Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline, 54489-54491 [2022-19139]
Download as PDF
54489
Federal Register / Vol. 87, No. 171 / Tuesday, September 6, 2022 / Notices
FERC–515:—DECLARATION OF INTENTION
Number of
respondents
Annual
number of
responses per
respondent
Total
number of
responses
Average burden hours & cost ($)
per response
Total annual
burden hours &
total annual cost
($)
Cost per
respondent ($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
80 hrs.; $7,280 .................................
480 hrs.; $43,680 .............................
6
1
6
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: August 30, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–19140 Filed 9–2–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
jspears on DSK121TN23PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP22–1152–000.
Applicants: MarkWest Pioneer, L.L.C.
Description: § 4(d) Rate Filing:
Quarterly Fuel Adjustment Filing to be
effective 10/1/2022.
Filed Date: 8/26/22.
Accession Number: 20220826–5064.
Comment Date: 5 p.m. ET 9/7/22.
Docket Numbers: RP22–1153–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Atlantic Sunrise—
Chesapeake Energy Mktg to be effective
9/26/2022.
Filed Date: 8/26/22.
Accession Number: 20220826–5097.
Comment Date: 5 p.m. ET 9/7/22.
Docket Numbers: RP22–1154–000.
Applicants: Perryville Gas Storage
LLC.
VerDate Sep<11>2014
20:04 Sep 02, 2022
Jkt 256001
Description: § 4(d) Rate Filing:
Perryville Gas Storage LLC Revisions to
FERC Gas Tariff to be effective 9/27/
2022.
Filed Date: 8/26/22.
Accession Number: 20220826–5101.
Comment Date: 5 p.m. ET 9/7/22.
Docket Numbers: RP22–1155–000.
Applicants: Northwest Pipeline LLC.
Description: Compliance filing: NWP
2022 Rate Case Stipulation and
Settlement Filing to be effective N/A.
Filed Date: 8/26/22.
Accession Number: 20220826–5171.
Comment Date: 5 p.m. ET 9/7/22.
Docket Numbers: RP22–1156–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing: 2022
Operational Entitlements Filing to be
effective N/A.
Filed Date: 8/29/22.
Accession Number: 20220829–5049.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1157–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Amended Oglethorpe
410464 to be effective 9/1/2022.
Filed Date: 8/29/22.
Accession Number: 20220829–5068.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1158–000.
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: Compliance filing:
Operational Purchase and Sales Report
2022 to be effective N/A.
Filed Date: 8/29/22.
Accession Number: 20220829–5075.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: RP22–1159–000.
Applicants: Eastern Gas Transmission
and Storage, Inc.
Description: § 4(d) Rate Filing:
EGTS—August 30, 2022 Negotiated Rate
Agreement to be effective 9/1/2022.
Filed Date: 8/30/22.
Accession Number: 20220830–5020.
Comment Date: 5 p.m. ET 9/12/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
$7,280
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 30, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–19136 Filed 9–2–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP22–501–000, PF22–6–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
and Establishing Intervention Deadline
Take notice that on August 22, 2022,
Transcontinental Gas Pipe Line
Company, LLC (Transco), 2800 Post Oak
Boulevard, Houston, Texas 77056–6106,
filed in the above referenced docket an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) and Part 157
of the Commission’s regulations for its
proposed Southeast Energy Connector
Project (Project). Specifically, Transco
proposes to: (1) construct approximately
1.90 miles of 42-inch-diameter pipeline
loop on its existing Mainline E in
Chilton and Coosa Counties, Alabama;
(2) remove existing pig traps at
Mileposts 909.63 and 911.53 on its
Mainline E; and (3) install an additional
11,110 ISO-rated horsepower gas-fired,
turbine-driven compressor unit and
modify three existing compressor units
at its Compressor Station 105 in Coosa
County, Alabama. Transco states that
E:\FR\FM\06SEN1.SGM
06SEN1
jspears on DSK121TN23PROD with NOTICES
54490
Federal Register / Vol. 87, No. 171 / Tuesday, September 6, 2022 / Notices
the Project will provide an additional
150,000 dekatherms per day of firm
transportation service to Ernest C.
