Combined Notice of Filings #1, 54995-54997 [2022-19389]
Download as PDF
54995
Federal Register / Vol. 87, No. 173 / Thursday, September 8, 2022 / Notices
Æ Mail via U.S. Postal Service Only
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (including courier) delivery:
Deliver to: Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions:
OMB submissions must be formatted
and filed in accordance with submission
guidelines at www.reginfo.gov/public/
do/PRAMain. Using the search function
under the ‘‘Currently Under Review
field,’’ select Federal Energy Regulatory
Commission; click ‘‘submit,’’ and select
‘‘comment’’ to the right of the subject
collection.
FERC submissions must be formatted
and filed in accordance with submission
guidelines at: https://www.ferc.gov. For
user assistance, contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at: (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov and
telephone at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–715, Annual
Transmission Planning and Evaluation
Report.
OMB Control No.: 1902–0171.
Abstract: Section 213(b) of the Federal
Power Act 1 instructs the Commission to
require transmitting utilities 2 to submit
information annually about potentially
available transmission capacity and
known constraints. Such information
must be available to potential
transmission customers, State regulatory
authorities, and the public.
The Commission implements section
213(b) in accordance with the regulation
at 18 CFR 141.300, which provides that
the information collection applies to
each transmitting utility that operates
integrated transmission system facilities
rated above 100 kilovolts (kV), and lists
the following information that must be
included in the annual submission:
• Contact information;
• Base case power flow data (if the
respondent does not participate in the
development and use of regional power
flow data);
• Transmission system maps and
diagrams used by the respondent for
transmission planning;
• A detailed description of the
transmission planning reliability criteria
used to evaluate system performance for
time frames and planning horizons used
in regional and corporate planning;
• A detailed description of the
respondent’s transmission planning
assessment practices (including, but not
limited to, how reliability criteria are
applied and the steps taken in
performing transmission planning
studies); and
• A detailed evaluation of the
respondent’s anticipated system
performance as measured against its
stated reliability criteria using its stated
assessment practices.
The information collected under
FERC–715 assists the Commission in
reviewing:
• Rates and charges;
• Disposition of jurisdictional
facilities;
• Consolidations and mergers;
• Adequacy of supply; and
• Reliability and security of the
nation’s bulk power system.
Without the FERC–715 data, the
Commission would be less able to
evaluate planned projects or requests
related to transmission.
Type of Respondent: Integrated
transmission system facilities rated at or
above 100 kilovolts (kV).
Estimate of Annual Burden: 3 The
Commission estimates the total annual
burden and cost 4 for this information
collection as follows.
FERC–715, ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT
Type of response
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden &
cost per response
Total annual burden
hours & total annual
cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
khammond on DSKJM1Z7X2PROD with NOTICES
Annual Transmission Planning
and Evaluation Report.
111
Comments are invited on: (1) whether
the collection of information is
necessary for the proper performance of
the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimate of the burden and
cost of the collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information collection; and
(4) ways to minimize the burden of the
collection of information on those who
1 16
U.S.C. 824l(b)
section 3(23) (16 U.S.C. 796(23)) defines
‘‘transmitting utility’’ as an entity that owns,
operates, or controls facilities used for the
transmission of electric energy in interstate
2 FPA
VerDate Sep<11>2014
18:19 Sep 07, 2022
Jkt 256001
1
111
160 hrs.; $13,920 ..
are to respond, including the use of
automated collection techniques or
other forms of information technology.
Dated: September 1, 2022.
Kimberly D. Bose,
Secretary.
17,760 hrs.;
$1,545,120.
$13,920
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[FR Doc. 2022–19405 Filed 9–7–22; 8:45 am]
BILLING CODE 6717–01–P
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–116–000.
Applicants: Evergy Missouri West,
Inc., Persimmon Creek Wind Farm 1,
LLC.
commerce for the sale of electric energy at
wholesale.
3 ‘‘Burden’’ is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a Federal agency. For further explanation
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
of what is included in the information collection
burden, refer to 5 CFR 1320.3.
4 The Commission staff estimates that the
industry’s hourly cost for wages plus benefits is
similar to the Commission’s $87.00 FY 2021 average
hourly cost for wages and benefits.
