Projects Approved for Minor Modifications, 62175 [2022-22247]

Download as PDF Federal Register / Vol. 87, No. 197 / Thursday, October 13, 2022 / Notices surface water withdrawal of up to 0.500 mgd (peak day) (Docket No. 20171209). 12. Project Sponsor: The United States Department of Veterans Affairs. Project Facility: Indiantown Gap National Cemetery, East Hanover and Union Townships, Lebanon County, Pa. Application for consumptive use of up to 0.099 mgd (30-day average). 13. Project Sponsor: Veolia Water Pennsylvania, Inc. Project Facility: Grantham Operation, Upper Allen Township, Cumberland County, Pa. Application for renewal of groundwater withdrawal of up to 0.395 mgd (30-day average) from Well 2 (Docket No. 19901104). Project Scheduled for Action Involving a Diversion 14. Project Sponsor and Facility: BlueTriton Brands, Inc. (Valley View Springs), Hegins Township, Schuylkill County, Pa. Application for approval of an out-of-basin diversion of up to 0.200 mgd (peak day). khammond on DSKJM1Z7X2PROD with NOTICES Opportunity To Appear and Comment Interested parties may call into the hearing to offer comments to the Commission on any business listed above, including the fee schedule, required to be the subject of a public hearing. Given the nature of the meeting, the Commission strongly encourages those members of the public wishing to provide oral comments to pre-register with the Commission by emailing Jason Oyler at joyler@srbc.net prior to the hearing date. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Access to the hearing via telephone will begin at 2:15 p.m. Guidelines for the public hearing are posted on the Commission’s website, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement such guidelines at the hearing. Written comments on any business listed above required to be the subject of a public hearing may also be mailed to Mr. Jason Oyler, Secretary to the Commission, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, Pa. 17110–1788, or submitted electronically through https://www.srbc.net/ regulatory/public-comment/. Comments mailed or electronically submitted must be received by the Commission on or before November 14, 2021, to be considered. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. VerDate Sep<11>2014 17:49 Oct 12, 2022 Jkt 259001 Dated: October 7, 2022. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2022–22245 Filed 10–12–22; 8:45 am] 62175 TENNESSEE VALLEY AUTHORITY Meeting of the Regional Resource Stewardship Council and the Regional Energy Resource Council Tennessee Valley Authority (TVA). ACTION: Notice of Federal advisory committee meeting. AGENCY: BILLING CODE 7040–01–P SUSQUEHANNA RIVER BASIN COMMISSION The TVA Regional Resource Stewardship Council (RRSC) and Regional Energy Resource Council (RERC) will hold a combined meeting of both councils on November 3, 2022, to seek advice on environmental justice issues in the Tennessee Valley and discuss TVA’s sustainability and biodiversity programs. DATES: The meeting will be held in Nashville, Tennessee, at Sonesta Nashville Airport hotel on Thursday, November 3, 2022, from 8:30 a.m. to 5:00 p.m. C.T. RRSC and RERC council members are invited to attend the meeting in person. The public is invited to view the meeting virtually or to attend in-person. Since TVA will not have a public comment session during the meeting, we invite written comments to be submitted by October 31, 2022, by email to Bekim Haliti at bhaliti@tva.gov or mail to Regional Energy Resource Council, Tennessee Valley Authority, 400 West Summit Hill Drive, WT 9D, Knoxville Tennessee 37902. Health and safety protocols may be required for those who attend inperson as TVA is following CDC guidance on masking and social distancing. A link and instructions to view the meeting will be posted on TVA’s RRSC website at www.tva.gov/ rrsc and TVA’s RERC website at www.tva.gov/rerc at least one week prior to the scheduled meeting. ADDRESSES: The public is invited to view the meeting virtually or attend in person. The in-person meeting will be held in the Sonesta Nashville Airport hotel at 600 Marriott Dr., Nashville, TN 37214. Due to space constraints, anyone wishing to attend in person must preregister by 5:00 p.m. E.T. Monday, October 31, 2022, by emailing bhaliti@ tva.gov. Anyone needing special accommodations should let the contact below know at least one week in advance. SUMMARY: Projects Approved for Minor Modifications Susquehanna River Basin Commission. AGENCY: ACTION: Notice. This notice lists the minor modifications approved for a previously approved project by the Susquehanna River Basin Commission during the period set forth in DATES. SUMMARY: DATES: August 1–September 30, 2022 Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110–1788. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423, ext. 1312; fax (717) 238–2436; email: joyler@srbc.net. Regular mail inquiries may be sent to the above address. This notice lists previously approved projects, receiving approval of minor modifications, described below, pursuant to 18 CFR 806.18 or to Commission Resolution Nos. 2013–11 and 2015–06 for the time period specified above. 1. Safe Harbor Water Power Corporation—Safe Harbor Hydroelectric Project, Docket No. 19980501, York and Lancaster Counties, Pa.; correction to change expiration and renewal deadline dates; Correction Issue Date: August 24, 2022. 2. Schuylkill Energy Resources, Inc., Docket No. 20220919, Mahanoy Township, Schuylkill County, Pa.; modification approval to change the consumptive use mitigation method; Approval Date: September 27, 2022. SUPPLEMENTARY INFORMATION: Authority: Public Law 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806 and 808. Dated: October 7, 2022. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2022–22247 Filed 10–12–22; 8:45 am] BILLING CODE 7040–01–P PO 00000 Frm 00110 Fmt 4703 Sfmt 4703 FOR FURTHER INFORMATION CONTACT: Bekim Haliti, bhaliti@tva.gov, 931–349– 1894. SUPPLEMENTARY INFORMATION: The RERC was established to advise TVA on its energy resource activities and the priorities among competing objectives and values. The RRSC was established E:\FR\FM\13OCN1.SGM 13OCN1

Agencies

[Federal Register Volume 87, Number 197 (Thursday, October 13, 2022)]
[Notices]
[Page 62175]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-22247]


-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Projects Approved for Minor Modifications

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: This notice lists the minor modifications approved for a 
previously approved project by the Susquehanna River Basin Commission 
during the period set forth in DATES.

DATES: August 1-September 30, 2022

ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street, 
Harrisburg, PA 17110-1788.

FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and 
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax 
(717) 238-2436; email: [email protected]. Regular mail inquiries may be 
sent to the above address.

SUPPLEMENTARY INFORMATION: This notice lists previously approved 
projects, receiving approval of minor modifications, described below, 
pursuant to 18 CFR 806.18 or to Commission Resolution Nos. 2013-11 and 
2015-06 for the time period specified above.
    1. Safe Harbor Water Power Corporation--Safe Harbor Hydroelectric 
Project, Docket No. 19980501, York and Lancaster Counties, Pa.; 
correction to change expiration and renewal deadline dates; Correction 
Issue Date: August 24, 2022.
    2. Schuylkill Energy Resources, Inc., Docket No. 20220919, Mahanoy 
Township, Schuylkill County, Pa.; modification approval to change the 
consumptive use mitigation method; Approval Date: September 27, 2022.

    Authority:  Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR 
parts 806 and 808.

    Dated: October 7, 2022.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2022-22247 Filed 10-12-22; 8:45 am]
BILLING CODE 7040-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.