Combined Notice of Filings #1, 56643-56644 [2022-19970]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 178 / Thursday, September 15, 2022 / Notices
transparency into and cost effectiveness
of local and regional transmission
planning decisions, including: (1) the
role of cost management measures in
ensuring the cost-effective identification
of local transmission needs (e.g.,
planning criteria) and solutions to
address identified local transmission
and regional reliability-related
transmission needs; and (2) cost
considerations and the processes
through which transmission developers
recover their costs to ensure just and
reasonable transmission rates.
Additionally, this conference will also
discuss potential approaches to
providing enhanced cost management
measures and greater transparency and
oversight if needed to ensure just and
reasonable transmission rates.
Attached to this Supplemental Notice
is an agenda for the technical
conference, which includes the
conference program and expected
panelists.
Panelists are asked to submit advance
materials to provide any information
related to their respective panel (e.g.,
summary statements, reports,
whitepapers, studies, or testimonies)
that panelists believe should be
included in the record of this
proceeding by September 16, 2022.
Panelists should file all advance
materials in the AD22–8–000 docket.
An additional supplemental notice
will be issued following the technical
conference with the opportunity for
interested parties to submit posttechnical conference comments.
The technical conference will be open
to the public and there is no fee for
attendance. Information will also be
posted on the Calendar of Events on the
Commission’s website, www.ferc.gov,
prior to the event.
The workshop will be held at the
Commission on 888 First Street NE,
Washington, DC 20002. It will be
transcribed and webcast. Transcripts
will be available for a fee from Ace
Reporting (202–347–3700). A link to the
webcast of this event will be available
in the Commission Calendar of Events at
www.ferc.gov. The Capitol Connection
provides technical support for the
webcasts and offers the option of
listening to the workshop via phonebridge for a fee. For additional
information, visit
www.CapitolConnection.org or call (703)
993–3100.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov,
call toll-free (866) 208–3372 (voice) or
(202) 208–8659 (TTY), or send a fax to
VerDate Sep<11>2014
16:56 Sep 14, 2022
Jkt 256001
(202) 208–2106 with the required
accommodations.
For more information about this
technical conference, please contact
John Riehl at john.riehl@ferc.gov or
(202) 502–6026. For information related
to logistics, please contact Sarah
McKinley at sarah.mckinley@ferc.gov or
(202) 502–8368.
Dated: September 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–19922 Filed 9–14–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings in Existing Proceedings
Docket Numbers: RP19–351–006.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Compliance filing: 2022
Settlement Rates Docket No. RP19–351–
006 to be effective 11/1/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5034.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: RP22–1065–001.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Compliance filing: 9.9.22
Compliance Filing Implementing
Approved 2022 Rate Settlement to be
effective 10/1/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5008.
Comment Date: 5 p.m. ET 9/21/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
Filings Instituting Proceedings
Docket Numbers: PR22–62–000.
Applicants: The East Ohio Gas
Company.
Description: § 284.123 Rate Filing:
Operating Statement of The East Ohio
Gas Company 9/1/22 to be effective 9/
1/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5068.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: RP22–1207–000.
Applicants: Eastern Gas Transmission
and Storage, Inc.
Description: § 4(d) Rate Filing:
EGTS—September 9, 2022 Negotiated
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
56643
Rate and Nonconforming Service
Agreement to be effective 10/11/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5013.
Comment Date: 5 p.m. ET 9/21/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at:
https://www.ferc.gov/docs-filing/
efiling/filing-req.pdf. For other
information, call (866) 208–3676 (toll
free). For TTY, call (202) 502–8659.
Dated: September 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–19969 Filed 9–14–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3987–017;
ER11–4055–012; ER12–1566–016;
ER12–2051–003; ER12–2499–022;
ER13–764–022; ER14–1548–015; ER14–
1775–010; ER14–1927–010; ER12–2498–
022; ER16–1325–005; ER16–1326–005;
ER16–1327–005; ER17–382–007; ER17–
383–007; ER17–384–007; ER17–2141–
005; ER17–2142–005; ER17–2385–003;
ER18–855–006; ER18–1416–006.
