Gas Transmission Northwest LLC; Notice of Revised Schedule for Environmental Review of the GTN XPress Project, 62403-62404 [2022-22365]

Download as PDF Federal Register / Vol. 87, No. 198 / Friday, October 14, 2022 / Notices must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 7, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–22350 Filed 10–13–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TX23–2–000] EnerSmart Imperial Beach BESS LLC; Notice of Filing jspears on DSK121TN23PROD with NOTICES Take notice that on October 6, 2022, pursuant to section 211 of the Federal Power Act,1 and Section 9.3.3 of the San Diego Gas & Electric Company (SDG&E) Transmission Owner Tariff (SDG&E TO Tariff), and Section 4 of the SDG&E Wholesale Distribution Open Access Tariff (SDG&E Tariffs), EnerSmart Imperial Beach BESS LLC (EnerSmart Imperial Beach) filed an application requesting that the Federal Energy Regulatory Commission (Commission) issue an order requiring SDG&E to provide interconnection and transmission service for the proposed Imperial Beach BESS battery energy storage facility under the terms and conditions of the Transmission Control Agreement between SDG&E and the California Independent System Operator Corporation (CAISO), the SDG&E Tariffs, CAISO’s Fifth Replacement FERC Electric Tariff, and the Small Generator Interconnection Agreements between EnerSmart Imperial Beach and SDG&E, dated May 31, 2022, as it may be in effect from time to time.2 1 16 U.S.C. 824j (2018). SGIA is associated with application numbers W192 and W193 for two 3 MW battery energy storage facilities, interconnecting at two points of interconnection, specified as (i) an extension of Imperial Beach circuit 158 from the manhole M1528073924 and (ii) an extension of Imperial Beach circuit 532 from the manhole M1526873925. 2 The VerDate Sep<11>2014 17:22 Oct 13, 2022 Jkt 259001 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on November 7, 2022. Dated: October 7, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–22351 Filed 10–13–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 62403 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–2–000] Gas Transmission Northwest LLC; Notice of Revised Schedule for Environmental Review of the GTN XPress Project This notice provides the Federal Energy Regulatory Commission staff’s revised schedule for completion of the environmental impact statement (EIS) for Gas Transmission Northwest LLC’s (GTN) GTN XPress Project. The Notice of Intent issued on January 21, 2022 identified October 14, 2022 as the final EIS issuance date. However, numerous comments filed during the draft EIS comment period require additional time for Commission staff’s analysis. As a result, staff has revised the schedule for issuance of the final EIS. Schedule for Environmental Review Issuance of the Notice of Availability of the final EIS—November 18, 2022 90-day Federal Authorization Decision Deadline 1—February 16, 2023 If a schedule change becomes necessary, an additional notice will be provided so that the relevant agencies are kept informed of the project’s progress. Additional Information In order to receive notification of the issuance of the EIS and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP22–2), and follow the 1 The Commission’s deadline applies to the decisions of other federal agencies, and state agencies acting under federally delegated authority, that are responsible for federal authorizations, permits, and other approvals necessary for proposed projects under the Natural Gas Act. Per 18 CFR 157.22(a), the Commission’s deadline for other agency’s decisions applies unless a schedule is otherwise established by federal law. E:\FR\FM\14OCN1.SGM 14OCN1 62404 Federal Register / Vol. 87, No. 198 / Friday, October 14, 2022 / Notices instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: October 7, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–22365 Filed 10–13–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TX23–1–000] jspears on DSK121TN23PROD with NOTICES EnerSmart Mesa Heights BESS LLC; Notice of Filing Take notice that on October 6, 2022, pursuant to section 211 of the Federal Power Act,1 and Section 9.3.3 of the San Diego Gas & Electric Company (SDG&E) Transmission Owner Tariff (SDG&E TO Tariff), and Section 4 of the SDG&E Wholesale Distribution Open Access Tariff (SDG&E Tariffs), EnerSmart Mesa Heights BESS LLC (EnerSmart Mesa Heights) filed an application requesting that the Federal Energy Regulatory Commission (Commission) issue an order requiring SDG&E to provide interconnection and transmission service for the proposed Mesa Heights BESS battery energy storage facility under the terms and conditions of the Transmission Control Agreement between SDG&E and the California Independent System Operator Corporation (CAISO), the SDG&E Tariffs, CAISO’s Fifth Replacement FERC Electric Tariff, and the Small Generator Interconnection Agreement between EnerSmart Mesa Heights and SDG&E, dated May 31, 2022, as it may be in effect from time to time.2 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to 1 16 U.S.C. 824j (2018). SGIA is associated with application number W162 for the 3 MW battery energy storage facility, interconnecting at a single point of interconnection, specified as an extension of Mesa Heights circuit 1286 from the nearby pole P95664. SGIA at Attachment 2. 2 The VerDate Sep<11>2014 17:22 Oct 13, 2022 Jkt 259001 become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on November 7, 2022. Dated: October 7, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–22349 Filed 10–13–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC22–22–000] Commission Information Collection Activities (Ferc–539), Comment Request; Extension Federal Energy Regulatory Commission, DOE. AGENCY: PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 Notice of information collection and request for comments. ACTION: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC– 539 (Gas Pipeline Certificates: Import & Export Related Applications), which will be submitted to the Office of Management and Budget (OMB). The Commission published a 60-day notice in the Federal Register on August 1, 2022 and received no comments on the 60-day notice. DATES: Comments on the collection of information are due November 14, 2022. ADDRESSES: Send written comments on FERC 539 to OMB through www.reginfo.gov/public/do/PRAMain, Attention: Federal Energy Regulatory Commission Desk Officer. Please identify the OMB Control Number 1902–0062 (Gas Pipeline Certificates: Import & Export Related Applications) in the subject line. Your comments should be sent within 30 days of publication of this notice in the Federal Register. Please submit copies of your comments (identified by Docket No. IC22–22–000 and the form) to the Commission as noted below. Electronic filing through https://www.ferc.gov, is preferred. • Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format. • For those unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery. Æ Mail via U.S. Postal Service only, addressed to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Æ Hand (including courier) delivery to: Federal Energy Regulatory Commission, Secretary of the Commission, 12225 Wilkins Avenue, Rockville, MD 20852. Please reference the specific collection number(s) and/or title(s) in your comments. Instructions: OMB submissions must be formatted and filed in accordance with submission guidelines at: www.reginfo.gov/public/do/PRAMain. Using the search function under the ‘‘Currently Under Review field,’’ select Federal Energy Regulatory Commission; click ‘‘submit’’ and select ‘‘comment’’ to the right of the subject collection. FERC submissions must be formatted and filed SUMMARY: E:\FR\FM\14OCN1.SGM 14OCN1