Gaston Electric Generating Plant in
Shelby County, Alabama. Transco
estimates the cost of the Project to be
$154,907,369, all as more fully set forth
in the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Andre
Pereira, Regulatory Analyst, Lead,
Transcontinental Gas Pipe Line
Company, LLC, P.O. Box 1396, Houston,
Texas 77251–1396, by telephone at
(713) 215–4362 or by email at
Andre.S.Pereira@Williams.com.
On April 18, 2022, the Commission
granted the Applicant’s request to
utilize the National Environmental
Policy Act Pre-Filing Process and
assigned Docket No. PF22–6–000 to staff
activities involved in the Project. Now,
as of the filing of the August 22, 2022
application, the Pre-Filing Process for
this project has ended. From this time
forward, this proceeding will be
conducted in Docket No. CP22–501–000
as noted in the caption of this Notice.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
20:04 Sep 02, 2022
Jkt 256001
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5:00 p.m. Eastern
Time on September 20, 2022.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before September 20, 2022.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
reference the Project docket number
CP22–501–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You may file a paper copy of your
comments by mailing them to the
following address below.2 Your written
2 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
comments must reference the Project
docket number (CP22–501–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is September 20,
2022. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
3 18
CFR 385.102(d).
CFR 385.214.
5 18 CFR 157.10.
4 18
E:\FR\FM\06SEN1.SGM
06SEN1
Federal Register / Vol. 87, No. 171 / Tuesday, September 6, 2022 / Notices
jspears on DSK121TN23PROD with NOTICES
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP22–501–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the Project
docket number CP22–501–000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Andre Pereira,
Regulatory Analyst, Lead,
Transcontinental Gas Pipe Line
Company, LLC, P.O. Box 1396, Houston,
Texas 77251–1396 or by email at
Andre.S.Pereira@Williams.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
VerDate Sep<11>2014
20:04 Sep 02, 2022
Jkt 256001
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the
projects will be available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
‘‘eLibrary’’ link as described above. The
eLibrary link also provides access to the
texts of all formal documents issued by
the Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on September 20, 2022.
Dated: August 30, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–19139 Filed 9–2–22; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2016–0725; FRL–9403–02–
OCSPP]
Colour Index Pigment Violet 29 (PV29);
Revision to the Toxic Substances
Control Act (TSCA) Risk
Determination; Notice of Availability
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is announcing the
availability of the final revision to the
risk determination for the Colour Index
Pigment Violet 29 (PV29) risk
evaluation issued under the Toxic
Substances Control Act (TSCA). The
revision to the PV29 risk determination
reflects the announced policy changes
to ensure the public is protected from
SUMMARY:
9 18
PO 00000
CFR 385.214(b)(3) and (d).
Frm 00043
Fmt 4703
Sfmt 4703
54491
unreasonable risks from chemicals in a
way that is supported by science and
the law. EPA determined that PV29, as
a whole chemical substance, presents an
unreasonable risk of injury to health
when evaluated under its conditions of
use. In addition, this revised risk
determination does not reflect an
assumption that workers always
appropriately wear personal protective
equipment (PPE). EPA understands that
there could be occupational safety
protections in place at workplace
locations; however, not assuming use of
PPE reflects EPA’s recognition that
unreasonable risk may exist for
subpopulations of workers that may be
highly exposed because they are not
covered by Occupational Safety and
Health Administration (OSHA)
standards, or their employers are out of
compliance with OSHA standards, or
because many of OSHA’s chemicalspecific permissible exposure limits
largely adopted in the 1970’s are
described by OSHA as being ‘‘outdated
and inadequate for ensuring protection
of worker health,’’ or because OSHA has
not issued a chemical-specific
permissible exposure limit (PEL) (as is
the case for PV29), or because EPA finds
unreasonable risk for purposes of TSCA
notwithstanding OSHA requirements.
This revision supersedes the condition
of use-specific no unreasonable risk
determinations in the January 2021
PV29 Risk Evaluation and withdraws
the associated TSCA order included in
the January 2021 PV29 Risk Evaluation.
