DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER22–2689–000]
lotter on DSK11XQN23PROD with NOTICES1
MTSun LLC; Supplemental Notice That
Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of MTSun
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
12, 2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
VerDate Sep<11>2014
16:59 Aug 25, 2022
Jkt 256001
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: August 22, 2022.
Kimberly D. Bose,
Secretary.
Milestone
Comments on EA ........................
Target date
January 2023.
Any questions regarding this notice
may be directed to Monir Chowdhury at
(202) 502–6736 or monir.chowdhury@
ferc.gov.
Dated: August 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18422 Filed 8–25–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2022–18423 Filed 8–25–22; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3509–042]
Little Falls Hydroelectric Associates,
LP; Notice of Intent To Prepare an
Environmental Assessment
On August 31, 2021, Little Falls
Hydroelectric Associates, LP (Little
Falls Associates) filed an application for
a new major license for the 13.3megawatt Little Falls Hydroelectric
Project (Little Falls Project; FERC No.
3509). The Little Falls Project is located
on the Mohawk River, in the City of
Little Falls, Herkimer County, New
York. The project does not occupy
federal land.
In accordance with the Commission’s
regulations, on May 25, 2022,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to relicense the Little Falls
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Commission issues EA ...............
December 2022.1
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–208–000.
Applicants: Hunt Energy Network
Land Company, L.L.C.
Description: Hunt Energy Network
Land Company, L.L.C. submits Notice of
Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 8/22/22.
Accession Number: 20220822–5089.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: EG22–209–000.
Applicants: HEN Infrastructure, L.L.C.
Description: HEN Infrastructure,
L.L.C. submits Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 8/22/22.
Accession Number: 20220822–5091.
Comment Date: 5 p.m. ET 9/12/22.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL21–77–000.
Applicants: Tenaska Clear Creek
Wind, LLC v. Southwest Power Pool, Inc.
Description: Southwest Power Pool,
Inc. submits Revised Network Upgrade
Costs.
Filed Date: 8/16/22.
Accession Number: 20220816–5123.
Comment Date: 5 p.m. ET 8/26/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–2698–000.
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare an EA for the Little Falls Project. Therefore,
in accordance with CEQ’s regulations, the EA must
be issued within 1 year of the issuance date of this
notice.
E:\FR\FM\26AUN1.SGM
26AUN1
52548
Federal Register / Vol. 87, No. 165 / Friday, August 26, 2022 / Notices
Applicants: SESCO Enterprises
Canada Ltd.
Description: Notice of Cancellation of
Market Based Rate Tariff and Request
for Waiver of SESCO Enterprises
Canada, Ltd.
Filed Date: 8/19/22.
Accession Number: 20220819–5197.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2699–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–08–22_SA 3391 Ameren IL-Maple
Flats Solar Energy Center 2nd Rev GIA
(J813) to be effective 8/15/2022.
Filed Date: 8/22/22.
Accession Number: 20220822–5045.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: ER22–2700–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2022–08–22 Reliability Demand
Response Resource—Phase 2 to be
effective 12/31/9998.
Filed Date: 8/22/22.
Accession Number: 20220822–5141.
Comment Date: 5 p.m. ET 9/12/22.
lotter on DSK11XQN23PROD with NOTICES1
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18420 Filed 8–25–22; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:59 Aug 25, 2022
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–121–000]
National Grid LNG LLC; Notice of
Request for Extension of Time
Take notice that on August 16, 2022,
National Grid LNG LLC (National Grid)
requested that the Federal Energy
Regulatory Commission (Commission)
grant an extension of time (2022
Extension of Time Request), until June
1, 2023, to complete construction of,
and place into service, its Fields Point
Liquefaction Project located in
Providence, RI as authorized in the
October 17, 2018 Order Issuing
Certificate (Certificate Order).1 Ordering
Paragraph B(1) of the Certificate Order
required National Grid to complete the
construction of the proposed Fields
Point Liquefaction Project facilities 2
and make them available for service
within three years from issuance, or by
October 17, 2021.3
On December 8, 2020 National Grid
filed a request for an extension of time
for an additional twelve months to
complete construction and place into
service the authorized construction at
the LNG storage facility at Fields Point.
