Combined Notice of Filings #1, 54995-54997 [2022-19389]

Download as PDF 54995 Federal Register / Vol. 87, No. 173 / Thursday, September 8, 2022 / Notices Æ Mail via U.S. Postal Service Only Addressed to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Æ Hand (including courier) delivery: Deliver to: Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. Instructions: OMB submissions must be formatted and filed in accordance with submission guidelines at www.reginfo.gov/public/ do/PRAMain. Using the search function under the ‘‘Currently Under Review field,’’ select Federal Energy Regulatory Commission; click ‘‘submit,’’ and select ‘‘comment’’ to the right of the subject collection. FERC submissions must be formatted and filed in accordance with submission guidelines at: https://www.ferc.gov. For user assistance, contact FERC Online Support by email at ferconlinesupport@ ferc.gov, or by phone at: (866) 208–3676 (toll-free). Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov and telephone at (202) 502–8663. SUPPLEMENTARY INFORMATION: Title: FERC–715, Annual Transmission Planning and Evaluation Report. OMB Control No.: 1902–0171. Abstract: Section 213(b) of the Federal Power Act 1 instructs the Commission to require transmitting utilities 2 to submit information annually about potentially available transmission capacity and known constraints. Such information must be available to potential transmission customers, State regulatory authorities, and the public. The Commission implements section 213(b) in accordance with the regulation at 18 CFR 141.300, which provides that the information collection applies to each transmitting utility that operates integrated transmission system facilities rated above 100 kilovolts (kV), and lists the following information that must be included in the annual submission: • Contact information; • Base case power flow data (if the respondent does not participate in the development and use of regional power flow data); • Transmission system maps and diagrams used by the respondent for transmission planning; • A detailed description of the transmission planning reliability criteria used to evaluate system performance for time frames and planning horizons used in regional and corporate planning; • A detailed description of the respondent’s transmission planning assessment practices (including, but not limited to, how reliability criteria are applied and the steps taken in performing transmission planning studies); and • A detailed evaluation of the respondent’s anticipated system performance as measured against its stated reliability criteria using its stated assessment practices. The information collected under FERC–715 assists the Commission in reviewing: • Rates and charges; • Disposition of jurisdictional facilities; • Consolidations and mergers; • Adequacy of supply; and • Reliability and security of the nation’s bulk power system. Without the FERC–715 data, the Commission would be less able to evaluate planned projects or requests related to transmission. Type of Respondent: Integrated transmission system facilities rated at or above 100 kilovolts (kV). Estimate of Annual Burden: 3 The Commission estimates the total annual burden and cost 4 for this information collection as follows. FERC–715, ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT Type of response Number of respondents Annual number of responses per respondent Total number of responses Average burden & cost per response Total annual burden hours & total annual cost Cost per respondent ($) (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) khammond on DSKJM1Z7X2PROD with NOTICES Annual Transmission Planning and Evaluation Report. 111 Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who 1 16 U.S.C. 824l(b) section 3(23) (16 U.S.C. 796(23)) defines ‘‘transmitting utility’’ as an entity that owns, operates, or controls facilities used for the transmission of electric energy in interstate 2 FPA VerDate Sep<11>2014 18:19 Sep 07, 2022 Jkt 256001 1 111 160 hrs.; $13,920 .. are to respond, including the use of automated collection techniques or other forms of information technology. Dated: September 1, 2022. Kimberly D. Bose, Secretary. 17,760 hrs.; $1,545,120. $13,920 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 [FR Doc. 2022–19405 Filed 9–7–22; 8:45 am] BILLING CODE 6717–01–P Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC22–116–000. Applicants: Evergy Missouri West, Inc., Persimmon Creek Wind Farm 1, LLC. commerce for the sale of electric energy at wholesale. 3 ‘‘Burden’’ is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 of what is included in the information collection burden, refer to 5 CFR 1320.3. 4 The Commission staff estimates that the industry’s hourly cost for wages plus benefits is similar to the Commission’s $87.00 FY 2021 average hourly cost for wages and benefits. E:\FR\FM\08SEN1.SGM 08SEN1 khammond on DSKJM1Z7X2PROD with NOTICES 54996 Federal Register / Vol. 87, No. 173 / Thursday, September 8, 2022 / Notices Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Evergy Missouri West, Inc., et al. Filed Date: 9/1/22. Accession Number: 20220901–5174. Comment Date: 5 p.m. ET 9/22/22. