Combined Notice of Filings #1, 56942-56943 [2022-20073]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
56942
Federal Register / Vol. 87, No. 179 / Friday, September 16, 2022 / Notices
m. The application is not ready for
environmental analysis at this time.
n. The existing Hackett Mills Project
consists of: (1) a 186-foot-long dam that
consists of two spillway sections: a 101foot-long, 8-foot-high rock filled timber
crib dam with an uncontrolled spillway
(main spillway section) and a 85-footlong, 8-foot-high concrete gravity dam
with three uncontrolled bays (secondary
spillway section); (2) an obsolete sluice
gatehouse that connects the main
spillway and the secondary spillway
sections; (3) a 3.5-mile-long, 60-acre
impoundment with no useable storage
capacity at a normal maximum water
surface elevation of 234.75 feet National
Geodetic Vertical Datum of 1929 (NGVD
29); (4) a canal intake gate structure
containing five gates; (5) a 100-foot-long,
25-foot-wide, 10-foot-deep power canal;
(6) a powerhouse located at the end of
the canal containing one 485-kilowatt
right angle drive bulb turbine-generator
unit, with a minimum hydraulic
capacity of 80 cubic-feet-per-second
(cfs) and a maximum hydraulic capacity
of 474 cfs; (7) a downstream fish passage
facility; (8) a 200-foot-long, 12.5-kilovolt
transmission line; and (9) appurtenant
facilities.
The Hackett Mills Project is currently
operated in a run-of-river mode and
generates 1,602 megawatt-hours
annually. Hackett Mills Hydro proposes
to continue operating the project as a
run-of-river facility and does not
propose any new construction to the
project.
o. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document (P–6398). For assistance,
contact FERC at FERCOnlineSupport@
ferc.gov, or call toll-free, (866) 208–3676
or (202) 502–8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Additional Study Requests due—
October 31, 2022
Issue Deficiency Letter (if necessary)—
November 2022
Request Additional Information—
November 2022
Issue Scoping Document 1 for
comments—February 2023
VerDate Sep<11>2014
16:43 Sep 15, 2022
Jkt 256001
Comments on Scoping Document 1—
March 2023
Issue Acceptance Notice and Letter—
April 2023
Issue Scoping Document 2 (if
necessary)—April 2023
Issue Notice of Ready for Environmental
Analysis—April 2023
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: September 12, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20065 Filed 9–15–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–118–000.
Applicants: Eastover Solar LLC, PGR
2021 Lessee 17, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Eastover Solar
LLC.
Filed Date: 9/9/22.
Accession Number: 20220909–5209.
Comment Date: 5 p.m. ET 9/30/22.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–217–000.
Applicants: Yellow Pine Solar, LLC.
Description: Yellow Pine Solar, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/9/22.
Accession Number: 20220909–5166.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: EG22–218–000.
Applicants: Mesquite Solar 4, LLC.
Description: Mesquite Solar 4, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/12/22.
Accession Number: 20220912–5049.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: EG22–219–000.
Applicants: Mesquite Solar 5, LLC.
Description: Self-Certification of EG
for Mesquite Solar 5, LLC.
Filed Date: 9/12/22.
Accession Number: 20220912–5139.
Comment Date: 5 p.m. ET 10/3/22.
Take notice that the Commission
received the following electric rate
filings:
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Docket Numbers: ER22–2525–000.
Applicants: Gridmatic Inc.
Description: Supplement to July 29,
2022, Gridmatic Inc. tariff filing per
35.12: MBR Tariff Application.
Filed Date: 9/7/22.
Accession Number: 20220907–5119.
Comment Date: 5 p.m. ET 9/19/22.
Docket Numbers: ER22–2829–000.
Applicants: American Electric Power
Service Corporation, Ohio Power
Company, AEP Ohio Transmission
Company, Inc., PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
American Electric Power Service
Corporation submits tariff filing per
35.13(a)(2)(iii: AEP submits Two FAs re:
ILDSA SA No. 1336 to be effective 11/
12/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5026.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2830–000.
Applicants: The Connecticut Light
and Power Company.
Description: § 205(d) Rate Filing: New
York Transco LLC—Engineering, Design
and Procurement Agreement to be
effective 9/13/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5068.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2831–000.
Applicants: ISO New England Inc.,
Vermont Transco LLC.
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: Vermont Transco
LLC; Tariff Clean-Up Filing to be
effective 5/1/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5080.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2832–000.
Applicants: Cardinal Point LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
Filing to be effective 10/31/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5084.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2833–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Middleton
Solar Farm LGIA Filing to be effective
8/26/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5091.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2834–000.
Applicants: ISO New England Inc.,
Green Mountain Power Corporation.
E:\FR\FM\16SEN1.SGM
16SEN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 179 / Friday, September 16, 2022 / Notices
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: Green Mountain
Power; Tariff Clean-Up Filing to be
effective 5/1/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5094.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2835–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Colstrip Trans System LGIA—
Concurrence GB Energy to be effective
8/22/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5117.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2836–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–09–12_RPU Remove LIBOR and
Correction Filing to be effective 1/1/
2023.
Filed Date: 9/12/22.
Accession Number: 20220912–5126.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2837–000.
Applicants: Desert Sunlight 250, LLC.
Description: § 205(d) Rate Filing: A&R
LGIA Co-Tenancy Agreement to be
effective 9/13/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5142.