E:\FR\FM\08SEN1.SGM
08SEN1
khammond on DSKJM1Z7X2PROD with NOTICES
54996
Federal Register / Vol. 87, No. 173 / Thursday, September 8, 2022 / Notices
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Evergy Missouri
West, Inc., et al.
Filed Date: 9/1/22.
Accession Number: 20220901–5174.
Comment Date: 5 p.m. ET 9/22/22.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–213–000.
Applicants: BT Cunningham Storage,
LLC.
Description: BT Cunningham Storage,
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 8/31/22.
Accession Number: 20220831–5157.
Comment Date: 5 p.m. ET 9/21/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–2758–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: DEFMt. Dora Reimbursement Agreement RS
No. 366 to be effective 10/31/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5160.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22–2759–000.
Applicants: Eastman Cogeneration LP.
Description: Market: Update of
Market-Based Rate Tariff and Triennial
Market Power Analysis to be effective 9/
2/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5161.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22–2760–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing:
Modifications P0695 and Operating
Agreement to be effective 9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5169.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22–2761–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2022–08–31 Grand Valley-SISA-(T–
2022–3)–717–0.0.0 to be effective 9/1/
2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5184.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22–2762–000.
Applicants: Northwest Power Pool.
Description: Baseline eTariff Filing:
Western Power Pool Western Resource
Adequacy Program Tariff to be effective
12/12/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5189.
VerDate Sep<11>2014
18:19 Sep 07, 2022
Jkt 256001
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22–2763–000.
Applicants: Entergy Louisiana, LLC.
Description: § 205(d) Rate Filing: ELL
LCPS Reactive to be effective 11/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5193.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22–2764–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Attachment X re to be
effective 11/1/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5050.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2765–000.
Applicants: Avista Corporation.
Description: § 205(d) Rate Filing:
Avista Corp FERC RS T1198 GB Energy
Park LGIA Cert of Concurrence to be
effective 8/22/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5076.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2766–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: ISA,
SA No. 6578; Queue No. AD1–088/AE2–
182 to be effective 8/3/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5093.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2767–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 6580; Queue
No. AE2–212 to be effective 8/3/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5096.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2768–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Missouri Joint Municipal Electric Utility
Commission.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2022–09–01_Tariff
Revisions to Incorporate Formula Rate
for MJMEUC to be effective 12/31/9998.
Filed Date: 9/1/22.
Accession Number: 20220901–5097.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2770–000.
Applicants: Georgia Power Company,
Mississippi Power Company, Alabama
Power Company.
Description: § 205(d) Rate Filing:
Georgia Power Company submits tariff
filing per 35.13(a)(2)(iii: PEHA bn
(Pepper Hammock II Solar) LGIA Filing
to be effective 8/26/2022.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Filed Date: 9/1/22.
Accession Number: 20220901–5111.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2771–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: City
of Hurricane Load Service Contract to be
effective 9/1/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5124.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2772–000.
Applicants: Consolidated Edison
Company of New York, Inc.
Description: § 205(d) Rate Filing: RC
CDG rule changes 9–1–2022 to be
effective 9/1/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5127.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2773–000.
Applicants: Smoky Mountain
Transmission LLC.
Description: § 205(d) Rate Filing:
Amended Interconnection Agreement to
be effective 9/2/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5163.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2774–000.
Applicants: Gibson City Energy
Center, LLC.
Description: § 205(d) Rate Filing:
Normal filing 2022 to be effective 10/31/
2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5187.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2775–000.
Applicants: PacifiCorp, Sierra Pacific
Power Company, Nevada Power
Company.
Description: Joint Petition for Limited
Waiver of PacifiCorp, et al.
Filed Date: 9/1/22.
Accession Number: 20220901–5190.
Comment Date: 5 p.m. ET 9/8/22.
Docket Numbers: ER22–2776–000.
Applicants: Shelby County Energy
Center, LLC.
Description: § 205(d) Rate Filing:
Reactive rates Normal filing 2022 to be
effective 10/31/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5197.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2777–000.
Applicants: Tilton Energy LLC.
Description: § 205(d) Rate Filing:
Normal filing 2022 to be effective 10/31/
2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5201.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22–2778–000.
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing: Cert
of Concurrence to the LGIA between
E:\FR\FM\08SEN1.SGM
08SEN1
Federal Register / Vol. 87, No. 173 / Thursday, September 8, 2022 / Notices
Northwestern Corp and others to be
effective 8/18/2022.