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG22–213–000. Applicants: BT Cunningham Storage, LLC. Description: BT Cunningham Storage, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 8/31/22. Accession Number: 20220831–5157. Comment Date: 5 p.m. ET 9/21/22. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER22–2758–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEFMt. Dora Reimbursement Agreement RS No. 366 to be effective 10/31/2022. Filed Date: 8/31/22. Accession Number: 20220831–5160. Comment Date: 5 p.m. ET 9/21/22. Docket Numbers: ER22–2759–000. Applicants: Eastman Cogeneration LP. Description: Market: Update of Market-Based Rate Tariff and Triennial Market Power Analysis to be effective 9/ 2/2022. Filed Date: 8/31/22. Accession Number: 20220831–5161. Comment Date: 5 p.m. ET 9/21/22. Docket Numbers: ER22–2760–000. Applicants: Public Service Company of New Mexico. Description: § 205(d) Rate Filing: Modifications P0695 and Operating Agreement to be effective 9/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5169. Comment Date: 5 p.m. ET 9/21/22. Docket Numbers: ER22–2761–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: 2022–08–31 Grand Valley-SISA-(T– 2022–3)–717–0.0.0 to be effective 9/1/ 2022. Filed Date: 8/31/22. Accession Number: 20220831–5184. Comment Date: 5 p.m. ET 9/21/22. Docket Numbers: ER22–2762–000. Applicants: Northwest Power Pool. Description: Baseline eTariff Filing: Western Power Pool Western Resource Adequacy Program Tariff to be effective 12/12/2022. Filed Date: 8/31/22. Accession Number: 20220831–5189. VerDate Sep<11>2014 18:19 Sep 07, 2022 Jkt 256001 Comment Date: 5 p.m. ET 9/30/22. Docket Numbers: ER22–2763–000. Applicants: Entergy Louisiana, LLC. Description: § 205(d) Rate Filing: ELL LCPS Reactive to be effective 11/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5193. Comment Date: 5 p.m. ET 9/21/22. Docket Numbers: ER22–2764–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Attachment X re to be effective 11/1/2022. Filed Date: 9/1/22. Accession Number: 20220901–5050. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2765–000. Applicants: Avista Corporation. Description: § 205(d) Rate Filing: Avista Corp FERC RS T1198 GB Energy Park LGIA Cert of Concurrence to be effective 8/22/2022. Filed Date: 9/1/22. Accession Number: 20220901–5076. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2766–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ISA, SA No. 6578; Queue No. AD1–088/AE2– 182 to be effective 8/3/2022. Filed Date: 9/1/22. Accession Number: 20220901–5093. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2767–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, SA No. 6580; Queue No. AE2–212 to be effective 8/3/2022. Filed Date: 9/1/22. Accession Number: 20220901–5096. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2768–000. Applicants: Midcontinent Independent System Operator, Inc., Missouri Joint Municipal Electric Utility Commission. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2022–09–01_Tariff Revisions to Incorporate Formula Rate for MJMEUC to be effective 12/31/9998. Filed Date: 9/1/22. Accession Number: 20220901–5097. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2770–000. Applicants: Georgia Power Company, Mississippi Power Company, Alabama Power Company. Description: § 205(d) Rate Filing: Georgia Power Company submits tariff filing per 35.13(a)(2)(iii: PEHA bn (Pepper Hammock II Solar) LGIA Filing to be effective 8/26/2022. PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Filed Date: 9/1/22. Accession Number: 20220901–5111. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2771–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: City of Hurricane Load Service Contract to be effective 9/1/2022. Filed Date: 9/1/22. Accession Number: 20220901–5124. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2772–000. Applicants: Consolidated Edison Company of New York, Inc. Description: § 205(d) Rate Filing: RC CDG rule changes 9–1–2022 to be effective 9/1/2022. Filed Date: 9/1/22. Accession Number: 20220901–5127. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2773–000. Applicants: Smoky Mountain Transmission LLC. Description: § 205(d) Rate Filing: Amended Interconnection Agreement to be effective 9/2/2022. Filed Date: 9/1/22. Accession Number: 20220901–5163. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2774–000. Applicants: Gibson City Energy Center, LLC. Description: § 205(d) Rate Filing: Normal filing 2022 to be effective 10/31/ 2022. Filed Date: 9/1/22. Accession Number: 20220901–5187. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2775–000. Applicants: PacifiCorp, Sierra Pacific Power Company, Nevada Power Company. Description: Joint Petition for Limited Waiver of PacifiCorp, et al. Filed Date: 9/1/22. Accession Number: 20220901–5190. Comment Date: 5 p.m. ET 9/8/22. Docket Numbers: ER22–2776–000. Applicants: Shelby County Energy Center, LLC. Description: § 205(d) Rate Filing: Reactive rates Normal filing 2022 to be effective 10/31/2022. Filed Date: 9/1/22. Accession Number: 20220901–5197. