Hackett Mills Hydro Associates, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 56941-56942 [2022-20065]
Download as PDF
Federal Register / Vol. 87, No. 179 / Friday, September 16, 2022 / Notices
2. American Climate Partners is now
the exemptee of the Rapidan Mill
Hydroelectric Project No. 8402. All
correspondence must be forwarded to
Mr. Michael Collins, American Climate
Partners, 7026 Old Rapidan Road (State
Rt. 673), Rapidan, Virginia 22960,
Phone: (540) 672–2542, Email: info@
naturalcapital.us.
Dated: September 12, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20063 Filed 9–15–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER22–2824–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Yellow Pine Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Yellow
Pine Solar, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 3,
2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
VerDate Sep<11>2014
16:43 Sep 15, 2022
Jkt 256001
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: September 12, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–20075 Filed 9–15–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6398–026]
Hackett Mills Hydro Associates, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: P–6398–026.
c. Date filed: August 31, 2022.
d. Applicant: Hackett Mills Hydro
Associates, LLC (Hackett Mills Hydro).
e. Name of Project: Hackett Mills
Hydroelectric Project.
f. Location: On the Little
Androscoggin River, in the towns of
Poland and Minot, in Androscoggin
County, Maine. The project does not
occupy any federal land.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
56941
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Matthew Nini,
Hackett Mills Hydro Associates, LLC
c/o Eagle Creek Renewable Energy, LLC,
7315 Wisconsin Avenue, Suite 1100W,
Bethesda, Maryland 20814; phone: (973)
998–8171; email: matthew.nini@
eaglecreekre.com.
i. FERC Contact: John Matkowski at
(202) 502–8576 or john.matkowski@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: October 31, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Hackett Mills Hydroelectric Project (P–
6398–026).
E:\FR\FM\16SEN1.SGM
16SEN1
khammond on DSKJM1Z7X2PROD with NOTICES
56942
Federal Register / Vol. 87, No. 179 / Friday, September 16, 2022 / Notices
m. The application is not ready for
environmental analysis at this time.
n. The existing Hackett Mills Project
consists of: (1) a 186-foot-long dam that
consists of two spillway sections: a 101foot-long, 8-foot-high rock filled timber
crib dam with an uncontrolled spillway
(main spillway section) and a 85-footlong, 8-foot-high concrete gravity dam
with three uncontrolled bays (secondary
spillway section); (2) an obsolete sluice
gatehouse that connects the main
spillway and the secondary spillway
sections; (3) a 3.5-mile-long, 60-acre
impoundment with no useable storage
capacity at a normal maximum water
surface elevation of 234.75 feet National
Geodetic Vertical Datum of 1929 (NGVD
29); (4) a canal intake gate structure
containing five gates; (5) a 100-foot-long,
25-foot-wide, 10-foot-deep power canal;
(6) a powerhouse located at the end of
the canal containing one 485-kilowatt
right angle drive bulb turbine-generator
unit, with a minimum hydraulic
capacity of 80 cubic-feet-per-second
(cfs) and a maximum hydraulic capacity
of 474 cfs; (7) a downstream fish passage
facility; (8) a 200-foot-long, 12.5-kilovolt
transmission line; and (9) appurtenant
facilities.
The Hackett Mills Project is currently
operated in a run-of-river mode and
generates 1,602 megawatt-hours
annually. Hackett Mills Hydro proposes
to continue operating the project as a
run-of-river facility and does not
propose any new construction to the
project.
o. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document (P–6398). For assistance,
contact FERC at FERCOnlineSupport@
ferc.gov, or call toll-free, (866) 208–3676
or (202) 502–8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Additional Study Requests due—
October 31, 2022
Issue Deficiency Letter (if necessary)—
November 2022
Request Additional Information—
November 2022
Issue Scoping Document 1 for
comments—February 2023
VerDate Sep<11>2014
16:43 Sep 15, 2022
Jkt 256001
Comments on Scoping Document 1—
March 2023
Issue Acceptance Notice and Letter—
April 2023
Issue Scoping Document 2 (if
necessary)—April 2023
Issue Notice of Ready for Environmental
Analysis—April 2023
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: September 12, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–20065 Filed 9–15–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–118–000.
Applicants: Eastover Solar LLC, PGR
2021 Lessee 17, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Eastover Solar
LLC.
Filed Date: 9/9/22.
Accession Number: 20220909–5209.
Comment Date: 5 p.m. ET 9/30/22.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–217–000.
Applicants: Yellow Pine Solar, LLC.
Description: Yellow Pine Solar, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/9/22.
Accession Number: 20220909–5166.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: EG22–218–000.
Applicants: Mesquite Solar 4, LLC.
Description: Mesquite Solar 4, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/12/22.
Accession Number: 20220912–5049.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: EG22–219–000.
Applicants: Mesquite Solar 5, LLC.
Description: Self-Certification of EG
for Mesquite Solar 5, LLC.
Filed Date: 9/12/22.
