Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 168 / Wednesday, August 31, 2022 / Notices protestor states it also seeks to be an intervenor. How To File Protests, Interventions, and Comments Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is October 24, 2022. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP22–498–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 7 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP22–498– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: David A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission, LLC, at 700 Louisiana Street, Suite 1300, Houston, Texas, 77002–2700 or david_alonzo@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before October 24, 2022. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. 5 18 6 18 CFR 385.214. CFR 157.10. VerDate Sep<11>2014 16:59 Aug 30, 2022 Jkt 256001 Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– 7 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 53467 FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: August 25, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–18796 Filed 8–30–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: PR22–58–000. Applicants: Columbia Gas of Ohio, Inc. Description: § 284.123 Rate Filing: COH SOC Rates effective July 29 2022 to be effective 7/29/2022. Filed Date: 8/25/22. Accession Number: 20220825–5013. Comments/Protest Due: 5 p.m. ET 9/15/22. Docket Numbers: RP22–1143–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreement Update (APS Sept 2022) to be effective 9/1/2022. Filed Date: 8/24/22. Accession Number: 20220824–5056. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: RP22–1144–000. Applicants: Texas Eastern Transmission, LP. Description: Compliance filing: TETLP August 2022 Penalty Disbursement Report to be effective N/A. Filed Date: 8/24/22. Accession Number: 20220824–5099. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: RP22–1145–000. E:\FR\FM\31AUN1.SGM 31AUN1 53468 Federal Register / Vol. 87, No. 168 / Wednesday, August 31, 2022 / Notices Applicants: Saltville Gas Storage Company L.L.C. Description: § 4(d) Rate Filing: August 2022 Negotiated Rate Clean-up Filing to be effective 9/25/2022. Filed Date: 8/25/22. Accession Number: 20220825–5002. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: RP22–1146–000. Applicants: Elba Express Company, L.L.C. Description: § 4(d) Rate Filing: Prepayment to be effective 9/26/2022. Filed Date: 8/25/22. Accession Number: 20220825–5019. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: RP22–1147–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: 2022 ACA Tracker Filing—GSS, LSS, SS–2, S–2 to be effective 10/1/2022. Filed Date: 8/25/22. Accession Number: 20220825–5055. Comment Date: 5 p.m. ET 9/6/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 25, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–18791 Filed 8–30–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY lotter on DSK11XQN23PROD with NOTICES1 Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER22–2264–001. Applicants: Midcontinent Independent System Operator, Inc., VerDate Sep<11>2014 16:59 Aug 30, 2022 Jkt 256001 Great River Energy, Northern States Power Company, a Minnesota corporation. Description: Tariff Amendment: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.17(b): 2022–08–25_SA 3813 NSP– GRE–Willmar Sub Orig TIA to be effective 8/31/2022. Filed Date: 8/25/22. Accession Number: 20220825–5104. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2500–000. Applicants: DLS—Jean Duluth Project Co, LLC. Description: Supplement to July 27, 2022 of DLS—Jean Duluth Project Co, LLC submits tariff filing per 35.12: MBR Application to be effective 9/26/2022. Filed Date: 8/23/22. Accession Number: 20220823–5108. Comment Date: 5 p.m. ET 9/2/22. Docket Numbers: ER22–2501–000. Applicants: DLS—Laskin Project Co, LLC. Description: Supplement to July 27, 2022 DLS—Laskin Project Co, LLC submits tariff filing per 35.12: MBR Application to be effective 9/26/2022. Filed Date: 8/23/22. Accession Number: 20220823–5109. Comment Date: 5 p.m. ET 9/2/22. Docket Numbers: ER22–2502–000. Applicants: DLS—Sylvan Project Co, LLC. Description: Supplement to July 27, 2022 DLS—Sylvan Project Co, LLC submits tariff filing per 35.12: MBR Application to be effective 9/26/2022. Filed Date: 8/23/22. Accession Number: 20220823–5110. Comment Date: 5 p.m. ET 9/2/22. Docket Numbers: ER22–2715–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Initial Filing of Rate Schedule FERC No. 346 to be effective 10/25/2022. Filed Date: 8/24/22. Accession Number: 20220824–5108. Comment Date: 5 p.m. ET 9/14/22. Docket Numbers: ER22–2716–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to SA No. 5822; Queue No. AE1–143 to be effective 10/7/2020. Filed Date: 8/25/22. Accession Number: 20220825–5001. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2717–000. Applicants: American Transmission Systems, Incorporated, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: American Transmission Systems, Incorporated submits tariff filing per PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 35.13(a)(2)(iii: ATSI submits Revised Interconnection Agreement (IA) SA No. 3994 to be effective 10/25/2022. Filed Date: 8/25/22. Accession Number: 20220825–5004. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2718–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6585; Queue Nos. AE2–230/AF1–291A/ AF2–075 to be effective 7/26/2022. Filed Date: 8/25/22. Accession Number: 20220825–5032. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2719–000. Applicants: PPL Electric Utilities Corporation, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: PPL Electric Utilities Corporation submits tariff filing per 35.13(a)(2)(iii: PPL EU Revisions to the Formula Rate, OATT Attachment H–8G and H–8H to be effective 10/25/2022. Filed Date: 8/25/22. Accession Number: 20220825–5083. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2720–000. Applicants: Union Electric Company, Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: Union Electric Company submits tariff filing per 35.13(a)(2)(iii: 2022–08–25_ SA 3884 UEC-Hannibal (Finn) Joint Use Agreement to be effective 10/25/2022. Filed Date: 8/25/22. Accession Number: 20220825–5089. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2721–000. Applicants: Union Electric Company. Description: § 205(d) Rate Filing: Rate Schedule 24, Rush Island SSR Payment to be effective 9/1/2022. Filed Date: 8/25/22. Accession Number: 20220825–5096. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2722–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6588; Queue No. AE2–118 to be effective 7/26/2022. Filed Date: 8/25/22. Accession Number: 20220825–5098. Comment Date: 5 p.m. ET 9/15/22. Docket Numbers: ER22–2723–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Amendment to Rate Schedule FERC No. 6 to be effective 10/24/2022. Filed Date: 8/25/22. Accession Number: 20220825–5110. E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 87, Number 168 (Wednesday, August 31, 2022)]
[Notices]
[Pages 53467-53468]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-18791]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: PR22-58-000.
    Applicants: Columbia Gas of Ohio, Inc.
    Description: Sec.  284.123 Rate Filing: COH SOC Rates effective 
July 29 2022 to be effective 7/29/2022.
    Filed Date: 8/25/22.
    Accession Number: 20220825-5013.
    Comments/Protest Due: 5 p.m. ET 9/15/22.