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2777–000. Applicants: Tilton Energy LLC. Description: § 205(d) Rate Filing: Normal filing 2022 to be effective 10/31/ 2022. Filed Date: 9/1/22. Accession Number: 20220901–5201. Comment Date: 5 p.m. ET 9/22/22. Docket Numbers: ER22–2778–000. Applicants: Puget Sound Energy, Inc. Description: § 205(d) Rate Filing: Cert of Concurrence to the LGIA between E:\FR\FM\08SEN1.SGM 08SEN1 Federal Register / Vol. 87, No. 173 / Thursday, September 8, 2022 / Notices Northwestern Corp and others to be effective 8/18/2022. Filed Date: 9/1/22. Accession Number: 20220901–5214. Comment Date: 5 p.m. ET 9/22/22. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES22–64–000. Applicants: Evergy Missouri West, Inc. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Evergy Missouri West, Inc. Filed Date: 9/1/22. Accession Number: 20220901–5162. Comment Date: 5 p.m. ET 9/22/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 1, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–19389 Filed 9–7–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: khammond on DSKJM1Z7X2PROD with NOTICES Filings in Existing Proceedings Docket Numbers: RP22–265–001. Applicants: Rockies Express Pipeline LLC. Description: Compliance filing: 2022– 08–31 REX NAESB 3.1 and 3.2 Compliance Filing to be effective 10/1/ 2022. Filed Date: 8/31/22. VerDate Sep<11>2014 18:19 Sep 07, 2022 Jkt 256001 Accession Number: 20220831–5070. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–266–001. Applicants: Tallgrass Interstate Gas Transmission, LLC. Description: Compliance filing: TIGT 2022–08–31 NAESB 3.1 and 3.2 Compliance Filing to be effective 10/1/ 2022. Filed Date: 8/31/22. Accession Number: 20220831–5072. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–267–001. Applicants: Trailblazer Pipeline Company LLC. Description: Compliance filing: 2022– 08–31 TPC NAESB 3.1 and 3.2 Compliance Filing to be effective 10/1/ 2022. Filed Date: 8/31/22. Accession Number: 20220831–5076. Comment Date: 5 p.m. ET 9/12/22. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. Filings Instituting Proceedings Docket Numbers: RP22–1150–000. Applicants: Tampa Electric Company, Peoples Gas System. Description: Joint Petition for Temporary Waivers of Capacity Release Regulations, et al. of Tampa Electric Company and Peoples Gas System. Filed Date: 8/24/22. Accession Number: 20220824–5175. Comment Date: 5 p.m. ET 9/8/22. Docket Numbers: RP22–1175–000. Applicants: TransColorado Gas Transmission Company LLC. Description: § 4(d) Rate Filing: TC Quarterly FL&U Update to be effective 10/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5043. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1176–000. Applicants: Ruby Pipeline, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreement (SWG) to be effective 9/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5079. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1177–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20220831 Negotiated Rate to be effective 9/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5082. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1178–000. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 54997 Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreement Filing (MIECO) to be effective 9/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5084. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1179–000. Applicants: Colorado Interstate Gas Company, L.L.C. Description: § 4(d) Rate Filing: NonConforming Agreement Filing (CSU #2195431–TI1CIG) to be effective 10/1/ 2022. Filed Date: 8/31/22. Accession Number: 20220831–5089. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1180–000. Applicants: Colorado Interstate Gas Company, L.L.C. Description: § 4(d) Rate Filing: Fuel_ Lost Unaccounted For Update to be effective 10/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5108. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1181–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: PAL NRA Wells Fargo Commodities, LLC SP378905 Amendment Exhibit C to be effective 9/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5129. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1182–000. Applicants: Millennium Pipeline Company, LLC. Description: § 4(d) Rate Filing: ROFR Process for Expansion Capacity to be effective 10/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5131. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1183–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: NonConforming Negotiated Rate Agreement—10/1/2022 to be effective 10/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5141. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1184–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Cherokee AGL— Replacement Shippers—Sep 2022 to be effective 9/1/2022. Filed Date: 8/31/22. Accession Number: 20220831–5148. Comment Date: 5 p.m. ET 9/12/22. Docket Numbers: RP22–1185–000. Applicants: El Paso Natural Gas Company, L.L.C. E:\FR\FM\08SEN1.SGM 08SEN1

