Combined Notice of Filings #1, 56646-56647 [2022-19923]
Download as PDF
56646
Federal Register / Vol. 87, No. 178 / Thursday, September 15, 2022 / Notices
Dated: September 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–19971 Filed 9–14–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER22–2799–000]
lotter on DSK11XQN23PROD with NOTICES1
VESI 21 LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of VESI 21
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
28, 2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
VerDate Sep<11>2014
16:56 Sep 14, 2022
Jkt 256001
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: September 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–19930 Filed 9–14–22; 8:45 am]
BILLING CODE 6717–01–P
April 2023.
May 2023.
July 2023.2
Any questions regarding this notice
may be directed to Quinn Emmering,
the Commission’s project coordinator
for licensing the Devil Canyon Project,
at (202) 502–6382 or at
quinn.emmering@ferc.gov.
BILLING CODE 6717–01–P
[Project No. 14797–001]
DEPARTMENT OF ENERGY
California Department of Water
Resources; Notice of Intent To Prepare
an Environmental Assessment
On November 20, 2019, the California
Department of Water Resources
(California DWR) filed an application
for a new major license for the existing
279.7-megawatt Devil Canyon Project
(FERC No. 14797).1 The Devil Canyon
Project is part of a larger water storage
and delivery system, the State Water
Project (SWP). The Devil Canyon Project
is located along the East Branch of the
SWP Aqueduct, in San Bernardino
County, California. The project occupies
220.98 acres of federal lands
administered by the U.S. Forest Service,
as part of the San Bernardino National
Forest.
In accordance with the Commission’s
regulations, on June 15, 2021,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
1 The proposed Devil Canyon Project is currently
licensed as part of the South SWP Hydropower
Project (FERC No. 2426). California DWR proposes
to relicense the Devil Canyon Project separately.
Fmt 4703
Commission issues draft EA ....
Comments on draft EA .............
Commission issues final EA .....
Target Date
[FR Doc. 2022–19985 Filed 9–14–22; 8:45 am]
Federal Energy Regulatory
Commission
Frm 00027
Milestone
Dated: September 9, 2022.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
PO 00000
staff intends to prepare a draft and final
Environmental Assessment (EA) on the
application to license the Devil Canyon
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Sfmt 4703
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–215–000.
Applicants: Eastover Solar LLC.
Description: Eastover Solar LLC
submits notice of Self-Certification of
Exempt Wholesale Generator.
Filed Date: 9/8/22.
Accession Number: 20220908–5070.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: EG22–216–000.
Applicants: PGR 2021 Lessee 17, LLC.
Description: PGR 2021 Lessee 17, LLC
submits notice of Self-Certification of
Exempt Wholesale Generator.
Filed Date: 9/8/22.
Accession Number: 20220908–5074.
Comment Date: 5 p.m. ET 9/29/22.
Take notice that the Commission
received the following electric rate
filings:
2 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare a draft and final EA for the Devil Canyon
Project. Therefore, in accordance with CEQ’s
regulations, the final EA must be issued within 1
year of the issuance date of this notice.
E:\FR\FM\15SEN1.SGM
15SEN1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 178 / Thursday, September 15, 2022 / Notices
Docket Numbers: ER10–2211–008.
Applicants: Vandolah Power
Company, L.L.C.
Description: Notice of Non-Material
Change in Status of Vandolah Power
Company, L.L.C.
Filed Date: 9/8/22.
Accession Number: 20220908–5078.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER21–291–002.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing: 2022–
09–08_PSCo Transmission Formula
Rate-Compliance to be effective 1/1/
2021.
Filed Date: 9/8/22.
Accession Number: 20220908–5064.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2148–001.
Applicants: Blooming Grove Wind
Energy Center LLC.
Description: Tariff Amendment:
Reactive Power Compensation to be
effective 6/18/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5075.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2811–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: DEFBartow FMPP FMPA Dynamic Transfer
Agreement RS No. 378 to be effective
11/7/2022.
Filed Date: 9/7/22.
Accession Number: 20220907–5100.
Comment Date: 5 p.m. ET 9/28/22.
Docket Numbers: ER22–2812–000.
Applicants: New England States
Committee on Electricity.
Description: New England States
Committee on Electricity submits for
information a Five-Year Pro Forma
Budget for years 2023–2027.
Filed Date: 9/6/22.
Accession Number: 20220906–5221.
Comment Date: 5 p.m. ET 9/27/22.
Docket Numbers: ER22–2813–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to the Membership Agreement
to Revise Sections 1.0 and 4.2 to be
effective 11/8/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5035.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2814–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Bylaws to Clarify
Membership on the Regional State
Committee to be effective 11/8/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5046.
VerDate Sep<11>2014
16:56 Sep 14, 2022
Jkt 256001
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2816–000.
Applicants: PGR 2021 Lessee 17, LLC.
Description: Baseline eTariff Filing:
PGR 2021 Lessee 17, LLC MBR Tariff to
be effective 10/31/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5082.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22–2817–000.
Applicants: Eastover Solar LLC.
Description: Baseline eTariff Filing:
Eastover Solar LLC MBR Tariff to be
effective 10/31/2022.
Filed Date: 9/8/22.
Accession Number: 20220908–5084.
Comment Date: 5 p.m. ET 9/29/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–19923 Filed 9–14–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD21–15–000]
Joint Federal-State Task Force on
Electric Transmission; Notice
Announcing Meeting and Inviting
Agenda Topics
On June 17, 2021, the Commission
established a Joint Federal-State Task
Force on Electric Transmission (Task
Force) to formally explore transmissionrelated topics outlined in the
Commission’s order.1 The Commission
1 Joint Fed.-State Task Force on Elec.
Transmission, 175 FERC ¶ 61,224 (2021)
(Establishing Order).