Agencies

[Federal Register Volume 87, Number 198 (Friday, October 14, 2022)]
[Notices]
[Pages 62403-62404]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-22365]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP22-2-000]


Gas Transmission Northwest LLC; Notice of Revised Schedule for 
Environmental Review of the GTN XPress Project

    This notice provides the Federal Energy Regulatory Commission 
staff's revised schedule for completion of the environmental impact 
statement (EIS) for Gas Transmission Northwest LLC's (GTN) GTN XPress 
Project. The Notice of Intent issued on January 21, 2022 identified 
October 14, 2022 as the final EIS issuance date. However, numerous 
comments filed during the draft EIS comment period require additional 
time for Commission staff's analysis. As a result, staff has revised 
the schedule for issuance of the final EIS.

Schedule for Environmental Review

Issuance of the Notice of Availability of the final EIS--November 18, 
2022
90-day Federal Authorization Decision Deadline \1\--February 16, 2023
---------------------------------------------------------------------------

    \1\ The Commission's deadline applies to the decisions of other 
federal agencies, and state agencies acting under federally 
delegated authority, that are responsible for federal 
authorizations, permits, and other approvals necessary for proposed 
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the 
Commission's deadline for other agency's decisions applies unless a 
schedule is otherwise established by federal law.

    If a schedule change becomes necessary, an additional notice will 
be provided so that the relevant agencies are kept informed of the 
project's progress.

Additional Information

    In order to receive notification of the issuance of the EIS and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP22-2), and follow the

[[Page 62404]]

instructions. For assistance with access to eLibrary, the helpline can 
be reached at (866) 208-3676, TTY (202) 502-8659, or at 
[email protected]. The eLibrary link on the FERC website also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: October 7, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-22365 Filed 10-13-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.