Combined Notice of Filings #1, 56646-56647 [2022-19923]

Download as PDF 56646 Federal Register / Vol. 87, No. 178 / Thursday, September 15, 2022 / Notices Dated: September 9, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–19971 Filed 9–14–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER22–2799–000] lotter on DSK11XQN23PROD with NOTICES1 VESI 21 LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of VESI 21 LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 28, 2022. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all VerDate Sep<11>2014 16:56 Sep 14, 2022 Jkt 256001 interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: September 8, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–19930 Filed 9–14–22; 8:45 am] BILLING CODE 6717–01–P April 2023. May 2023. July 2023.2 Any questions regarding this notice may be directed to Quinn Emmering, the Commission’s project coordinator for licensing the Devil Canyon Project, at (202) 502–6382 or at quinn.emmering@ferc.gov. BILLING CODE 6717–01–P [Project No. 14797–001] DEPARTMENT OF ENERGY California Department of Water Resources; Notice of Intent To Prepare an Environmental Assessment On November 20, 2019, the California Department of Water Resources (California DWR) filed an application for a new major license for the existing 279.7-megawatt Devil Canyon Project (FERC No. 14797).1 The Devil Canyon Project is part of a larger water storage and delivery system, the State Water Project (SWP). The Devil Canyon Project is located along the East Branch of the SWP Aqueduct, in San Bernardino County, California. The project occupies 220.98 acres of federal lands administered by the U.S. Forest Service, as part of the San Bernardino National Forest. In accordance with the Commission’s regulations, on June 15, 2021, Commission staff issued a notice that the project was ready for environmental analysis (REA Notice). Based on the information in the record, including comments filed on the REA Notice, staff does not anticipate that licensing the project would constitute a major federal action significantly affecting the quality of the human environment. Therefore, 1 The proposed Devil Canyon Project is currently licensed as part of the South SWP Hydropower Project (FERC No. 2426). California DWR proposes to relicense the Devil Canyon Project separately. Fmt 4703 Commission issues draft EA .... Comments on draft EA ............. Commission issues final EA ..... Target Date [FR Doc. 2022–19985 Filed 9–14–22; 8:45 am] Federal Energy Regulatory Commission Frm 00027 Milestone Dated: September 9, 2022. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY PO 00000 staff intends to prepare a draft and final Environmental Assessment (EA) on the application to license the Devil Canyon Project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Sfmt 4703 Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG22–215–000. Applicants: Eastover Solar LLC. Description: Eastover Solar LLC submits notice of Self-Certification of Exempt Wholesale Generator. Filed Date: 9/8/22. Accession Number: 20220908–5070. Comment Date: 5 p.m. ET 9/29/22. Docket Numbers: EG22–216–000. Applicants: PGR 2021 Lessee 17, LLC. Description: PGR 2021 Lessee 17, LLC submits notice of Self-Certification of Exempt Wholesale Generator. Filed Date: 9/8/22. Accession Number: 20220908–5074. Comment Date: 5 p.m. ET 9/29/22. Take notice that the Commission received the following electric rate filings: 2 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the federal action agency’s decision to prepare an EA. This notice establishes the Commission’s intent to prepare a draft and final EA for the Devil Canyon Project. Therefore, in accordance with CEQ’s regulations, the final EA must be issued within 1 year of the issuance date of this notice. E:\FR\FM\15SEN1.SGM 15SEN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 178 / Thursday, September 15, 2022 / Notices Docket Numbers: ER10–2211–008. Applicants: Vandolah Power Company, L.L.C. Description: Notice of Non-Material Change in Status of Vandolah Power Company, L.L.C. Filed Date: 9/8/22. Accession Number: 20220908–5078. Comment Date: 5 p.m. ET 9/29/22. Docket Numbers: ER21–291–002. Applicants: Public Service Company of Colorado. Description: Compliance filing: 2022– 09–08_PSCo Transmission Formula Rate-Compliance to be effective 1/1/ 2021. Filed Date: 9/8/22. Accession Number: 20220908–5064. Comment Date: 5 p.m. ET 9/29/22. Docket Numbers: ER22–2148–001. Applicants: Blooming Grove Wind Energy Center LLC. Description: Tariff Amendment: Reactive Power Compensation to be effective 6/18/2022. Filed