Combined Notice of Filings, 57691-57692 [2022-20354]
Download as PDF
Federal Register / Vol. 87, No. 182 / Wednesday, September 21, 2022 / Notices
57691
1093RD—MEETING, OPEN MEETING—Continued
[September 22, 2022, 10:00 a.m.]
Item No.
Docket No.
E–4 ....................
ER22–2044–000 ......................................
ER22–2044–001.
Omitted.
ER22–2380–000 ......................................
NJ22–11–000 ..........................................
ER19–1428–005 ......................................
ER21–1816–001 ......................................
ER20–681–005 ........................................
ER20–681–006.
EL22–28–000.
ER21–57–002 ..........................................
ER21–42–001 ..........................................
ER21–46–001 ..........................................
ER18–2358–001 ......................................
ER19–1357–000 ......................................
ER20–1313–000 (consolidated).
ER22–1353–000 ......................................
ER21–1438–000 ......................................
E–5 ....................
E–6 ....................
E–7 ....................
E–8 ....................
E–9 ....................
E–10 ..................
E–11
E–12
E–13
E–14
..................
..................
..................
..................
E–15 ..................
E–16 ..................
Company
Just Energy Limited.
Virginia Electric and Power Company.
Orlando Utilities Commission.
ISO New England Inc.
KES Kingsburg, L.P.
Tri-State Generation and Transmission Association, Inc.
Shell Energy North America (US), L.P.
Tenaska Power Services Co.
Mercuria Energy America, LLC.
Southwest Power Pool, Inc.
GridLiance High Plains LLC.
GridLiance High Plains LLC.
GridLiance High Plains LLC.
GAS
G–1 ....................
G–2 ....................
RP22–1118–000 ......................................
RP22–1121–000 ......................................
MountainWest Overthrust Pipeline, LLC.
Stagecoach Pipeline & Storage Company LLC.
HYDRO
H–1 ....................
H–2 ....................
H–3 ....................
P–3777–013 ............................................
P–619–174 ..............................................
P–2530–057 ............................................
The Town of Rollinsford, New Hampshire.
Pacific Gas and Electric Company and City of Santa Clara.
Brookfield White Pine Hydro LLC.
CERTIFICATES
C–1 ....................
C–2 ....................
khammond on DSKJM1Z7X2PROD with NOTICES
C–3 ....................
C–4 ....................
C–5 ....................
C–6 ....................
C–7 ....................
C–8 ....................
C–9 ....................
C–10 ..................
CP20–527–001 ........................................
CP20–50–001 ..........................................
CP20–51–001 ..........................................
CP21–463–000 ........................................
CP22–479–000 ........................................
CP22–451–000 ........................................
RP22–678–000 ........................................
CP21–44–000 ..........................................
CP22–474–000 ........................................
CP22–475–000 ........................................
CP22–476–000 ........................................
A free webcast of this event is
available through https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
VerDate Sep<11>2014
19:54 Sep 20, 2022
Jkt 256001
Columbia Gulf Transmission, LLC.
Tennessee Gas Pipeline Company, L.L.C.
Southern Natural Gas Company, L.L.C.
Texas Eastern Transmission, LP.
ETC Texas Pipeline, Ltd.
Owen Stanley Parker v. Permain Highway Pipeline LLC, et al.
Hummel Generation, LLC v. UGI Sunbury, LLC.
LA Storage, LLC.
West Texas Gas, Inc. and West Texas Gas Utility, LLC.
West Texas Gas, Inc. and West Texas Gas Utility, LLC.
West Texas Gas, Inc. and West Texas Gas Utility, LLC.
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
Issued: September 15, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20493 Filed 9–19–22; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Filings Instituting Proceedings
Docket Numbers: RP22–1213–000.
Applicants: ABCGrande, LLC v.
Northern Border Pipeline Company.
Description: Complaint of
ABCGrande, LLC v. Northern Border
Pipeline Company.
Filed Date: 9/13/22.
Accession Number: 20220913–5127.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: RP22–1214–000.
Applicants: Eastern Shore Natural Gas
Company.
Description: § 4(d) Rate Filing: Capital
Cost Surcharge #2 True-Up to be
effective 10/15/2022.
Filed Date: 9/14/22.
Accession Number: 20220914–5029.
Comment Date: 5 p.m. ET 9/26/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
E:\FR\FM\21SEN1.SGM
21SEN1
57692
Federal Register / Vol. 87, No. 182 / Wednesday, September 21, 2022 / Notices
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 14, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–20354 Filed 9–20–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER22–2850–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Fall River Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Fall
River Solar, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 4,
2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
VerDate Sep<11>2014
19:54 Sep 20, 2022
Jkt 256001
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: September 14, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–20353 Filed 9–20–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–113–000]
Alliance Pipeline, L.P.; Notice
Suspending Environmental Review
Schedule of the Proposed Three Rivers
Interconnection Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) is suspending the
environmental review schedule of the
Three Rivers Interconnection Project
(Project) involving construction and
operation of facilities by Alliance
Pipeline, L.P. (Alliance) in Grundy
County, Illinois. The Notice of Intent to
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Prepare an Environmental Impact
Statement for the Proposed Three Rivers
Interconnection Project, Request for
Comments on Environmental Issues,
and Schedule for Environmental
Review, issued on February 10, 2022,
identified a September 16, 2022 final
Environmental Impact Statement (EIS)
issuance date. As stated in the notice,
the Project would be located in the
vicinity of a facility regulated by the
Nuclear Regulatory Commission which
could require the completion of a safety
analysis, and additional time may be
necessary to consider the results of that
analysis.
In its most recent response to FERC
staff’s request concerning the status of
this safety analysis, Alliance stated that
it anticipated that the operator of the
nearby nuclear facility (Constellation
Energy Generation, LLC) would finalize
the required safety analysis by the end
of August 2022. However, to date, the
safety analysis remains outstanding.
Therefore, the Commission will
suspend the environmental review
schedule for the Project. Once Alliance
provides the outstanding information,
the Commission will issue a revised
schedule for the final EIS. This is not a
suspension of the Commission staff’s
review of the Project. Staff will continue
to process Alliance’s proposal to the
extent possible based upon the
information filed to date while awaiting
the remaining information.
Additional Information
Additional information about the
Project are available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field (i.e., CP21–113–000). Be sure you
have selected an appropriate date range.
For assistance, please contact FERC
Online Support at FercOnlineSupport@
ferc.gov or (866) 208–3676, or for TTY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
all formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: September 15, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20409 Filed 9–20–22; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\21SEN1.SGM
21SEN1
Agencies
[Federal Register Volume 87, Number 182 (Wednesday, September 21, 2022)]
[Notices]
[Pages 57691-57692]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-20354]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22-1213-000.
Applicants: ABCGrande, LLC v. Northern Border Pipeline Company.
Description: Complaint of ABCGrande, LLC v. Northern Border
Pipeline Company.
Filed Date: 9/13/22.
Accession Number: 20220913-5127.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: RP22-1214-000.
Applicants: Eastern Shore Natural Gas Company.
Description: Sec. 4(d) Rate Filing: Capital Cost Surcharge #2
True-Up to be effective 10/15/2022.
Filed Date: 9/14/22.
Accession Number: 20220914-5029.
Comment Date: 5 p.m. ET 9/26/22.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211
[[Page 57692]]
and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on
or before 5 p.m. eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 14, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-20354 Filed 9-20-22; 8:45 am]
BILLING CODE 6717-01-P