National Grid was granted a one-year
extension of time, until and including
October 17, 2022, to complete
abandonment activities authorized in
the above referenced docket.
National Grid states that the Project
was on-schedule to be placed in service
before October 17, 2022, however,
National Grid had to suspend the testing
and commissioning process on May 23,
2022, due to objections from the PPL
Corporation-owned LDC regarding
odorant levels in the tail gas flowing
into the LDC system on that date.
National Grid states that despite diligent
efforts to design, engineer and procure
all of the components for the mercaptan
removal system, supply chain delays
have occurred. National Grid states that
potential supply shortfall could lead to
further delays in completing the testing
to begin service until the following
Spring. For that reason and dependence
upon meteorological conditions during
1 National Grid LNG LLC, 165 FERC ¶ 61,031
(2018) (Certificate Order).
2 The Fields Point Liquefaction Project consists of
the construction of one (1) new 20 million cubic
feet per day (MMcf/d) gas pretreatment and
liquefaction system to convert natural gas delivered
by pipeline into liquefied natural gas (LNG). The
liquefaction facility is designed to enable National
Gas to provide up to 20,600 dekatherms per day
(Dth/day) liquefaction service at its existing LNG
storage facility located in Providence, RI.
3 Id. at ordering para. (B)(1).
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
the Fall months, National Grid requests
an extension to June 1, 2023 for the date
to place the facilities in service.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on National Grid’s request for
an extension of time may do so. No
reply comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,4 the Commission will aim to
issue an order acting on the request
within 45 days.5 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.6 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.7 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.8 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, The Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
4 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
5 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
6 Id. at P 40.
7 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
8 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
E:\FR\FM\26AUN1.SGM
26AUN1
Agencies
[Federal Register Volume 87, Number 165 (Friday, August 26, 2022)]
[Notices]
[Pages 52547-52548]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-18420]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG22-208-000.
Applicants: Hunt Energy Network Land Company, L.L.C.
Description: Hunt Energy Network Land Company, L.L.C. submits
Notice of Self-Certification of Exempt Wholesale Generator Status.
Filed Date: 8/22/22.
Accession Number: 20220822-5089.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: EG22-209-000.
Applicants: HEN Infrastructure, L.L.C.
Description: HEN Infrastructure, L.L.C. submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/22/22.
Accession Number: 20220822-5091.
Comment Date: 5 p.m. ET 9/12/22.
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL21-77-000.
Applicants: Tenaska Clear Creek Wind, LLC v. Southwest Power Pool,
Inc.
Description: Southwest Power Pool, Inc. submits Revised Network
Upgrade Costs.
Filed Date: 8/16/22.
Accession Number: 20220816-5123.
Comment Date: 5 p.m. ET 8/26/22.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER22-2698-000.
[[Page 52548]]
Applicants: SESCO Enterprises Canada Ltd.
Description: Notice of Cancellation of Market Based Rate Tariff and
Request for Waiver of SESCO Enterprises Canada, Ltd.
Filed Date: 8/19/22.
Accession Number: 20220819-5197.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2699-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2022-08-22_SA 3391 Ameren
IL-Maple Flats Solar Energy Center 2nd Rev GIA (J813) to be effective
8/15/2022.
Filed Date: 8/22/22.
Accession Number: 20220822-5045.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: ER22-2700-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2022-08-22 Reliability
Demand Response Resource--Phase 2 to be effective 12/31/9998.
Filed Date: 8/22/22.
Accession Number: 20220822-5141.
Comment Date: 5 p.m. ET 9/12/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-18420 Filed 8-25-22; 8:45 am]