ADDRESSES: The docket for this action,
identified by docket identification (ID)
number EPA–HQ–OPPT–2016–0725, is
available online at https://
www.regulations.gov or in-person at the
Office of Pollution Prevention and
Toxics Docket (OPPT Docket),
Environmental Protection Agency
Docket Center (EPA/DC), West William
Jefferson Clinton Bldg., Rm. 3334, 1301
Constitution Ave. NW, Washington, DC
20460–0001. The Public Reading Room
is open from 8:30 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Public Reading Room is (202) 566–1744,
and the telephone number for the OPPT
Docket is (202) 566–0280.
FOR FURTHER INFORMATION CONTACT:
For technical information contact:
Dyllan Taylor, Office of Pollution
Prevention and Toxics (7404T),
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460–0001; telephone number: (202)
564–2913; email address: taylor.dyllan@
epa.gov.
For general information contact: The
TSCA-Hotline, ABVI-Goodwill, 422
E:\FR\FM\06SEN1.SGM
06SEN1
Agencies
[Federal Register Volume 87, Number 171 (Tuesday, September 6, 2022)]
[Notices]
[Pages 54489-54491]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-19139]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP22-501-000, PF22-6-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Application and Establishing Intervention Deadline
Take notice that on August 22, 2022, Transcontinental Gas Pipe Line
Company, LLC (Transco), 2800 Post Oak Boulevard, Houston, Texas 77056-
6106, filed in the above referenced docket an application pursuant to
section 7(c) of the Natural Gas Act (NGA) and Part 157 of the
Commission's regulations for its proposed Southeast Energy Connector
Project (Project). Specifically, Transco proposes to: (1) construct
approximately 1.90 miles of 42-inch-diameter pipeline loop on its
existing Mainline E in Chilton and Coosa Counties, Alabama; (2) remove
existing pig traps at Mileposts 909.63 and 911.53 on its Mainline E;
and (3) install an additional 11,110 ISO-rated horsepower gas-fired,
turbine-driven compressor unit and modify three existing compressor
units at its Compressor Station 105 in Coosa County, Alabama. Transco
states that
[[Page 54490]]
the Project will provide an additional 150,000 dekatherms per day of
firm transportation service to Ernest C. Gaston Electric Generating
Plant in Shelby County, Alabama. Transco estimates the cost of the
Project to be $154,907,369, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding this application should be directed to
Andre Pereira, Regulatory Analyst, Lead, Transcontinental Gas Pipe Line
Company, LLC, P.O. Box 1396, Houston, Texas 77251-1396, by telephone at
(713) 215-4362 or by email at [email protected].
On April 18, 2022, the Commission granted the Applicant's request
to utilize the National Environmental Policy Act Pre-Filing Process and
assigned Docket No. PF22-6-000 to staff activities involved in the
Project. Now, as of the filing of the August 22, 2022 application, the
Pre-Filing Process for this project has ended. From this time forward,
this proceeding will be conducted in Docket No. CP22-501-000 as noted
in the caption of this Notice.
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: you can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on September 20, 2022.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before September 20, 2022.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number CP22-501-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You may file a paper copy of your comments by mailing them to
the following address below.\2\ Your written comments must reference
the Project docket number (CP22-501-000).
---------------------------------------------------------------------------
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is September 20, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
[[Page 54491]]
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP22-501-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below.\6\
Your motion to intervene must reference the Project docket number CP22-
501-000.
---------------------------------------------------------------------------
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail or email at: Andre Pereira, Regulatory Analyst, Lead,
Transcontinental Gas Pipe Line Company, LLC, P.O. Box 1396, Houston,
Texas 77251-1396 or by email at [email protected]. Any
subsequent submissions by an intervenor must be served on the applicant
and all other parties to the proceeding. Contact information for
parties can be downloaded from the service list at the eService link on
FERC Online. Service can be via email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the
projects will be available from the Commission's Office of External
Affairs, at (866) 208-FERC, or on the FERC website at www.ferc.gov
using the ``eLibrary'' link as described above. The eLibrary link also
provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on September 20,
2022.
Dated: August 30, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-19139 Filed 9-2-22; 8:45 am]