Date: 9/8/22. Accession Number: 20220908–5075. Comment Date: 5 p.m. ET 9/29/22. Docket Numbers: ER22–2811–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEFBartow FMPP FMPA Dynamic Transfer Agreement RS No. 378 to be effective 11/7/2022. Filed Date: 9/7/22. Accession Number: 20220907–5100. Comment Date: 5 p.m. ET 9/28/22. Docket Numbers: ER22–2812–000. Applicants: New England States Committee on Electricity. Description: New England States Committee on Electricity submits for information a Five-Year Pro Forma Budget for years 2023–2027. Filed Date: 9/6/22. Accession Number: 20220906–5221. Comment Date: 5 p.m. ET 9/27/22. Docket Numbers: ER22–2813–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to the Membership Agreement to Revise Sections 1.0 and 4.2 to be effective 11/8/2022. Filed Date: 9/8/22. Accession Number: 20220908–5035. Comment Date: 5 p.m. ET 9/29/22. Docket Numbers: ER22–2814–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to Bylaws to Clarify Membership on the Regional State Committee to be effective 11/8/2022. Filed Date: 9/8/22. Accession Number: 20220908–5046. VerDate Sep<11>2014 16:56 Sep 14, 2022 Jkt 256001 Comment Date: 5 p.m. ET 9/29/22. Docket Numbers: ER22–2816–000. Applicants: PGR 2021 Lessee 17, LLC. Description: Baseline eTariff Filing: PGR 2021 Lessee 17, LLC MBR Tariff to be effective 10/31/2022. Filed Date: 9/8/22. Accession Number: 20220908–5082. Comment Date: 5 p.m. ET 9/29/22. Docket Numbers: ER22–2817–000. Applicants: Eastover Solar LLC. Description: Baseline eTariff Filing: Eastover Solar LLC MBR Tariff to be effective 10/31/2022. Filed Date: 9/8/22. Accession Number: 20220908–5084. Comment Date: 5 p.m. ET 9/29/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 8, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–19923 Filed 9–14–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD21–15–000] Joint Federal-State Task Force on Electric Transmission; Notice Announcing Meeting and Inviting Agenda Topics On June 17, 2021, the Commission established a Joint Federal-State Task Force on Electric Transmission (Task Force) to formally explore transmissionrelated topics outlined in the Commission’s order.1 The Commission 1 Joint Fed.-State Task Force on Elec. Transmission, 175 FERC ¶ 61,224 (2021) (Establishing Order). PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 56647 stated that the Task Force will convene for multiple formal meetings annually, which will be open to the public for listening and observing and on the record.2 The next public meeting of the Task Force will be held on November 15, 2022, at the New Orleans Marriott in New Orleans, LA, from approximately 8:00 a.m. to 10:30 a.m. Central Time. Commissioners may attend and participate in this meeting. The meeting will be open to the public for listening and observing and on the record. There is no fee for attendance and registration is not required. The public may attend in person or via Webcast.3 This conference will be transcribed. Transcripts will be available for a fee from Ace Reporting, 202–347–3700. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–208–8659 (TTY), or send a fax to 202–208–2106 with the required accommodations. As explained in the Establishing Order, the Commission will issue agendas for each meeting of the Task Force, after consulting with all Task Force members and considering suggestions from state commissions.4 The Establishing Order set forth a broad array of transmission-related topics that the Task Force has the authority to examine with a focus on topics related to planning and paying for transmission, including transmission to facilitate generator interconnection, that provides benefits from a federal and state perspective.5 All interested persons, including all state commissioners, are hereby invited to file comments in this docket suggesting agenda items relating to this topic by October 7, 2022. The Task Force members will consider the suggested agenda items in developing the agenda for the November 15, 2022 public meeting. The agenda will be issued in the above-captioned docket no later than November 1, 2022, for the meeting to be held on November 15, 2022. Comments may be filed electronically via the internet.6 Instructions are available on the Commission’s website, https://www.ferc.gov/ferc-online/ overview. For assistance, please contact FERC Online Support at 2 Id. P 4. link to the Webcast will be available on the day of the event at https://www.ferc.gov/TFSOET. 4 Establishing Order, 175 FERC ¶ 61,224 at PP 4, 7. 5 Id. P 6. 6 See 18 CFR 385.2001(a)(1)(iii) (2021). 3A E:\FR\FM\15SEN1.SGM 15SEN1