Filed Date: 9/1/22.
Accession Number: 20220901–5214.
Comment Date: 5 p.m. ET 9/22/22.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES22–64–000.
Applicants: Evergy Missouri West,
Inc.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Evergy Missouri West, Inc.
Filed Date: 9/1/22.
Accession Number: 20220901–5162.
Comment Date: 5 p.m. ET 9/22/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–19389 Filed 9–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSKJM1Z7X2PROD with NOTICES
Filings in Existing Proceedings
Docket Numbers: RP22–265–001.
Applicants: Rockies Express Pipeline
LLC.
Description: Compliance filing: 2022–
08–31 REX NAESB 3.1 and 3.2
Compliance Filing to be effective 10/1/
2022.
Filed Date: 8/31/22.
VerDate Sep<11>2014
18:19 Sep 07, 2022
Jkt 256001
Accession Number: 20220831–5070.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–266–001.
Applicants: Tallgrass Interstate Gas
Transmission, LLC.
Description: Compliance filing: TIGT
2022–08–31 NAESB 3.1 and 3.2
Compliance Filing to be effective 10/1/
2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5072.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–267–001.
Applicants: Trailblazer Pipeline
Company LLC.
Description: Compliance filing: 2022–
08–31 TPC NAESB 3.1 and 3.2
Compliance Filing to be effective 10/1/
2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5076.
Comment Date: 5 p.m. ET 9/12/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
Filings Instituting Proceedings
Docket Numbers: RP22–1150–000.
Applicants: Tampa Electric Company,
Peoples Gas System.
Description: Joint Petition for
Temporary Waivers of Capacity Release
Regulations, et al. of Tampa Electric
Company and Peoples Gas System.
Filed Date: 8/24/22.
Accession Number: 20220824–5175.
Comment Date: 5 p.m. ET 9/8/22.
Docket Numbers: RP22–1175–000.
Applicants: TransColorado Gas
Transmission Company LLC.
Description: § 4(d) Rate Filing: TC
Quarterly FL&U Update to be effective
10/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5043.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1176–000.
Applicants: Ruby Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement (SWG) to be
effective 9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5079.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1177–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20220831 Negotiated Rate to be effective
9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5082.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1178–000.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
54997
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Filing
(MIECO) to be effective 9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5084.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1179–000.
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Agreement Filing (CSU
#2195431–TI1CIG) to be effective 10/1/
2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5089.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1180–000.
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: Fuel_
Lost Unaccounted For Update to be
effective 10/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5108.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1181–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing: PAL
NRA Wells Fargo Commodities, LLC
SP378905 Amendment Exhibit C to be
effective 9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5129.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1182–000.
Applicants: Millennium Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: ROFR
Process for Expansion Capacity to be
effective 10/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5131.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1183–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing: NonConforming Negotiated Rate
Agreement—10/1/2022 to be effective
10/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5141.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1184–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Cherokee AGL—
Replacement Shippers—Sep 2022 to be
effective 9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831–5148.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1185–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
E:\FR\FM\08SEN1.SGM
08SEN1
Agencies
[Federal Register Volume 87, Number 173 (Thursday, September 8, 2022)]
[Notices]
[Pages 54995-54997]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-19389]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC22-116-000.
Applicants: Evergy Missouri West, Inc., Persimmon Creek Wind Farm
1, LLC.
[[Page 54996]]
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Evergy Missouri West, Inc., et al.
Filed Date: 9/1/22.
Accession Number: 20220901-5174.
Comment Date: 5 p.m. ET 9/22/22.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG22-213-000.
Applicants: BT Cunningham Storage, LLC.
Description: BT Cunningham Storage, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/31/22.
Accession Number: 20220831-5157.
Comment Date: 5 p.m. ET 9/21/22.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER22-2758-000.
Applicants: Duke Energy Florida, LLC.
Description: Sec. 205(d) Rate Filing: DEF- Mt. Dora Reimbursement
Agreement RS No. 366 to be effective 10/31/2022.
Filed Date: 8/31/22.
Accession Number: 20220831-5160.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22-2759-000.
Applicants: Eastman Cogeneration LP.
Description: Market: Update of Market-Based Rate Tariff and
Triennial Market Power Analysis to be effective 9/2/2022.
