MountainWest Overthrust Pipeline, LLC; Notice of Initiation of Section 5 Proceeding, 58779-58780 [2022-21002]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 187 / Wednesday, September 28, 2022 / Notices
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Willie
Whittlesey, General Manager, Yuba
County Water Agency, (530) 741–5026,
wwhittlesey@yubawater.org.
i. FERC Contact: Jonathan Schram,
(202) 502–8264, jonathan.schram@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
October 20, 2022.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2246–098. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee requests a temporary variance
of its winter pulse flow requirement.
Specifically, the licensee proposes to
forego its required 1,000 cubic feet per
second (cfs) flow pulse from January 1–
15, 2023. The licensee proposes to
instead, release a flow of 700 cfs in the
lower Yuba River from Englebright Dam.
In addition, the licensee requests that
compliance during the variance period
VerDate Sep<11>2014
18:06 Sep 27, 2022
Jkt 256001
be based on the 5-day running average
of daily average flows, with the 15minute flow not less than 90 percent of
the adjusted flow requirement. The
licensee requests the variance in order
to conserve limited water resources at
the project as a result of current drought
conditions.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
58779
Dated: September 20, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20953 Filed 9–27–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP22–1118–000]
MountainWest Overthrust Pipeline,
LLC; Notice of Initiation of Section 5
Proceeding
On September 22, 2022, the
Commission issued an order in Docket
No. RP22–1118–000, pursuant to section
5 of the Natural Gas Act, 15 U.S.C. 717d,
instituting an investigation into whether
the rates currently charged by
MountainWest Overthrust Pipeline, LLC
are just and reasonable. MountainWest
Overthrust Pipeline, LLC, 180 FERC
¶ 61,174 (2022).
Any interested person desiring to be
heard in Docket No. RP22–1118–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, in accordance with Rule
214 of the Commission’s Rules of
Practice and Procedure, 18 CFR 385.214
(2021), within 30 days of the date of
issuance of the order.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
E:\FR\FM\28SEN1.SGM
28SEN1
58780
Federal Register / Vol. 87, No. 187 / Wednesday, September 28, 2022 / Notices
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: September 22, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–21002 Filed 9–27–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4718–039]
lotter on DSK11XQN23PROD with NOTICES1
Cocheco Falls Associates; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
relicense application for the Cocheco
Falls Dam Hydroelectric Project No.
4718 (project), located on the Cocheco
River in the City of Dover, Strafford
County, New Hampshire, and has
prepared an Environmental Assessment
(EA) for the project. No federal land
would be occupied by the project.
The EA contains staff’s analysis of the
potential environmental effects of the
project and concludes that licensing the
project, with appropriate environmental
protection measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, toll-free
at (866) 208–3676, or for TTY, (202)
502–8659.
You may register online at https://
ferconline.ferc.gov/eSubscription.aspx
to be notified via email of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Any comments should be filed within
45 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
VerDate Sep<11>2014
18:06 Sep 27, 2022
Jkt 256001
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
eFiling.aspx. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://ferconline.
ferc.gov/QuickComment.aspx. You must
include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. In lieu of
electronic filings, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–4718–
039.
For further information, contact Arash
Barsari at (202) 502–6207, or by email
at Arash.JalaliBarsari@ferc.gov.
Dated: September 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20920 Filed 9–27–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–72–000.
Applicants: NorthWestern
Corporation.
Description: NorthWestern
Corporation submits supplemental
filing, providing draft accounting entries
that will be filed in final form for
Reconstructing.
Filed Date: 9/7/22.
Accession Number: 20220907–5116.
Comment Date: 5 p.m. ET 9/28/22.
Docket Numbers: EC22–123–000.
Applicants: Flat Ridge 2 Wind Energy
LLC, Flat Ridge Interconnection LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Flat Ridge 2 Wind
Energy LLC, et al.
Filed Date: 9/21/22.
Accession Number: 20220921–5131.
Comment Date: 5 p.m. ET 10/12/22.
Take notice that the Commission
received the following exempt
wholesale generator filings:
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Docket Numbers: EG22–225–000.
Applicants: Yellowbud Solar, LLC.
Description: Yellowbud Solar, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/22/22.
Accession Number: 20220922–5096.
Comment Date: 5 p.m. ET 10/13/22.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL22–89–000.
Applicants: Cage Ranch Solar, LLC
and Cage Ranch Solar II, LLC Vs.
Southwest Power Pool, Inc.
Description: Complaint of Cage Ranch
Solar, LLC and Cage Ranch Solar II, LLC
v. Southwest Power Pool, Inc.
Filed Date: 9/20/22.
Accession Number: 20220920–5130.
Comment Date: 5 p.m. ET 10/11/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2514–006.
Applicants: PEI Power II, LLC.
Description: Compliance filing: PEI
Power II MBR Change in Category to be
effective 9/23/2022.
Filed Date: 9/22/22.
Accession Number: 20220922–5022.
Comment Date: 5 p.m. ET 10/13/22.
Docket Numbers: ER11–3108–002.
Applicants: Innovative Energy
Systems, LLC.
Description: Compliance filing:
Innovative Energy Systems MBR Change
in Category to be effective 9/23/2022.
Filed Date: 9/22/22.
Accession Number: 20220922–5023.
Comment Date: 5 p.m. ET 10/13/22.
Docket Numbers: ER11–3109–002.
Applicants: Seneca Energy, II LLC.
Description: Compliance filing:
Seneca MBR Change in Category Filing
to be effective 9/23/2022.
Filed Date: 9/22/22.
Accession Number: 20220922–5025.
Comment Date: 5 p.m. ET 10/13/22.
Docket Numbers: ER22–1990–000.
Applicants: DTE Electric Company.
Description: Refund Report: Refund
Report Filing to be effective N/A.
Filed Date: 9/22/22.
Accession Number: 20220922–5131.
Comment Date: 5 p.m. ET 10/13/22.
Docket Numbers: ER22–2806–001.
Applicants: American Electric Power
Service Corporation, Appalachian
Power Company, PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
American Electric Power Service
Corporation submits tariff filing per
35.17(b): AEP submits amendment to
amended ILDSA, SA No. 1252 in ER22–
2806 to be effective 9/1/2022.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 87, Number 187 (Wednesday, September 28, 2022)]
[Notices]
[Pages 58779-58780]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-21002]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP22-1118-000]
MountainWest Overthrust Pipeline, LLC; Notice of Initiation of
Section 5 Proceeding
On September 22, 2022, the Commission issued an order in Docket No.
RP22-1118-000, pursuant to section 5 of the Natural Gas Act, 15 U.S.C.
717d, instituting an investigation into whether the rates currently
charged by MountainWest Overthrust Pipeline, LLC are just and
reasonable. MountainWest Overthrust Pipeline, LLC, 180 FERC ] 61,174
(2022).
Any interested person desiring to be heard in Docket No. RP22-1118-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, in
accordance with Rule 214 of the Commission's Rules of Practice and
Procedure, 18 CFR 385.214 (2021), within 30 days of the date of
issuance of the order.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
[[Page 58780]]
1A, Washington, DC 20426. Submissions sent via any other carrier must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
Dated: September 22, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-21002 Filed 9-27-22; 8:45 am]