Agencies

[Federal Register Volume 87, Number 173 (Thursday, September 8, 2022)]
[Notices]
[Pages 54995-54997]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-19389]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC22-116-000.
    Applicants: Evergy Missouri West, Inc., Persimmon Creek Wind Farm 
1, LLC.

[[Page 54996]]

    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Evergy Missouri West, Inc., et al.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5174.
    Comment Date: 5 p.m. ET 9/22/22.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG22-213-000.
    Applicants: BT Cunningham Storage, LLC.
    Description: BT Cunningham Storage, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/31/22.
    Accession Number: 20220831-5157.
    Comment Date: 5 p.m. ET 9/21/22.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER22-2758-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: DEF- Mt. Dora Reimbursement 
Agreement RS No. 366 to be effective 10/31/2022.
    Filed Date: 8/31/22.
    Accession Number: 20220831-5160.
    Comment Date: 5 p.m. ET 9/21/22.

    Docket Numbers: ER22-2759-000.
    Applicants: Eastman Cogeneration LP.
    Description: Market: Update of Market-Based Rate Tariff and 
Triennial Market Power Analysis to be effective 9/2/2022.
    Filed Date: 8/31/22.
    Accession Number: 20220831-5161.
    Comment Date: 5 p.m. ET 9/21/22.

    Docket Numbers: ER22-2760-000.
    Applicants: Public Service Company of New Mexico.
    Description: Sec.  205(d) Rate Filing: Modifications P0695 and 
Operating Agreement to be effective 9/1/2022.
    Filed Date: 8/31/22.
    Accession Number: 20220831-5169.
    Comment Date: 5 p.m. ET 9/21/22.

    Docket Numbers: ER22-2761-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: 2022-08-31 Grand Valley-
SISA-(T-2022-3)-717-0.0.0 to be effective 9/1/2022.
    Filed Date: 8/31/22.
    Accession Number: 20220831-5184.
    Comment Date: 5 p.m. ET 9/21/22.