Agencies

[Federal Register Volume 87, Number 178 (Thursday, September 15, 2022)]
[Notices]
[Pages 56646-56647]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-19923]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG22-215-000.
    Applicants: Eastover Solar LLC.
    Description: Eastover Solar LLC submits notice of Self-
Certification of Exempt Wholesale Generator.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5070.
    Comment Date: 5 p.m. ET 9/29/22.

    Docket Numbers: EG22-216-000.
    Applicants: PGR 2021 Lessee 17, LLC.
    Description: PGR 2021 Lessee 17, LLC submits notice of Self-
Certification of Exempt Wholesale Generator.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5074.
    Comment Date: 5 p.m. ET 9/29/22.

    Take notice that the Commission received the following electric 
rate filings:


[[Page 56647]]


    Docket Numbers: ER10-2211-008.
    Applicants: Vandolah Power Company, L.L.C.
    Description: Notice of Non-Material Change in Status of Vandolah 
Power Company, L.L.C.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5078.
    Comment Date: 5 p.m. ET 9/29/22.

    Docket Numbers: ER21-291-002.
    Applicants: Public Service Company of Colorado.
    Description: Compliance filing: 2022-09-08_PSCo Transmission 
Formula Rate-Compliance to be effective 1/1/2021.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5064.
    Comment Date: 5 p.m. ET 9/29/22.

    Docket Numbers: ER22-2148-001.
    Applicants: Blooming Grove Wind Energy Center LLC.
    Description: Tariff Amendment: Reactive Power Compensation to be 
effective 6/18/2022.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5075.
    Comment Date: 5 p.m. ET 9/29/22.

    Docket Numbers: ER22-2811-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: DEF-Bartow FMPP FMPA Dynamic 
Transfer Agreement RS No. 378 to be effective 11/7/2022.
    Filed Date: 9/7/22.
    Accession Number: 20220907-5100.
    Comment Date: 5 p.m. ET 9/28/22.

    Docket Numbers: ER22-2812-000.
    Applicants: New England States Committee on Electricity.
    Description: New England States Committee on Electricity submits 
for information a Five-Year Pro Forma Budget for years 2023-2027.
    Filed Date: 9/6/22.
    Accession Number: 20220906-5221.
    Comment Date: 5 p.m. ET 9/27/22.

    Docket Numbers: ER22-2813-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Revisions to the Membership 
Agreement to Revise Sections 1.0 and 4.2 to be effective 11/8/2022.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5035.
    Comment Date: 5 p.m. ET 9/29/22.

    Docket Numbers: ER22-2814-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Revisions to Bylaws to 
Clarify Membership on the Regional State Committee to be effective 11/
8/2022.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5046.
    Comment Date: 5 p.m. ET 9/29/22.

    Docket Numbers: ER22-2816-000.
    Applicants: PGR 2021 Lessee 17, LLC.
    Description: Baseline eTariff Filing: PGR 2021 Lessee 17, LLC MBR 
Tariff to be effective 10/31/2022.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5082.
    Comment Date: 5 p.m. ET 9/29/22.

    Docket Numbers: ER22-2817-000.
    Applicants: Eastover Solar LLC.
    Description: Baseline eTariff Filing: Eastover Solar LLC MBR Tariff 
to be effective 10/31/2022.
    Filed Date: 9/8/22.
    Accession Number: 20220908-5084.
    Comment Date: 5 p.m. ET 9/29/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-19923 Filed 9-14-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.