Combined Notice of Filings #1, 52383-52384 [2022-18333]
Download as PDF
Federal Register / Vol. 87, No. 164 / Thursday, August 25, 2022 / Notices
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by October 26, 2022.
p. The Commission’s scoping process
will help determine the required level of
analysis and satisfy the NEPA scoping
requirements, irrespective of whether
the Commission prepares an
environmental assessment or
Environmental Impact Statement.
Scoping Process
Due to ongoing concerns with large
gatherings related to COVID–19, we do
not intend to hold in-person public
scoping meetings or an in-person
environmental site review. Rather,
Commission staff will hold two public
scoping meetings using a telephone
conference line. The daytime scoping
meeting will focus on resource agency,
Indian tribes, and non-governmental
organization (NGO) concerns, while the
evening scoping meeting will focus on
receiving input from the public. We
invite all interested agencies, Native
American tribes, NGOs, and individuals
to attend one of these meetings to assist
us in identifying the scope of
environmental issues that should be
analyzed in the NEPA document.
Additionally, a virtual site tour of the
proposed project should be posted on
Western Minnesota Power’s licensing
website prior to the scoping meetings.
Visuals included in the virtual site tour
will be referenced during Western
Minnesota Power’s presentation of the
project during the scoping meetings.
The dates and times of the meetings as
well as how to access the virtual site
tour are listed below.
khammond on DSKJM1Z7X2PROD with NOTICES
Virtual Site Tour of the Project
Access online at: https://
www.mrenergy.com/energy-resources/
gregory-county-pumped-storageproject
Meeting for Resource Agencies, Tribes,
and NGOs
Thursday, September 22, 2022, 10:00
a.m.–12:00 p.m. CDT, Call in number:
(800) 779–8625, Access code: 3472916
Following entry of the access code,
please provide the required details
when prompted.
Meeting for the General Public
Thursday, September 22, 2022, 6:00
p.m.–8:00 p.m. CDT, Call in number:
(800) 779–8625, Access code: 3472916
Following entry of the access code,
please provide the required details
when prompted.
VerDate Sep<11>2014
16:25 Aug 24, 2022
Jkt 256001
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list and Western
Minnesota Power’s distribution list.
Copies of SD1 may be viewed on the
web at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 will include a
revised process plan and schedule, as
well as a list of issues, based on the
scoping process.
Meeting Objectives
At the scoping meetings, Commission
staff will: (1) initiate scoping of the
issues; (2) review and discuss existing
conditions; (3) review and discuss
existing information and identify
preliminary information and study
needs; (4) review and discuss the
process plan and schedule for pre-filing
activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the potential of any federal or
state agency or Indian tribe to act as a
cooperating agency for development of
an environmental document. Meeting
participants should come prepared to
discuss their issues and/or concerns.
Please review the PAD in preparation
for the scoping meetings. Directions on
how to obtain a copy of the PAD and
SD1 are included in item n of this
document.
Meeting Procedures
Commission staff will be moderating
the scoping meetings. The meetings will
begin promptly at their respective start
times listed above.
At the start of the meeting, staff will
provide further instructions regarding
the meeting setup, agenda, and time
period for comments and questions. We
ask for your patience as staff present
information and field participant
comments in an orderly manner. To
indicate you have a question or
comment, press * and 3 to virtually
‘‘raise your hand.’’ Oral comments will
be limited to 5 minutes in duration for
each participant. The meetings will be
recorded by a stenographer and will be
filed to the public record of the project.
Please note, that if no participants
join the meetings within 15 minutes
after the start time, staff will end the
meeting and conference call. The
meetings will end after participants
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
52383
have presented their oral comments or
at the specified end time, whichever
occurs first.
Dated: August 19, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18336 Filed 8–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–110–000.
Applicants: Consumers Energy
Company, New Covert Generating
Company, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Consumers Energy
Company, et al.
Filed Date: 8/18/22.
Accession Number: 20220818–5162.
Comment Date: 5 p.m. ET 9/8/22.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–207–000.
Applicants: MTSun LLC.
Description: MTSun LLC submits
Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 8/19/22.
Accession Number: 20220819–5021.
Comment Date: 5 p.m. ET 9/9/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–21–004.
Applicants: Harts Mill Solar, LLC.
Description: Compliance filing:
Revised Live Tariff Records in Docket
ER21–000 to be effective 12/29/2020.
Filed Date: 8/19/22.
Accession Number: 20220819–5120.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–1610–001.
Applicants: Big River Solar, LLC.
Description: Compliance filing:
Revised Rate Schedule FERC No. 1 to be
effective 7/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5109.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2672–001.
Applicants: American Municipal
Power, Inc., PJM Interconnection, L.L.C.
Description: Tariff Amendment:
American Municipal Power, Inc.
submits tariff filing per 35.17(b):
Correction to Second Revised NITSA,
E:\FR\FM\25AUN1.SGM
25AUN1
khammond on DSKJM1Z7X2PROD with NOTICES
52384
Federal Register / Vol. 87, No. 164 / Thursday, August 25, 2022 / Notices
SA No. 4264—Docket No. ER22–2672 to
be effective 8/3/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5057.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2688–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: AMEA NITSA
Amendment Filing (Add Sylacauga No.
3 DP) to be effective 7/21/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5000.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2689–000.
Applicants: MTSun LLC.
Description: Baseline eTariff Filing:
MTSun LLC MBR Application Filing to
be effective 8/20/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5053.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2690–000.
