Applicants: SESCO Enterprises
Canada Ltd.
Description: Notice of Cancellation of
Market Based Rate Tariff and Request
for Waiver of SESCO Enterprises
Canada, Ltd.
Filed Date: 8/19/22.
Accession Number: 20220819–5197.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2699–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–08–22_SA 3391 Ameren IL-Maple
Flats Solar Energy Center 2nd Rev GIA
(J813) to be effective 8/15/2022.
Filed Date: 8/22/22.
Accession Number: 20220822–5045.
Comment Date: 5 p.m. ET 9/12/22.
Docket Numbers: ER22–2700–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2022–08–22 Reliability Demand
Response Resource—Phase 2 to be
effective 12/31/9998.
Filed Date: 8/22/22.
Accession Number: 20220822–5141.
Comment Date: 5 p.m. ET 9/12/22.
lotter on DSK11XQN23PROD with NOTICES1
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18420 Filed 8–25–22; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:59 Aug 25, 2022
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–121–000]
National Grid LNG LLC; Notice of
Request for Extension of Time
Take notice that on August 16, 2022,
National Grid LNG LLC (National Grid)
requested that the Federal Energy
Regulatory Commission (Commission)
grant an extension of time (2022
Extension of Time Request), until June
1, 2023, to complete construction of,
and place into service, its Fields Point
Liquefaction Project located in
Providence, RI as authorized in the
October 17, 2018 Order Issuing
Certificate (Certificate Order).1 Ordering
Paragraph B(1) of the Certificate Order
required National Grid to complete the
construction of the proposed Fields
Point Liquefaction Project facilities 2
and make them available for service
within three years from issuance, or by
October 17, 2021.3
On December 8, 2020 National Grid
filed a request for an extension of time
for an additional twelve months to
complete construction and place into
service the authorized construction at
the LNG storage facility at Fields Point.
National Grid was granted a one-year
extension of time, until and including
October 17, 2022, to complete
abandonment activities authorized in
the above referenced docket.
National Grid states that the Project
was on-schedule to be placed in service
before October 17, 2022, however,
National Grid had to suspend the testing
and commissioning process on May 23,
2022, due to objections from the PPL
Corporation-owned LDC regarding
odorant levels in the tail gas flowing
into the LDC system on that date.
National Grid states that despite diligent
efforts to design, engineer and procure
all of the components for the mercaptan
removal system, supply chain delays
have occurred. National Grid states that
potential supply shortfall could lead to
further delays in completing the testing
to begin service until the following
Spring. For that reason and dependence
upon meteorological conditions during
1 National Grid LNG LLC, 165 FERC ¶ 61,031
(2018) (Certificate Order).
2 The Fields Point Liquefaction Project consists of
the construction of one (1) new 20 million cubic
feet per day (MMcf/d) gas pretreatment and
liquefaction system to convert natural gas delivered
by pipeline into liquefied natural gas (LNG). The
liquefaction facility is designed to enable National
Gas to provide up to 20,600 dekatherms per day
(Dth/day) liquefaction service at its existing LNG
storage facility located in Providence, RI.
3 Id. at ordering para. (B)(1).
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
the Fall months, National Grid requests
an extension to June 1, 2023 for the date
to place the facilities in service.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on National Grid’s request for
an extension of time may do so. No
reply comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,4 the Commission will aim to
issue an order acting on the request
within 45 days.5 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.6 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.7 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.8 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, The Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
4 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
5 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
6 Id. at P 40.
7 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
8 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
E:\FR\FM\26AUN1.SGM
26AUN1
Federal Register / Vol. 87, No. 165 / Friday, August 26, 2022 / Notices
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and three copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on September 6, 2022.
Dated: August 22, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18419 Filed 8–25–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD22–9–000]
New England Winter Gas-Electric
Forum; Supplemental Notice of New
England Winter Gas-Electric Forum
As first announced in the Notice of
Forum issued in the above-referenced
proceeding on May 19, 2022, the
Federal Energy Regulatory Commission
(Commission) will convene a
Commissioner-led forum on Thursday,
September 8, 2022, from approximately
9:00 a.m. to 5:00 p.m. Eastern Time, to
discuss the electricity and natural gas
challenges facing the New England
Region. The forum will be open to the
public and held in the Emerald I & II
Ballroom at the DoubleTree by Hilton
Burlington Vermont, 870 Williston Rd.,
South Burlington, VT 05403.
