Venture Global CP2 LNG, LLC, Venture Global CP Express, LLC; Notice of Revised Schedule for Environmental Review of the CP2 Lng and CP Express Projects, 52762 [2022-18560]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
52762
Federal Register / Vol. 87, No. 166 / Monday, August 29, 2022 / Notices
and low reservoir inflows, the applicant
requests to reduce the seasonal
minimum allowable reservoir elevation
from 868 feet to 865 feet to increase
spillway discharge in order to mitigate
low tailrace dissolved oxygen levels
(DO). When inflow to the reservoir is
not equal to the discharge needed to
maintain DO concentration in the
project tailwater at the minimum
standard (5.0 milligrams per liter), the
applicant would increase project
discharge in 25 cubic feet per second
increments and subsequently lower the
reservoir elevation below 868 feet but
no less than 865 feet. The applicant
requests the temporary variance to
remain into effect until November 1,
2022.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting or intervening; and (4)
VerDate Sep<11>2014
17:01 Aug 26, 2022
Jkt 256001
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: August 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18565 Filed 8–26–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–21–000; Docket No.
CP22–22–000]
Venture Global CP2 LNG, LLC, Venture
Global CP Express, LLC; Notice of
Revised Schedule for Environmental
Review of the CP2 Lng and CP Express
Projects
This notice provides the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental impact statement
(EIS) for Venture Global CP2 LNG, LLC’s
(CP2 LNG) and Venture Global CP
Express, LLC’s (CP Express) CP2 LNG
and CP Express Projects. The first notice
of schedule, issued on February 9, 2022,
identified February 10, 2023 as the final
EIS issuance date. However, a number
of responses to environmental and
engineering data requests continue to
remain outstanding and/or are
deficient.1 These outstanding responses
are necessary for staff to prepare a draft
EIS for the projects. Based upon CP2
LNG’s and CP Express’ commitment to
provide complete responses to the
outstanding data requests by August 30,
2022, staff has revised the schedule for
issuance of the final EIS and anticipates
issuing a draft EIS in January 2023.
Schedule for Environmental Review
Issuance of the Notice of Availability of
the final EIS—July 28, 2023
90-day Federal Authorization Decision
Deadline 2—October 26, 2023
1 On
July 6, 2022 the Commission issued a notice
suspending the environmental review schedule for
these projects based upon CP2 LNG’s and CP
Express’ failure to file complete and timely
information necessary for staff to prepare a draft
EIS.
2 The Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP22–21 and CP22–22), and follow
the instructions. For assistance with
access to eLibrary, the helpline can be
reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
website also provides access to the texts
of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: August 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18560 Filed 8–26–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6240–064]
Watson Associates; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
E:\FR\FM\29AUN1.SGM
29AUN1
Agencies
[Federal Register Volume 87, Number 166 (Monday, August 29, 2022)]
[Notices]
[Page 52762]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-18560]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-21-000; Docket No. CP22-22-000]
Venture Global CP2 LNG, LLC, Venture Global CP Express, LLC;
Notice of Revised Schedule for Environmental Review of the CP2 Lng and
CP Express Projects
This notice provides the Federal Energy Regulatory Commission
staff's revised schedule for the completion of the environmental impact
statement (EIS) for Venture Global CP2 LNG, LLC's (CP2 LNG) and Venture
Global CP Express, LLC's (CP Express) CP2 LNG and CP Express Projects.
The first notice of schedule, issued on February 9, 2022, identified
February 10, 2023 as the final EIS issuance date. However, a number of
responses to environmental and engineering data requests continue to
remain outstanding and/or are deficient.\1\ These outstanding responses
are necessary for staff to prepare a draft EIS for the projects. Based
upon CP2 LNG's and CP Express' commitment to provide complete responses
to the outstanding data requests by August 30, 2022, staff has revised
the schedule for issuance of the final EIS and anticipates issuing a
draft EIS in January 2023.
---------------------------------------------------------------------------
\1\ On July 6, 2022 the Commission issued a notice suspending
the environmental review schedule for these projects based upon CP2
LNG's and CP Express' failure to file complete and timely
information necessary for staff to prepare a draft EIS.
---------------------------------------------------------------------------
Schedule for Environmental Review
Issuance of the Notice of Availability of the final EIS--July 28, 2023
90-day Federal Authorization Decision Deadline \2\--October 26, 2023
---------------------------------------------------------------------------
\2\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
---------------------------------------------------------------------------
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
project's progress.
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP22-21 and CP22-22), and follow the instructions. For assistance with
access to eLibrary, the helpline can be reached at (866) 208-3676, TTY
(202) 502-8659, or at [email protected]. The eLibrary link on
the FERC website also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rule makings.
Dated: August 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-18560 Filed 8-26-22; 8:45 am]
BILLING CODE 6717-01-P