
preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery.
Æ Mail via U.S. Postal Service only,
addressed to: Federal Energy Regulatory
Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (including courier) delivery
to: Federal Energy Regulatory
Commission, Secretary of the
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Please reference the specific
collection number(s) and/or title(s) in
your comments.
Instructions: OMB submissions must
be formatted and filed in accordance
with submission guidelines at:
www.reginfo.gov/public/do/PRAMain.
Using the search function under the
‘‘Currently Under Review field,’’ select
Federal Energy Regulatory Commission;
click ‘‘submit’’ and select ‘‘comment’’ to
the right of the subject collection. FERC
submissions must be formatted and filed
SUMMARY:
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 87, Number 198 (Friday, October 14, 2022)]
[Notices]
[Pages 62403-62404]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-22365]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-2-000]
Gas Transmission Northwest LLC; Notice of Revised Schedule for
Environmental Review of the GTN XPress Project
This notice provides the Federal Energy Regulatory Commission
staff's revised schedule for completion of the environmental impact
statement (EIS) for Gas Transmission Northwest LLC's (GTN) GTN XPress
Project. The Notice of Intent issued on January 21, 2022 identified
October 14, 2022 as the final EIS issuance date. However, numerous
comments filed during the draft EIS comment period require additional
time for Commission staff's analysis. As a result, staff has revised
the schedule for issuance of the final EIS.
Schedule for Environmental Review
Issuance of the Notice of Availability of the final EIS--November 18,
2022
90-day Federal Authorization Decision Deadline \1\--February 16, 2023
---------------------------------------------------------------------------
\1\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
project's progress.
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP22-2), and follow the
[[Page 62404]]
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: October 7, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-22365 Filed 10-13-22; 8:45 am]
BILLING CODE 6717-01-P