Filed Date: 8/31/22.
Accession Number: 20220831-5161.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22-2760-000.
Applicants: Public Service Company of New Mexico.
Description: Sec. 205(d) Rate Filing: Modifications P0695 and
Operating Agreement to be effective 9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831-5169.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22-2761-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: 2022-08-31 Grand Valley-
SISA-(T-2022-3)-717-0.0.0 to be effective 9/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831-5184.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22-2762-000.
Applicants: Northwest Power Pool.
Description: Baseline eTariff Filing: Western Power Pool Western
Resource Adequacy Program Tariff to be effective 12/12/2022.
Filed Date: 8/31/22.
Accession Number: 20220831-5189.
Comment Date: 5 p.m. ET 9/30/22.
Docket Numbers: ER22-2763-000.
Applicants: Entergy Louisiana, LLC.
Description: Sec. 205(d) Rate Filing: ELL LCPS Reactive to be
effective 11/1/2022.
Filed Date: 8/31/22.
Accession Number: 20220831-5193.
Comment Date: 5 p.m. ET 9/21/22.
Docket Numbers: ER22-2764-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to Attachment X re
to be effective 11/1/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5050.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2765-000.
Applicants: Avista Corporation.
Description: Sec. 205(d) Rate Filing: Avista Corp FERC RS T1198 GB
Energy Park LGIA Cert of Concurrence to be effective 8/22/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5076.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2766-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ISA, SA No. 6578; Queue No.
AD1-088/AE2-182 to be effective 8/3/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5093.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2767-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 6580;
Queue No. AE2-212 to be effective 8/3/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5096.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2768-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Missouri Joint Municipal Electric Utility Commission.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2022-
09-01_Tariff Revisions to Incorporate Formula Rate for MJMEUC to be
effective 12/31/9998.
Filed Date: 9/1/22.
Accession Number: 20220901-5097.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2770-000.
Applicants: Georgia Power Company, Mississippi Power Company,
Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Georgia Power Company
submits tariff filing per 35.13(a)(2)(iii: PEHA bn (Pepper Hammock II
Solar) LGIA Filing to be effective 8/26/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5111.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2771-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: City of Hurricane Load
Service Contract to be effective 9/1/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5124.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2772-000.
Applicants: Consolidated Edison Company of New York, Inc.
Description: Sec. 205(d) Rate Filing: RC CDG rule changes 9-1-2022
to be effective 9/1/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5127.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2773-000.
Applicants: Smoky Mountain Transmission LLC.
Description: Sec. 205(d) Rate Filing: Amended Interconnection
Agreement to be effective 9/2/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5163.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2774-000.
Applicants: Gibson City Energy Center, LLC.
Description: Sec. 205(d) Rate Filing: Normal filing 2022 to be
effective 10/31/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5187.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2775-000.
Applicants: PacifiCorp, Sierra Pacific Power Company, Nevada Power
Company.
Description: Joint Petition for Limited Waiver of PacifiCorp, et
al.
Filed Date: 9/1/22.
Accession Number: 20220901-5190.
Comment Date: 5 p.m. ET 9/8/22.
Docket Numbers: ER22-2776-000.
Applicants: Shelby County Energy Center, LLC.
Description: Sec. 205(d) Rate Filing: Reactive rates Normal filing
2022 to be effective 10/31/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5197.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2777-000.
Applicants: Tilton Energy LLC.
Description: Sec. 205(d) Rate Filing: Normal filing 2022 to be
effective 10/31/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5201.
Comment Date: 5 p.m. ET 9/22/22.
Docket Numbers: ER22-2778-000.
Applicants: Puget Sound Energy, Inc.
Description: Sec. 205(d) Rate Filing: Cert of Concurrence to the
LGIA between
[[Page 54997]]
Northwestern Corp and others to be effective 8/18/2022.
Filed Date: 9/1/22.
Accession Number: 20220901-5214.
Comment Date: 5 p.m. ET 9/22/22.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES22-64-000.
Applicants: Evergy Missouri West, Inc.
Description: Application Under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Evergy Missouri West, Inc.
Filed Date: 9/1/22.
Accession Number: 20220901-5162.
Comment Date: 5 p.m. ET 9/22/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-19389 Filed 9-7-22; 8:45 am]
BILLING CODE 6717-01-P