    Docket Numbers: ER22-2762-000.
    Applicants: Northwest Power Pool.
    Description: Baseline eTariff Filing: Western Power Pool Western 
Resource Adequacy Program Tariff to be effective 12/12/2022.
    Filed Date: 8/31/22.
    Accession Number: 20220831-5189.
    Comment Date: 5 p.m. ET 9/30/22.

    Docket Numbers: ER22-2763-000.
    Applicants: Entergy Louisiana, LLC.
    Description: Sec.  205(d) Rate Filing: ELL LCPS Reactive to be 
effective 11/1/2022.
    Filed Date: 8/31/22.
    Accession Number: 20220831-5193.
    Comment Date: 5 p.m. ET 9/21/22.

    Docket Numbers: ER22-2764-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to Attachment X re 
to be effective 11/1/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5050.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2765-000.
    Applicants: Avista Corporation.
    Description: Sec.  205(d) Rate Filing: Avista Corp FERC RS T1198 GB 
Energy Park LGIA Cert of Concurrence to be effective 8/22/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5076.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2766-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: ISA, SA No. 6578; Queue No. 
AD1-088/AE2-182 to be effective 8/3/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5093.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2767-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA, SA No. 6580; 
Queue No. AE2-212 to be effective 8/3/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5096.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2768-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
Missouri Joint Municipal Electric Utility Commission.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2022-
09-01_Tariff Revisions to Incorporate Formula Rate for MJMEUC to be 
effective 12/31/9998.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5097.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2770-000.
    Applicants: Georgia Power Company, Mississippi Power Company, 
Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Georgia Power Company 
submits tariff filing per 35.13(a)(2)(iii: PEHA bn (Pepper Hammock II 
Solar) LGIA Filing to be effective 8/26/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5111.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2771-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: City of Hurricane Load 
Service Contract to be effective 9/1/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5124.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2772-000.
    Applicants: Consolidated Edison Company of New York, Inc.
    Description: Sec.  205(d) Rate Filing: RC CDG rule changes 9-1-2022 
to be effective 9/1/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5127.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2773-000.
    Applicants: Smoky Mountain Transmission LLC.
    Description: Sec.  205(d) Rate Filing: Amended Interconnection 
Agreement to be effective 9/2/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5163.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2774-000.
    Applicants: Gibson City Energy Center, LLC.
    Description: Sec.  205(d) Rate Filing: Normal filing 2022 to be 
effective 10/31/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5187.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2775-000.
    Applicants: PacifiCorp, Sierra Pacific Power Company, Nevada Power 
Company.
    Description: Joint Petition for Limited Waiver of PacifiCorp, et 
al.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5190.
    Comment Date: 5 p.m. ET 9/8/22.

    Docket Numbers: ER22-2776-000.
    Applicants: Shelby County Energy Center, LLC.
    Description: Sec.  205(d) Rate Filing: Reactive rates Normal filing 
2022 to be effective 10/31/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5197.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2777-000.
    Applicants: Tilton Energy LLC.
    Description: Sec.  205(d) Rate Filing: Normal filing 2022 to be 
effective 10/31/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5201.
    Comment Date: 5 p.m. ET 9/22/22.

    Docket Numbers: ER22-2778-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Sec.  205(d) Rate Filing: Cert of Concurrence to the 
LGIA between

[[Page 54997]]

Northwestern Corp and others to be effective 8/18/2022.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5214.
    Comment Date: 5 p.m. ET 9/22/22.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES22-64-000.
    Applicants: Evergy Missouri West, Inc.
    Description: Application Under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Evergy Missouri West, Inc.
    Filed Date: 9/1/22.
    Accession Number: 20220901-5162.
    Comment Date: 5 p.m. ET 9/22/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-19389 Filed 9-7-22; 8:45 am]
BILLING CODE 6717-01-P