Applicants: PPL Electric Utilities
Corporation, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: PPL
Electric Utilities Corporation submits
tariff filing per 35.13(a)(2)(iii: PJM TOs
propose OATT, Schedule 12—Appx C
for State Agreement Approach Projects
to be effective 10/19/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5064.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2691–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–08–19_SA 6521 MISO-Union
Electric SSR Agreement for Rush Island
to be effective 9/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5074.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2692–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–08–19_Submittal of Schedule 43K
Rush Island SSR Cost Allocation to be
effective 9/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5095.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2693–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original IISA, Service Agreement No.
6573; Queue No. AF2–083 to be
effective 7/20/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5098.
VerDate Sep<11>2014
16:25 Aug 24, 2022
Jkt 256001
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2694–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of WMPA, SA
No. 5809; Queue No. AF2–273 re:
breach to be effective 5/25/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5119.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2695–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of WMPA, SA
No. 5546; Queue No. AE2–056 re:
breach to be effective 6/27/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5127.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2696–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: ESM
Const Agmt Klamath Decommissioning
to be effective 10/19/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5129.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–2697–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of WMPA, SA
No. 5547; Queue No. AE2–081 re:
breach to be effective 6/27/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5137.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22–834–004.
Applicants: PacifiCorp.
Description: Compliance filing: OATT
Revised LGIP & SGIP Compliance Filing
8/19/2022 to be effective 4/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819–5125.
Comment Date: 5 p.m. ET 9/9/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 19, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18333 Filed 8–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL22–82–000]
El Paso Electric Company; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On August 19, 2022, the Commission
issued an order in Docket No. EL22–82–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, instituting an investigation into
whether El Paso Electric Company’s
Large Generator Interconnection
Procedures are unjust, unreasonable,
unduly discriminatory or preferential,
or otherwise unlawful and to establish
a refund effective date.1 El Paso Electric
Company, 180 FERC ¶ 61,104 (2022).
The refund effective date in Docket
No. EL22–82–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL22–82–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2021),
within 21 days of the date of issuance
of the order.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
1 The section 206 investigation will extend to any
affiliate of Applicant with market-based rate
authorization.
E:\FR\FM\25AUN1.SGM
25AUN1
Agencies
[Federal Register Volume 87, Number 164 (Thursday, August 25, 2022)]
[Notices]
[Pages 52383-52384]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-18333]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC22-110-000.
Applicants: Consumers Energy Company, New Covert Generating
Company, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Consumers Energy Company, et al.
Filed Date: 8/18/22.
Accession Number: 20220818-5162.
Comment Date: 5 p.m. ET 9/8/22.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG22-207-000.
Applicants: MTSun LLC.
Description: MTSun LLC submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 8/19/22.
Accession Number: 20220819-5021.
Comment Date: 5 p.m. ET 9/9/22.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER21-21-004.
Applicants: Harts Mill Solar, LLC.
Description: Compliance filing: Revised Live Tariff Records in
Docket ER21-000 to be effective 12/29/2020.
Filed Date: 8/19/22.
Accession Number: 20220819-5120.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-1610-001.
Applicants: Big River Solar, LLC.
Description: Compliance filing: Revised Rate Schedule FERC No. 1 to
be effective 7/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5109.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2672-001.
Applicants: American Municipal Power, Inc., PJM Interconnection,
L.L.C.
Description: Tariff Amendment: American Municipal Power, Inc.
submits tariff filing per 35.17(b): Correction to Second Revised NITSA,
[[Page 52384]]
SA No. 4264--Docket No. ER22-2672 to be effective 8/3/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5057.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2688-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: AMEA NITSA Amendment Filing
(Add Sylacauga No. 3 DP) to be effective 7/21/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5000.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2689-000.
Applicants: MTSun LLC.
Description: Baseline eTariff Filing: MTSun LLC MBR Application
Filing to be effective 8/20/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5053.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2690-000.
Applicants: PPL Electric Utilities Corporation, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: PPL Electric Utilities
Corporation submits tariff filing per 35.13(a)(2)(iii: PJM TOs propose
OATT, Schedule 12--Appx C for State Agreement Approach Projects to be
effective 10/19/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5064.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2691-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2022-08-19_SA 6521 MISO-
Union Electric SSR Agreement for Rush Island to be effective 9/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5074.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2692-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2022-08-19_Submittal of
Schedule 43K Rush Island SSR Cost Allocation to be effective 9/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5095.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2693-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original IISA, Service
Agreement No. 6573; Queue No. AF2-083 to be effective 7/20/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5098.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2694-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of WMPA, SA
No. 5809; Queue No. AF2-273 re: breach to be effective 5/25/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5119.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2695-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of WMPA, SA
No. 5546; Queue No. AE2-056 re: breach to be effective 6/27/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5127.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2696-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: ESM Const Agmt Klamath
Decommissioning to be effective 10/19/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5129.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-2697-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of WMPA, SA
No. 5547; Queue No. AE2-081 re: breach to be effective 6/27/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5137.
Comment Date: 5 p.m. ET 9/9/22.
Docket Numbers: ER22-834-004.
Applicants: PacifiCorp.
Description: Compliance filing: OATT Revised LGIP & SGIP Compliance
Filing 8/19/2022 to be effective 4/1/2022.
Filed Date: 8/19/22.
Accession Number: 20220819-5125.
Comment Date: 5 p.m. ET 9/9/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 19, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-18333 Filed 8-24-22; 8:45 am]
BILLING CODE 6717-01-P