Applicants: CED Wistaria Solar, LLC,
Panoche Valley Solar, LLC, Great Valley
Solar 3, LLC, Great Valley Solar 2, LLC,
Great Valley Solar 1, LLC, CED Ducor
Solar 3, LLC, CED Ducor Solar 2, LLC,
CED Ducor Solar 1, LLC, Copper
Mountain Solar 4, LLC , Mesquite Solar
3, LLC, Mesquite Solar 2, LLC, Alpaugh
50, LLC, CED White River Solar 2, LLC,
SEP II, LLC, Copper Mountain Solar 3,
LLC, CED White River Solar, LLC,
Alpaugh North, LLC, SPS Alpaugh 50,
LLC, Copper Mountain Solar 2, LLC,
E:\FR\FM\15SEN1.SGM
15SEN1
lotter on DSK11XQN23PROD with NOTICES1
56644
Federal Register / Vol. 87, No. 178 / Thursday, September 15, 2022 / Notices
Copper Mountain Solar 1, LLC,
Mesquite Solar 1, LLC.
Description: Triennial Market Power
Analysis for Southwest Region of
Mesquite Solar 1, LLC, et al.
Filed Date: 9/8/22.
Accession Number: 20220908–5156.
Comment Date: 5 p.m. ET 11/7/22.
Docket Numbers: ER21–2816–003.
Applicants: Gratiot County Wind LLC.
Description: Compliance filing:
Compliance Filing of Reactive Power
Rate Schedule to be effective 11/1/2021.
Filed Date: 9/9/22.
Accession Number: 20220909–5104.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–1014–002;
EL22–15–001.
Applicants: New York Power
Authority, Power Authority of the State
of New York, New York Independent
System Operator, Inc.
Description: New York Power
Authority Compliance Filing as required
by FERC’s March 11 and July 5, 2022
Orders.
Filed Date: 9/8/22.
Accession Number: 20220908–5154.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2158–001.
Applicants: Public Service Company
of New Mexico.
Description: Tariff Amendment: PNM
Response to August 12, 2022. Deficiency
Letter to be effective 6/22/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5049.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2818–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: ISA,
SA No. 6594; Queue No. AE2–334 &
AG1–103 to be effective 9/9/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5103.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2819–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, SA No. 6593; Queue No.
AC1–053 to be effective 8/9/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5105.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2821–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, Service
Agreement No. 6365; Queue No. AE2–
309 to be effective 1/17/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5033.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2822–000.
VerDate Sep<11>2014
16:56 Sep 14, 2022
Jkt 256001
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 6599; Queue
No. AG1–045 to be effective 8/26/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5058.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2823–000.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment:
Second Amend LGIA, Antelope 2 SolarTerminate eTariff Record (TOT762—
SA195) to be effective 9/10/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5064.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2824–000.
Applicants: Yellow Pine Solar, LLC.
Description: Baseline eTariff Filing:
Yellow Pine Solar, LLC Application for
Market-Based Rate Authorization to be
effective 11/9/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5078.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2825–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 6608; Queue
No. AH1–109 to be effective 8/10/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5087.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2826–000.
Applicants: Avista Corporation.
Description: § 205(d) Rate Filing:
Avista Corp LTF PTP Agreement T–
1197 to be effective 11/1/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5099.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2827–000.
Applicants: Bluegrass Solar, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 9/12/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5142.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2828–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: DEFBartow NITSA to be effective 9/1/2022.
Filed Date: 9/9/22.
Accession Number: 20220909–5143.
Comment Date: 5 p.m. ET 9/30/22.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF22–914–000.
Applicants: Bloom Energy
Corporation.
Description: Form 556 of Bloom
Energy Corporation [Kaiser Santa Rosa].
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Filed Date: 9/8/22.
Accession Number: 20220908–5130.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: QF22–915–000.
Applicants: Bloom Energy
Corporation.
Description: Form 556 of Bloom
Energy Corporation [Yale-New Haven].
Filed Date: 9/8/22.
Accession Number: 20220908–5149.
Comment Date: 5 p.m. ET 9/29/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at:https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–19970 Filed 9–14–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2955–011]
City of Watervliet; Notice of Settlement
Agreement and Soliciting
Comments
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project No.: 2955–011.
c. Date filed: September 2, 2022.
d. Applicant: City of Watervliet, New
York.
e. Name of Project: Normanskill
Hydroelectric Project.
f. Location: The existing project is
located on the Normans Kill in the
Town of Guilderland in Albany County,
New York and approximately 22.4 river
miles upstream of the mouth of the
E:\FR\FM\15SEN1.SGM
15SEN1
Agencies
[Federal Register Volume 87, Number 178 (Thursday, September 15, 2022)]
[Notices]
[Pages 56643-56644]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-19970]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-3987-017; ER11-4055-012; ER12-1566-016; ER12-
2051-003; ER12-2499-022; ER13-764-022; ER14-1548-015; ER14-1775-010;
ER14-1927-010; ER12-2498-022; ER16-1325-005; ER16-1326-005; ER16-1327-
005; ER17-382-007; ER17-383-007; ER17-384-007; ER17-2141-005; ER17-
2142-005; ER17-2385-003; ER18-855-006; ER18-1416-006.