52549
The updated agenda for this forum is
attached, which includes the final
forum panelists. All changes to this
agenda since the Commission’s July 21,
2022 Supplemental Notice of New
England Winter Gas-Electric Forum
appear in italics.
The purpose of the forum is to bring
together stakeholders in New England to
discuss the challenges faced historically
during New England winters and
discuss the stakeholders’ differing
expectations of challenges for future
winters. The objectives of the forum are
to achieve greater consensus or
agreement among stakeholders in
defining the electric and natural gas
system challenges in New England and
identify what, if any, steps are needed
to better understand those challenges
before identifying solutions.
While the forum is not for the purpose
of discussing any specific matters before
the Commission, some forum
discussions may involve issues raised in
proceedings that are currently pending
before the Commission. These
proceedings include, but are not limited
to—changes or additions to the list
below appear in italics:
Docket Nos.
Constellation Mystic Power LLC ..............................................................
ISO New England Inc ...............................................................................
lotter on DSK11XQN23PROD with NOTICES1
RENEW Northeast and American Clean Power Association vs. ISO
New England Inc.
NextEra Energy Seabrook, LLC ...............................................................
NECEC Transmission LLC and Avangrid, Inc. v. NextEra Energy Resources, LLC.
Only Commissioners and panelists
will participate in the panel
discussions. The forum will be open to
the public for listening and observing,
and written comments may be
submitted in Docket No. AD22–9–000.
Registration for in-person attendance
is required, and there is no fee for
attendance. A link to attendee
registration is available on the New
England Winter Gas-Electric Forum
event page. Due to space constraints,
seating for this event will be limited and
registrants that get a confirmed space
will be contacted via email. Only
confirmed registrants can be admitted to
the forum given the maximum
occupancy limit at the venue (as
required by fire and building safety
code). Therefore, the Commission
encourages members of the public who
1 Docket descriptive corrected from July 21, 2022
supplemental notice.
VerDate Sep<11>2014
16:59 Aug 25, 2022
Jkt 256001
ER18–1639–000, ER18–1639–014, ER18–1639–015, ER18–1639–
017, ER22–1192–000.
ER19–1428–000, ER19–1428–001, ER19–1428–002, ER19–1428–
003, ER19–1428–004.
EL22–42–000.1
EL21–3–000.
EL21–6–000.
wish to attend this event in person to
register at their earliest convenience.
Online registration will be open, as long
as attendance capacity is available, until
the day before the forum (September 7).
Once registration has reached capacity,
registration will be closed. However,
those interested in attending after
capacity has been reached can join a
waiting list (using the same registration
link) and be notified if space becomes
available. Those who are unable to
attend in person may watch the free
webcast.
The webcast will allow persons to
listen and observe the forum remotely
but not participate. Information on this
forum, including a link to the webcast,
will be posted prior to the event on this
forum’s event page on the Commission’s
website. A recording of the webcast will
be made available after the forum in the
same location on the Calendar of Events.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
The forum will be transcribed.
Transcripts of the forum will be
available for a fee from Ace-Federal
Reporters, Inc. (202–347–3700).
Additionally, please note that the
Commission will be implementing
health and safety restrictions, as
appropriate, associated with the Centers
for Disease Control and Prevention
(CDC) COVID Community Level
mitigations. This may include requiring
all participants to wear cloth face covers
or masks as well as further limiting
venue occupancy if Chittenden County
is designated as having a highcommunity level in data expected to be
released on the evening of Thursday,
September 1. The CDC Community
Level tracker may be found at the CDC
COVID Data Tracker site.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
E:\FR\FM\26AUN1.SGM
26AUN1
Agencies
[Federal Register Volume 87, Number 165 (Friday, August 26, 2022)]
[Notices]
[Pages 52548-52549]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-18419]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-121-000]
National Grid LNG LLC; Notice of Request for Extension of Time
Take notice that on August 16, 2022, National Grid LNG LLC
(National Grid) requested that the Federal Energy Regulatory Commission
(Commission) grant an extension of time (2022 Extension of Time
Request), until June 1, 2023, to complete construction of, and place
into service, its Fields Point Liquefaction Project located in
Providence, RI as authorized in the October 17, 2018 Order Issuing
Certificate (Certificate Order).\1\ Ordering Paragraph B(1) of the
Certificate Order required National Grid to complete the construction
of the proposed Fields Point Liquefaction Project facilities \2\ and
make them available for service within three years from issuance, or by
October 17, 2021.\3\
---------------------------------------------------------------------------
\1\ National Grid LNG LLC, 165 FERC ] 61,031 (2018) (Certificate
Order).