Comment Date: 5 p.m. ET 10/3/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 12, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–20073 Filed 9–15–22; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:43 Sep 15, 2022
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–509–000]
Sierra Club, Natural Resources
Defense Council; Notice of Petition for
Declaratory Order
Take notice that on September 7,
2022, pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, Sierra Club and
Natural Resources Defense Council
(Petitioners) filed a petition for
declaratory order requesting the
Commission issue an order stating that
the Fortress Liquefied Natural Gas
(LNG) export project, which includes
the Wyalusing gas liquefaction facility
in Pennsylvania, and Gibbstown LNG
export facility in New Jersey, is subject
to the Commission’s jurisdiction under
section 3 of the Natural Gas Act.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene, or protest must serve a
copy of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
56943
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
tollfree, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5 p.m. eastern time on
October 12, 2022.
Dated: September 12, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–20072 Filed 9–15–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10256–003]
City of Tacoma, Department of Public
Utilities, Light Division, TPU Water
Division; Notice of Transfer of
Exemption
1. On August 19, 2022, City of
Tacoma, Department of Public Utilities,
Light Division (City of Tacoma)
exemptee for the 850-Kilowatt Hood
Street Hydroelectric Project No. 10256,
filed a letter notifying the Commission
that the project was transferred from
City of Tacoma to TPU Water Division.
The exemption from licensing was
originally issued on August 17, 1987.1
The project is located on the Tacoma
Water Transmission System in Pierce
County, Washington. The transfer of an
exemption does not require Commission
approval.
2. TPU Water Division is now the
exemptee of the Hood Street
Hydroelectric Project No. 10256. All
correspondence must be forwarded to
Mr. Travis Nelson, TPU Water Division,
(d.b.a.—Tacoma Water), 3628 S 35th
Street, Tacoma, WA 98409, Phone: (253)
579–4082, Email: TNelson1@
cityoftacoma.org.
Dated: September 12, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20066 Filed 9–15–22; 8:45 am]
BILLING CODE 6717–01–P
1 City of Tacoma, Department of Public Utilities,
Light Division, 40 FERC ¶ 62,181 (1987).
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 87, Number 179 (Friday, September 16, 2022)]
[Notices]
[Pages 56942-56943]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-20073]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC22-118-000.
Applicants: Eastover Solar LLC, PGR 2021 Lessee 17, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Eastover Solar LLC.
Filed Date: 9/9/22.
Accession Number: 20220909-5209.
Comment Date: 5 p.m. ET 9/30/22.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG22-217-000.
Applicants: Yellow Pine Solar, LLC.
Description: Yellow Pine Solar, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 9/9/22.
Accession Number: 20220909-5166.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: EG22-218-000.
Applicants: Mesquite Solar 4, LLC.
Description: Mesquite Solar 4, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 9/12/22.
Accession Number: 20220912-5049.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: EG22-219-000.
Applicants: Mesquite Solar 5, LLC.
Description: Self-Certification of EG for Mesquite Solar 5, LLC.
Filed Date: 9/12/22.
Accession Number: 20220912-5139.
Comment Date: 5 p.m. ET 10/3/22.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER22-2525-000.
Applicants: Gridmatic Inc.
Description: Supplement to July 29, 2022, Gridmatic Inc. tariff
filing per 35.12: MBR Tariff Application.
Filed Date: 9/7/22.
Accession Number: 20220907-5119.
Comment Date: 5 p.m. ET 9/19/22.
Docket Numbers: ER22-2829-000.
Applicants: American Electric Power Service Corporation, Ohio Power
Company, AEP Ohio Transmission Company, Inc., PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: American Electric Power
Service Corporation submits tariff filing per 35.13(a)(2)(iii: AEP
submits Two FAs re: ILDSA SA No. 1336 to be effective 11/12/2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5026.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2830-000.
Applicants: The Connecticut Light and Power Company.
Description: Sec. 205(d) Rate Filing: New York Transco LLC--
Engineering, Design and Procurement Agreement to be effective 9/13/
2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5068.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2831-000.
Applicants: ISO New England Inc., Vermont Transco LLC.
Description: Sec. 205(d) Rate Filing: ISO New England Inc. submits
tariff filing per 35.13(a)(2)(iii: Vermont Transco LLC; Tariff Clean-Up
Filing to be effective 5/1/2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5080.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2832-000.
Applicants: Cardinal Point LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Baseline Filing to be effective 10/31/2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5084.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2833-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Middleton Solar Farm LGIA
Filing to be effective 8/26/2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5091.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2834-000.
Applicants: ISO New England Inc., Green Mountain Power Corporation.
[[Page 56943]]
Description: Sec. 205(d) Rate Filing: ISO New England Inc. submits
tariff filing per 35.13(a)(2)(iii: Green Mountain Power; Tariff Clean-
Up Filing to be effective 5/1/2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5094.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2835-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: Colstrip Trans System LGIA--
Concurrence GB Energy to be effective 8/22/2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5117.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2836-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2022-09-12_RPU Remove LIBOR
and Correction Filing to be effective 1/1/2023.
Filed Date: 9/12/22.
Accession Number: 20220912-5126.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22-2837-000.
Applicants: Desert Sunlight 250, LLC.
Description: Sec. 205(d) Rate Filing: A&R LGIA Co-Tenancy
Agreement to be effective 9/13/2022.
Filed Date: 9/12/22.
Accession Number: 20220912-5142.
Comment Date: 5 p.m. ET 10/3/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 12, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-20073 Filed 9-15-22; 8:45 am]
BILLING CODE 6717-01-P