    Docket Numbers: RP22-1143-000.
    Applicants: El Paso Natural Gas Company, L.L.C.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate Agreement 
Update (APS Sept 2022) to be effective 9/1/2022.
    Filed Date: 8/24/22.
    Accession Number: 20220824-5056.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: RP22-1144-000.
    Applicants: Texas Eastern Transmission, LP.
    Description: Compliance filing: TETLP August 2022 Penalty 
Disbursement Report to be effective N/A.
    Filed Date: 8/24/22.
    Accession Number: 20220824-5099.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: RP22-1145-000.

[[Page 53468]]

    Applicants: Saltville Gas Storage Company L.L.C.
    Description: Sec.  4(d) Rate Filing: August 2022 Negotiated Rate 
Clean-up Filing to be effective 9/25/2022.
    Filed Date: 8/25/22.
    Accession Number: 20220825-5002.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: RP22-1146-000.
    Applicants: Elba Express Company, L.L.C.
    Description: Sec.  4(d) Rate Filing: Prepayment to be effective 9/
26/2022.
    Filed Date: 8/25/22.
    Accession Number: 20220825-5019.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: RP22-1147-000.
    Applicants: Transcontinental Gas Pipe Line Company, LLC.
    Description: Sec.  4(d) Rate Filing: 2022 ACA Tracker Filing--GSS, 
LSS, SS-2, S-2 to be effective 10/1/2022.
    Filed Date: 8/25/22.
    Accession Number: 20220825-5055.
    Comment Date: 5 p.m. ET 9/6/22.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 25, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-18791 Filed 8-30-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.