\2\ The Fields Point Liquefaction Project consists of the
construction of one (1) new 20 million cubic feet per day (MMcf/d)
gas pretreatment and liquefaction system to convert natural gas
delivered by pipeline into liquefied natural gas (LNG). The
liquefaction facility is designed to enable National Gas to provide
up to 20,600 dekatherms per day (Dth/day) liquefaction service at
its existing LNG storage facility located in Providence, RI.
\3\ Id. at ordering para. (B)(1).
---------------------------------------------------------------------------
On December 8, 2020 National Grid filed a request for an extension
of time for an additional twelve months to complete construction and
place into service the authorized construction at the LNG storage
facility at Fields Point. National Grid was granted a one-year
extension of time, until and including October 17, 2022, to complete
abandonment activities authorized in the above referenced docket.
National Grid states that the Project was on-schedule to be placed
in service before October 17, 2022, however, National Grid had to
suspend the testing and commissioning process on May 23, 2022, due to
objections from the PPL Corporation-owned LDC regarding odorant levels
in the tail gas flowing into the LDC system on that date. National Grid
states that despite diligent efforts to design, engineer and procure
all of the components for the mercaptan removal system, supply chain
delays have occurred. National Grid states that potential supply
shortfall could lead to further delays in completing the testing to
begin service until the following Spring. For that reason and
dependence upon meteorological conditions during the Fall months,
National Grid requests an extension to June 1, 2023 for the date to
place the facilities in service.
This notice establishes a 15-calendar day intervention and comment
period deadline. Any person wishing to comment on National Grid's
request for an extension of time may do so. No reply comments or
answers will be considered. If you wish to obtain legal status by
becoming a party to the proceedings for this request, you should, on or
before the comment date stated below, file a motion to intervene in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
Natural Gas Act (18 CFR 157.10).
As a matter of practice, the Commission itself generally acts on
requests for extensions of time to complete construction for Natural
Gas Act facilities when such requests are contested before order
issuance. For those extension requests that are contested,\4\ the
Commission will aim to issue an order acting on the request within 45
days.\5\ The Commission will address all arguments relating to whether
the applicant has demonstrated there is good cause to grant the
extension.\6\ The Commission will not consider arguments that re-
litigate the issuance of the certificate order, including whether the
Commission properly found the project to be in the public convenience
and necessity and whether the Commission's environmental analysis for
the certificate complied with the National Environmental Policy Act.\7\
At the time a pipeline requests an extension of time, orders on
certificates of public convenience and necessity are final and the
Commission will not re-litigate their issuance.\8\ The OEP Director, or
his or her designee, will act on all of those extension requests that
are uncontested.
---------------------------------------------------------------------------
\4\ Contested proceedings are those where an intervenor disputes
any material issue of the filing. 18 CFR 385.2201(c)(1) (2019).
\5\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
\6\ Id. at P 40.
\7\ Similarly, the Commission will not re-litigate the issuance
of an NGA section 3 authorization, including whether a proposed
project is not inconsistent with the public interest and whether the
Commission's environmental analysis for the permit order complied
with NEPA.
\8\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, The Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://
[[Page 52549]]
www.ferc.gov) using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. At this time, the Commission has suspended access to
Commission's Public Reference Room, due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and three copies of the protest or intervention to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on September 6, 2022.
Dated: August 22, 2022.
Kimberly D. Bose,
Secretary.