Crete Energy Venture, LLC; Lincoln Generating Facility, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 59411 [2022-21198]

Download as PDF Federal Register / Vol. 87, No. 189 / Friday, September 30, 2022 / Notices respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: September 26, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–21286 Filed 9–29–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL22–84–000] jspears on DSK121TN23PROD with NOTICES Crete Energy Venture, LLC; Lincoln Generating Facility, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date On August 31, 2022, the Commission issued an order in Docket No. EL22–84– 000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, instituting an investigation into whether Crete Energy Venture, LLC and Lincoln Generating Facility, LLC’s informational filings relating to their rate schedules for Reactive Supply and Voltage Control from Generation Sources Service are unjust, unreasonable, unduly discriminatory or preferential, or otherwise unlawful and to establish a refund effective date.1 El Paso Electric Company, 180 FERC ¶ 61,150 (2022). The refund effective date in Docket No. EL22–84–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL22–84–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2021), within 21 days of the date of issuance of the order. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFile’’ link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Dated: August 31, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–21198 Filed 9–29–22; 8:45 am] BILLING CODE 6717–01–P 1 The section 206 investigation will extend to any affiliate of Applicant with market-based rate authorization. VerDate Sep<11>2014 18:52 Sep 29, 2022 Jkt 256001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 59411 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC22–124–000. Applicants: SR Cedar Springs, LLC, SR Clay, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of SR Cedar Springs, LLC, et al. Filed Date: 9/23/22. Accession Number: 20220923–5209. Comment Date: 5 p.m. ET 10/14/22. Docket Numbers: EC22–125–000. Applicants: Wisconsin Power and Light Company, WPL Bear Creek Solar, LLC, WPL Wood County Solar, LLC, WPL North Rock Solar, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Wisconsin Power and Light Company, et al. Filed Date: 9/23/22. Accession Number: 20220923–5210. Comment Date: 5 p.m. ET 10/14/22. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG22–226–000. Applicants: Jicarilla Solar 1 LLC. Description: Jicarilla Solar 1 LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 9/23/22. Accession Number: 20220923–5197. Comment Date: 5 p.m. ET 10/14/22. Docket Numbers: EG22–227–000. Applicants: Jicarilla Storage 1 LLC. Description: Jicarilla Storage 1 LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 9/23/22. Accession Number: 20220923–5199. Comment Date: 5 p.m. ET 10/14/22. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2269–002; ER10–2447–002; ER10–2937–001; ER10–2938–001; ER10–2948–001; ER10–2962–002; ER10–2967–001; ER12–1359–001; ER13–2199–001. Applicants: Allegany Generating Station LLC, Alliance NYGT, LLC, Seneca Power Partners, L.P., Sterling Power Partners, L.P., AG-Energy, L.P., Alliance Energy Marketing, LLC, AER NY-Gen, LLC, Power City Partners, L.P., Carthage Energy, LLC. Description: Notice of Change in Status of Carthage Energy, LLC, et al. E:\FR\FM\30SEN1.SGM 30SEN1

Agencies

[Federal Register Volume 87, Number 189 (Friday, September 30, 2022)]
[Notices]
[Page 59411]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-21198]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL22-84-000]


Crete Energy Venture, LLC; Lincoln Generating Facility, LLC; 
Notice of Institution of Section 206 Proceeding and Refund Effective 
Date

    On August 31, 2022, the Commission issued an order in Docket No. 
EL22-84-000, pursuant to section 206 of the Federal Power Act (FPA), 16 
U.S.C. 824e, instituting an investigation into whether Crete Energy 
Venture, LLC and Lincoln Generating Facility, LLC's informational 
filings relating to their rate schedules for Reactive Supply and 
Voltage Control from Generation Sources Service are unjust, 
unreasonable, unduly discriminatory or preferential, or otherwise 
unlawful and to establish a refund effective date.\1\ El Paso Electric 
Company, 180 FERC ] 61,150 (2022).
---------------------------------------------------------------------------

    \1\ The section 206 investigation will extend to any affiliate 
of Applicant with market-based rate authorization.
---------------------------------------------------------------------------

    The refund effective date in Docket No. EL22-84-000, established 
pursuant to section 206(b) of the FPA, will be the date of publication 
of this notice in the Federal Register.
    Any interested person desiring to be heard in Docket No. EL22-84-
000 must file a notice of intervention or motion to intervene, as 
appropriate, with the Federal Energy Regulatory Commission, in 
accordance with Rule 214 of the Commission's Rules of Practice and 
Procedure, 18 CFR 385.214 (2021), within 21 days of the date of 
issuance of the order.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFile'' link at 
https://www.ferc.gov. In lieu of electronic filing, you may submit a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.

    Dated: August 31, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-21198 Filed 9-29-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.