Accession Number: 20220912–5139.
Comment Date: 5 p.m. ET 10/3/22.
Take notice that the Commission
received the following electric rate
filings:
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Docket Numbers: ER22–2525–000.
Applicants: Gridmatic Inc.
Description: Supplement to July 29,
2022, Gridmatic Inc. tariff filing per
35.12: MBR Tariff Application.
Filed Date: 9/7/22.
Accession Number: 20220907–5119.
Comment Date: 5 p.m. ET 9/19/22.
Docket Numbers: ER22–2829–000.
Applicants: American Electric Power
Service Corporation, Ohio Power
Company, AEP Ohio Transmission
Company, Inc., PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
American Electric Power Service
Corporation submits tariff filing per
35.13(a)(2)(iii: AEP submits Two FAs re:
ILDSA SA No. 1336 to be effective 11/
12/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5026.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2830–000.
Applicants: The Connecticut Light
and Power Company.
Description: § 205(d) Rate Filing: New
York Transco LLC—Engineering, Design
and Procurement Agreement to be
effective 9/13/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5068.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2831–000.
Applicants: ISO New England Inc.,
Vermont Transco LLC.
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: Vermont Transco
LLC; Tariff Clean-Up Filing to be
effective 5/1/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5080.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2832–000.
Applicants: Cardinal Point LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
Filing to be effective 10/31/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5084.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2833–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Middleton
Solar Farm LGIA Filing to be effective
8/26/2022.
Filed Date: 9/12/22.
Accession Number: 20220912–5091.
Comment Date: 5 p.m. ET 10/3/22.
Docket Numbers: ER22–2834–000.
Applicants: ISO New England Inc.,
Green Mountain Power Corporation.
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 87, Number 179 (Friday, September 16, 2022)]
[Notices]
[Pages 56941-56942]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-20065]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6398-026]
Hackett Mills Hydro Associates, LLC; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: P-6398-026.
c. Date filed: August 31, 2022.
d. Applicant: Hackett Mills Hydro Associates, LLC (Hackett Mills
Hydro).
e. Name of Project: Hackett Mills Hydroelectric Project.
f. Location: On the Little Androscoggin River, in the towns of
Poland and Minot, in Androscoggin County, Maine. The project does not
occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Matthew Nini, Hackett Mills Hydro Associates,
LLC c/o Eagle Creek Renewable Energy, LLC, 7315 Wisconsin Avenue, Suite
1100W, Bethesda, Maryland 20814; phone: (973) 998-8171; email:
[email protected].
i. FERC Contact: John Matkowski at (202) 502-8576 or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: October 31, 2022.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. All filings must clearly identify the project name and
docket number on the first page: Hackett Mills Hydroelectric Project
(P-6398-026).
[[Page 56942]]
m. The application is not ready for environmental analysis at this
time.
n. The existing Hackett Mills Project consists of: (1) a 186-foot-
long dam that consists of two spillway sections: a 101-foot-long, 8-
foot-high rock filled timber crib dam with an uncontrolled spillway
(main spillway section) and a 85-foot-long, 8-foot-high concrete
gravity dam with three uncontrolled bays (secondary spillway section);
(2) an obsolete sluice gatehouse that connects the main spillway and
the secondary spillway sections; (3) a 3.5-mile-long, 60-acre
impoundment with no useable storage capacity at a normal maximum water
surface elevation of 234.75 feet National Geodetic Vertical Datum of
1929 (NGVD 29); (4) a canal intake gate structure containing five
gates; (5) a 100-foot-long, 25-foot-wide, 10-foot-deep power canal; (6)
a powerhouse located at the end of the canal containing one 485-
kilowatt right angle drive bulb turbine-generator unit, with a minimum
hydraulic capacity of 80 cubic-feet-per-second (cfs) and a maximum
hydraulic capacity of 474 cfs; (7) a downstream fish passage facility;
(8) a 200-foot-long, 12.5-kilovolt transmission line; and (9)
appurtenant facilities.
The Hackett Mills Project is currently operated in a run-of-river
mode and generates 1,602 megawatt-hours annually. Hackett Mills Hydro
proposes to continue operating the project as a run-of-river facility
and does not propose any new construction to the project.
o. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov, using the ``eLibrary'' link. Enter the
docket number, excluding the last three digits in the docket number
field, to access the document (P-6398). For assistance, contact FERC at
[email protected], or call toll-free, (866) 208-3676 or (202)
502-8659 (TTY).
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Additional Study Requests due--October 31, 2022
Issue Deficiency Letter (if necessary)--November 2022
Request Additional Information--November 2022
Issue Scoping Document 1 for comments--February 2023
Comments on Scoping Document 1--March 2023
Issue Acceptance Notice and Letter--April 2023
Issue Scoping Document 2 (if necessary)--April 2023
Issue Notice of Ready for Environmental Analysis--April 2023
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: September 12, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-20065 Filed 9-15-22; 8:45 am]
BILLING CODE 6717-01-P