Crete Energy Venture, LLC; Lincoln Generating Facility, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 59411 [2022-21198]
Download as PDF
Federal Register / Vol. 87, No. 189 / Friday, September 30, 2022 / Notices
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: September 26, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–21286 Filed 9–29–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL22–84–000]
jspears on DSK121TN23PROD with NOTICES
Crete Energy Venture, LLC; Lincoln
Generating Facility, LLC; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On August 31, 2022, the Commission
issued an order in Docket No. EL22–84–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, instituting an investigation into
whether Crete Energy Venture, LLC and
Lincoln Generating Facility, LLC’s
informational filings relating to their
rate schedules for Reactive Supply and
Voltage Control from Generation
Sources Service are unjust,
unreasonable, unduly discriminatory or
preferential, or otherwise unlawful and
to establish a refund effective date.1 El
Paso Electric Company, 180 FERC
¶ 61,150 (2022).
The refund effective date in Docket
No. EL22–84–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL22–84–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2021),
within 21 days of the date of issuance
of the order.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: August 31, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–21198 Filed 9–29–22; 8:45 am]
BILLING CODE 6717–01–P
1 The section 206 investigation will extend to any
affiliate of Applicant with market-based rate
authorization.
VerDate Sep<11>2014
18:52 Sep 29, 2022
Jkt 256001
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
59411
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–124–000.
Applicants: SR Cedar Springs, LLC,
SR Clay, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of SR Cedar Springs,
LLC, et al.
Filed Date: 9/23/22.
Accession Number: 20220923–5209.
Comment Date: 5 p.m. ET 10/14/22.
Docket Numbers: EC22–125–000.
Applicants: Wisconsin Power and
Light Company, WPL Bear Creek Solar,
LLC, WPL Wood County Solar, LLC,
WPL North Rock Solar, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Wisconsin Power
and Light Company, et al.
Filed Date: 9/23/22.
Accession Number: 20220923–5210.
Comment Date: 5 p.m. ET 10/14/22.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–226–000.
Applicants: Jicarilla Solar 1 LLC.
Description: Jicarilla Solar 1 LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/23/22.
Accession Number: 20220923–5197.
Comment Date: 5 p.m. ET 10/14/22.
Docket Numbers: EG22–227–000.
Applicants: Jicarilla Storage 1 LLC.
Description: Jicarilla Storage 1 LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/23/22.
Accession Number: 20220923–5199.
Comment Date: 5 p.m. ET 10/14/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2269–002;
ER10–2447–002; ER10–2937–001;
ER10–2938–001; ER10–2948–001;
ER10–2962–002; ER10–2967–001;
ER12–1359–001; ER13–2199–001.
Applicants: Allegany Generating
Station LLC, Alliance NYGT, LLC,
Seneca Power Partners, L.P., Sterling
Power Partners, L.P., AG-Energy, L.P.,
Alliance Energy Marketing, LLC, AER
NY-Gen, LLC, Power City Partners, L.P.,
Carthage Energy, LLC.
Description: Notice of Change in
Status of Carthage Energy, LLC, et al.
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 87, Number 189 (Friday, September 30, 2022)]
[Notices]
[Page 59411]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-21198]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL22-84-000]
Crete Energy Venture, LLC; Lincoln Generating Facility, LLC;
Notice of Institution of Section 206 Proceeding and Refund Effective
Date
On August 31, 2022, the Commission issued an order in Docket No.
EL22-84-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e, instituting an investigation into whether Crete Energy
Venture, LLC and Lincoln Generating Facility, LLC's informational
filings relating to their rate schedules for Reactive Supply and
Voltage Control from Generation Sources Service are unjust,
unreasonable, unduly discriminatory or preferential, or otherwise
unlawful and to establish a refund effective date.\1\ El Paso Electric
Company, 180 FERC ] 61,150 (2022).
---------------------------------------------------------------------------
\1\ The section 206 investigation will extend to any affiliate
of Applicant with market-based rate authorization.
---------------------------------------------------------------------------
The refund effective date in Docket No. EL22-84-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL22-84-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, in
accordance with Rule 214 of the Commission's Rules of Practice and
Procedure, 18 CFR 385.214 (2021), within 21 days of the date of
issuance of the order.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Dated: August 31, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-21198 Filed 9-29-22; 8:45 am]
BILLING CODE 6717-01-P