EnerSmart Imperial Beach BESS LLC; Notice of Filing, 62403 [2022-22351]
Download as PDF
Federal Register / Vol. 87, No. 198 / Friday, October 14, 2022 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–22350 Filed 10–13–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. TX23–2–000]
EnerSmart Imperial Beach BESS LLC;
Notice of Filing
jspears on DSK121TN23PROD with NOTICES
Take notice that on October 6, 2022,
pursuant to section 211 of the Federal
Power Act,1 and Section 9.3.3 of the San
Diego Gas & Electric Company (SDG&E)
Transmission Owner Tariff (SDG&E TO
Tariff), and Section 4 of the SDG&E
Wholesale Distribution Open Access
Tariff (SDG&E Tariffs), EnerSmart
Imperial Beach BESS LLC (EnerSmart
Imperial Beach) filed an application
requesting that the Federal Energy
Regulatory Commission (Commission)
issue an order requiring SDG&E to
provide interconnection and
transmission service for the proposed
Imperial Beach BESS battery energy
storage facility under the terms and
conditions of the Transmission Control
Agreement between SDG&E and the
California Independent System Operator
Corporation (CAISO), the SDG&E
Tariffs, CAISO’s Fifth Replacement
FERC Electric Tariff, and the Small
Generator Interconnection Agreements
between EnerSmart Imperial Beach and
SDG&E, dated May 31, 2022, as it may
be in effect from time to time.2
1 16
U.S.C. 824j (2018).
SGIA is associated with application
numbers W192 and W193 for two 3 MW battery
energy storage facilities, interconnecting at two
points of interconnection, specified as (i) an
extension of Imperial Beach circuit 158 from the
manhole M1528073924 and (ii) an extension of
Imperial Beach circuit 532 from the manhole
M1526873925.
2 The
VerDate Sep<11>2014
17:22 Oct 13, 2022
Jkt 259001
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern
Time on November 7, 2022.
Dated: October 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–22351 Filed 10–13–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
62403
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–2–000]
Gas Transmission Northwest LLC;
Notice of Revised Schedule for
Environmental Review of the GTN
XPress Project
This notice provides the Federal
Energy Regulatory Commission staff’s
revised schedule for completion of the
environmental impact statement (EIS)
for Gas Transmission Northwest LLC’s
(GTN) GTN XPress Project. The Notice
of Intent issued on January 21, 2022
identified October 14, 2022 as the final
EIS issuance date. However, numerous
comments filed during the draft EIS
comment period require additional time
for Commission staff’s analysis. As a
result, staff has revised the schedule for
issuance of the final EIS.
Schedule for Environmental Review
Issuance of the Notice of Availability of
the final EIS—November 18, 2022
90-day Federal Authorization Decision
Deadline 1—February 16, 2023
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP22–2), and follow the
1 The Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 87, Number 198 (Friday, October 14, 2022)]
[Notices]
[Page 62403]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-22351]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. TX23-2-000]
EnerSmart Imperial Beach BESS LLC; Notice of Filing
Take notice that on October 6, 2022, pursuant to section 211 of the
Federal Power Act,\1\ and Section 9.3.3 of the San Diego Gas & Electric
Company (SDG&E) Transmission Owner Tariff (SDG&E TO Tariff), and
Section 4 of the SDG&E Wholesale Distribution Open Access Tariff (SDG&E
Tariffs), EnerSmart Imperial Beach BESS LLC (EnerSmart Imperial Beach)
filed an application requesting that the Federal Energy Regulatory
Commission (Commission) issue an order requiring SDG&E to provide
interconnection and transmission service for the proposed Imperial
Beach BESS battery energy storage facility under the terms and
conditions of the Transmission Control Agreement between SDG&E and the
California Independent System Operator Corporation (CAISO), the SDG&E
Tariffs, CAISO's Fifth Replacement FERC Electric Tariff, and the Small
Generator Interconnection Agreements between EnerSmart Imperial Beach
and SDG&E, dated May 31, 2022, as it may be in effect from time to
time.\2\
---------------------------------------------------------------------------
\1\ 16 U.S.C. 824j (2018).
\2\ The SGIA is associated with application numbers W192 and
W193 for two 3 MW battery energy storage facilities, interconnecting
at two points of interconnection, specified as (i) an extension of
Imperial Beach circuit 158 from the manhole M1528073924 and (ii) an
extension of Imperial Beach circuit 532 from the manhole
M1526873925.
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant. On or before the comment date, it is
not necessary to serve motions to intervene or protests on persons
other than the Applicant.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically may mail
similar pleadings to the Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Hand delivered submissions in
docketed proceedings should be delivered to Health and Human Services,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern Time on November 7, 2022.
Dated: October 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-22351 Filed 10-13-22; 8:45 am]
BILLING CODE 6717-01-P