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
56647
stated that the Task Force will convene
for multiple formal meetings annually,
which will be open to the public for
listening and observing and on the
record.2 The next public meeting of the
Task Force will be held on November
15, 2022, at the New Orleans Marriott in
New Orleans, LA, from approximately
8:00 a.m. to 10:30 a.m. Central Time.
Commissioners may attend and
participate in this meeting.
The meeting will be open to the
public for listening and observing and
on the record. There is no fee for
attendance and registration is not
required. The public may attend in
person or via Webcast.3 This conference
will be transcribed. Transcripts will be
available for a fee from Ace Reporting,
202–347–3700.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
As explained in the Establishing
Order, the Commission will issue
agendas for each meeting of the Task
Force, after consulting with all Task
Force members and considering
suggestions from state commissions.4
The Establishing Order set forth a broad
array of transmission-related topics that
the Task Force has the authority to
examine with a focus on topics related
to planning and paying for transmission,
including transmission to facilitate
generator interconnection, that provides
benefits from a federal and state
perspective.5 All interested persons,
including all state commissioners, are
hereby invited to file comments in this
docket suggesting agenda items relating
to this topic by October 7, 2022. The
Task Force members will consider the
suggested agenda items in developing
the agenda for the November 15, 2022
public meeting. The agenda will be
issued in the above-captioned docket no
later than November 1, 2022, for the
meeting to be held on November 15,
2022.
Comments may be filed electronically
via the internet.6 Instructions are
available on the Commission’s website,
https://www.ferc.gov/ferc-online/
overview. For assistance, please contact
FERC Online Support at
2 Id.
P 4.
link to the Webcast will be available on the
day of the event at https://www.ferc.gov/TFSOET.
4 Establishing Order, 175 FERC ¶ 61,224 at PP 4,
7.
5 Id. P 6.
6 See 18 CFR 385.2001(a)(1)(iii) (2021).
3A
E:\FR\FM\15SEN1.SGM
15SEN1
Agencies
[Federal Register Volume 87, Number 178 (Thursday, September 15, 2022)]
[Notices]
[Pages 56646-56647]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-19923]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG22-215-000.
Applicants: Eastover Solar LLC.
Description: Eastover Solar LLC submits notice of Self-
Certification of Exempt Wholesale Generator.
Filed Date: 9/8/22.
Accession Number: 20220908-5070.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: EG22-216-000.
Applicants: PGR 2021 Lessee 17, LLC.
Description: PGR 2021 Lessee 17, LLC submits notice of Self-
Certification of Exempt Wholesale Generator.
Filed Date: 9/8/22.
Accession Number: 20220908-5074.
Comment Date: 5 p.m. ET 9/29/22.
Take notice that the Commission received the following electric
rate filings:
[[Page 56647]]
Docket Numbers: ER10-2211-008.
Applicants: Vandolah Power Company, L.L.C.
Description: Notice of Non-Material Change in Status of Vandolah
Power Company, L.L.C.
Filed Date: 9/8/22.
Accession Number: 20220908-5078.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER21-291-002.
Applicants: Public Service Company of Colorado.
Description: Compliance filing: 2022-09-08_PSCo Transmission
Formula Rate-Compliance to be effective 1/1/2021.
Filed Date: 9/8/22.
Accession Number: 20220908-5064.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2148-001.
Applicants: Blooming Grove Wind Energy Center LLC.
Description: Tariff Amendment: Reactive Power Compensation to be
effective 6/18/2022.
Filed Date: 9/8/22.
Accession Number: 20220908-5075.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2811-000.
Applicants: Duke Energy Florida, LLC.
Description: Sec. 205(d) Rate Filing: DEF-Bartow FMPP FMPA Dynamic
Transfer Agreement RS No. 378 to be effective 11/7/2022.
Filed Date: 9/7/22.
Accession Number: 20220907-5100.
Comment Date: 5 p.m. ET 9/28/22.
Docket Numbers: ER22-2812-000.
Applicants: New England States Committee on Electricity.
Description: New England States Committee on Electricity submits
for information a Five-Year Pro Forma Budget for years 2023-2027.
Filed Date: 9/6/22.
Accession Number: 20220906-5221.
Comment Date: 5 p.m. ET 9/27/22.
Docket Numbers: ER22-2813-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to the Membership
Agreement to Revise Sections 1.0 and 4.2 to be effective 11/8/2022.
Filed Date: 9/8/22.
Accession Number: 20220908-5035.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2814-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Bylaws to
Clarify Membership on the Regional State Committee to be effective 11/
8/2022.
Filed Date: 9/8/22.
Accession Number: 20220908-5046.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2816-000.
Applicants: PGR 2021 Lessee 17, LLC.
Description: Baseline eTariff Filing: PGR 2021 Lessee 17, LLC MBR
Tariff to be effective 10/31/2022.
Filed Date: 9/8/22.
Accession Number: 20220908-5082.
Comment Date: 5 p.m. ET 9/29/22.
Docket Numbers: ER22-2817-000.
Applicants: Eastover Solar LLC.
Description: Baseline eTariff Filing: Eastover Solar LLC MBR Tariff
to be effective 10/31/2022.
Filed Date: 9/8/22.
Accession Number: 20220908-5084.
Comment Date: 5 p.m. ET 9/29/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-19923 Filed 9-14-22; 8:45 am]
BILLING CODE 6717-01-P