Applicants: CED Wistaria Solar, LLC, Panoche Valley Solar, LLC,
Great Valley Solar 3, LLC, Great Valley Solar 2, LLC, Great Valley
Solar 1, LLC, CED Ducor Solar 3, LLC, CED Ducor Solar 2, LLC, CED Ducor
Solar 1, LLC, Copper Mountain Solar 4, LLC , Mesquite Solar 3, LLC,
Mesquite Solar 2, LLC, Alpaugh 50, LLC, CED White River Solar 2, LLC,
SEP II, LLC, Copper Mountain Solar 3, LLC, CED White River Solar, LLC,
Alpaugh North, LLC, SPS Alpaugh 50, LLC, Copper Mountain Solar 2, LLC,
[[Page 56644]]
Copper Mountain Solar 1, LLC, Mesquite Solar 1, LLC.
Description: Triennial Market Power Analysis for Southwest Region
of Mesquite Solar 1, LLC, et al.
Filed Date: 9/8/22.
Accession Number: 20220908-5156.
Comment Date: 5 p.m. ET 11/7/22.
Docket Numbers: ER21-2816-003.
Applicants: Gratiot County Wind LLC.
Description: Compliance filing: Compliance Filing of Reactive Power
Rate Schedule to be effective 11/1/2021.
Filed Date: 9/9/22.
Accession Number: 20220909-5104.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-1014-002; EL22-15-001.
Applicants: New York Power Authority, Power Authority of the State
of New York, New York Independent System Operator, Inc.
Description: New York Power Authority Compliance Filing as required
by FERC's March 11 and July 5, 2022 Orders.
Filed Date: 9/8/22.
Accession Number: 20220908-5154.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2158-001.
Applicants: Public Service Company of New Mexico.
Description: Tariff Amendment: PNM Response to August 12, 2022.
Deficiency Letter to be effective 6/22/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5049.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2818-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ISA, SA No. 6594; Queue No.
AE2-334 & AG1-103 to be effective 9/9/2022.
Filed Date: 9/8/22.
Accession Number: 20220908-5103.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2819-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original NSA, SA No. 6593;
Queue No. AC1-053 to be effective 8/9/2022.
Filed Date: 9/8/22.
Accession Number: 20220908-5105.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2821-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to WMPA, Service
Agreement No. 6365; Queue No. AE2-309 to be effective 1/17/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5033.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2822-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 6599;
Queue No. AG1-045 to be effective 8/26/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5058.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2823-000.
Applicants: Southern California Edison Company.
Description: Tariff Amendment: Second Amend LGIA, Antelope 2 Solar-
Terminate eTariff Record (TOT762--SA195) to be effective 9/10/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5064.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2824-000.
Applicants: Yellow Pine Solar, LLC.
Description: Baseline eTariff Filing: Yellow Pine Solar, LLC
Application for Market-Based Rate Authorization to be effective 11/9/
2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5078.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2825-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA SA No. 6608;
Queue No. AH1-109 to be effective 8/10/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5087.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2826-000.
Applicants: Avista Corporation.
Description: Sec. 205(d) Rate Filing: Avista Corp LTF PTP
Agreement T-1197 to be effective 11/1/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5099.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2827-000.
Applicants: Bluegrass Solar, LLC.
Description: Baseline eTariff Filing: Baseline new to be effective
9/12/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5142.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2828-000.
Applicants: Duke Energy Florida, LLC.
Description: Sec. 205(d) Rate Filing: DEF-Bartow NITSA to be
effective 9/1/2022.
Filed Date: 9/9/22.
Accession Number: 20220909-5143.
Comment Date: 5 p.m. ET 9/30/22.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF22-914-000.
Applicants: Bloom Energy Corporation.
Description: Form 556 of Bloom Energy Corporation [Kaiser Santa
Rosa].
Filed Date: 9/8/22.
Accession Number: 20220908-5130.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: QF22-915-000.
Applicants: Bloom Energy Corporation.
Description: Form 556 of Bloom Energy Corporation [Yale-New Haven].
Filed Date: 9/8/22.
Accession Number: 20220908-5149.
Comment Date: 5 p.m. ET 9/29/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at:https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-19970 Filed 9-14-22; 8:45 am]
BILLING CODE 6717-01-P