Columbia Gas Transmission, LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Virginia Electrification Project, 52378-52379 [2022-18332]
Download as PDF
52378
Federal Register / Vol. 87, No. 164 / Thursday, August 25, 2022 / Notices
whether it may now be inappropriate or
inapplicable.
[FR Doc. 2022–18259 Filed 8–24–22; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–498–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Availability of the Draft
Environmental Impact Statement for
the Proposed Virginia Electrification
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Virginia Electrification Project
(Project), proposed by Columbia Gas
Transmission, LLC (Columbia) in the
above-referenced docket. Columbia
requests authorization to construct and
operate natural gas facilities in Virginia.
The Project is designed to provide
35,000 dekatherms per day of
incremental mainline capacity on
Columbia’s pipeline system. The Project
would address a request from Columbia
Gas of Virginia, an unaffiliated local
distribution company, for firm
transportation service to meet growing
energy demand in the southeast Virginia
market area off of Columbia’s existing
VM–107, VM–108, and VM–109
pipelines.
This draft EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA).
Columbia’s Project facilities include:
one zero emission electric motor
compressor unit at the Boswells Tavern
Compressor Station located in Louisa
County; facility modifications to the
Boswells Tavern point of receipt located
in Louisa County to allow for increased
capacity; replacement of all five existing
gas-powered compressor units at the
Goochland Compressor Station, located
in Goochland County, with new units
that will run exclusively on electric
motors, but will have the ability to run
on gas in order to ensure reliability; and
change the status of an existing
compressor unit from backup mode to
active mode and increase the site-rated
station horsepower to 5,500 horsepower
at the Petersburg Compressor Station
located in Prince George County. The
FERC staff concludes that approval of
the proposed Project, with the
VerDate Sep<11>2014
16:25 Aug 24, 2022
Jkt 256001
mitigation measures recommended in
the EIS, would result in some adverse
environmental impacts; however, with
the exception of climate change
impacts, those impacts would not be
significant. The EIS is not characterizing
the Project’s greenhouse gas emissions
as significant or insignificant because
the Commission is conducting a generic
proceeding to determine whether and
how the Commission will conduct
significance determinations going
forward.1 The EIS also concludes that
no system, route, or other alternative
would meet the Project objective while
providing a significant environmental
advantage over the Project as proposed.
The Commission mailed a copy of the
Notice of Availability of the Draft
Environmental Impact Statement for the
Proposed Virginia Electrification Project
to federal, state, and local government
representatives and agencies; local
libraries; newspapers; elected officials;
Native American Tribes; and other
interested parties. The draft EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
environmental-documents). In addition,
the draft EIS may be accessed by using
the eLibrary link on the FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search) select
‘‘General Search’’ and enter the docket
number in the ‘‘Docket Number’’ field
(i.e., CP21–498–000). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
The draft EIS is not a decision
document. It presents Commission
staff’s independent analysis of the
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding. Any person wishing to
comment on the draft EIS may do so.
Your comments should focus on the
draft EIS’s disclosure and discussion of
potential environmental effects,
measures to avoid or lessen
environmental impacts and the
completeness of the submitted
alternatives, information, and analyses.
To ensure consideration of your
comments on the proposal in the final
EIS, it is important that the Commission
receive your comments on or before 5:00
p.m. Eastern Time on October 11, 2022.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. This is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ If you are filing a comment
on a particular project, please select
‘‘Comment on a Filing’’ as the filing
type; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP21–498–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR part 385.214).
Motions to intervene are more fully
described at https://www.ferc.gov/howintervene. Only intervenors have the
right to seek rehearing or judicial review
of the Commission’s decision. The
Commission grants affected landowners
and others with environmental concerns
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which no other party can adequately
represent. Simply filing environmental
comments will not give you intervenor
status, but you do not need intervenor
status to have your comments
considered.
Questions?
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
E:\FR\FM\25AUN1.SGM
25AUN1
Federal Register / Vol. 87, No. 164 / Thursday, August 25, 2022 / Notices
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: August 19, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–18332 Filed 8–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–486–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Texas Eastern Transmission, LP;
Notice of Intent To Prepare an
Environmental Impact Statement for
the Proposed Appalachia to Market II
and Entriken HP Replacement Project
and Request for Comments on
Environmental Issues, and Schedule
for Environmental Review
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the Appalachia to Market II
and Entriken HP Replacement Project
(Project) involving construction and
operation of facilities by Texas Eastern
Transmission, LP (Texas Eastern) in
Lebanon, Indiana, and Huntingdon
counties, Pennsylvania. The
Commission will use this EIS in its
decision-making process to determine
whether the Project is in the public
convenience and necessity. The
schedule for preparation of the EIS is
discussed in the Schedule for
Environmental Review section of this
notice.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
VerDate Sep<11>2014
16:25 Aug 24, 2022
Jkt 256001
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and the EIS section of this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document, including
comments on potential alternatives and
impacts, and any relevant information,
studies, or analyses of any kind
concerning impacts affecting the quality
of the human environment. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
September 19, 2022. Comments may be
submitted in written or oral form.
Further details on how to submit
comments are provided in the Public
Participation section of this notice.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the Project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not grant, exercise, or
oversee the exercise of eminent domain
authority. The courts have exclusive
authority to handle eminent domain
cases; the Commission has no
jurisdiction over these matters.
Texas Eastern provided landowners
with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ which addresses typically
asked questions, including the use of
eminent domain and how to participate
in the Commission’s proceedings. This
fact sheet along with other landowner
topics of interest are available for
viewing on the FERC website
(www.ferc.gov) under the Natural Gas
Questions or Landowner Topics link.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
52379
Public Participation
There are three methods you can use
to submit your comments to the
Commission. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP22–486–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Additionally, the Commission offers a
free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Summary of the Proposed Project, the
Project Purpose and Need, and
Expected Impacts
Texas Eastern proposes to abandon
certain facilities and to construct,
install, own, operate, and maintain
facilities in Lebanon, Indiana, and
Huntingdon counties in Pennsylvania.
According to Texas Eastern, the Project
is designed to improve reliability on the
Texas Eastern system by replacing an
E:\FR\FM\25AUN1.SGM
25AUN1
Agencies
[Federal Register Volume 87, Number 164 (Thursday, August 25, 2022)]
[Notices]
[Pages 52378-52379]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-18332]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-498-000]
Columbia Gas Transmission, LLC; Notice of Availability of the
Draft Environmental Impact Statement for the Proposed Virginia
Electrification Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared a draft environmental impact statement (EIS)
for the Virginia Electrification Project (Project), proposed by
Columbia Gas Transmission, LLC (Columbia) in the above-referenced
docket. Columbia requests authorization to construct and operate
natural gas facilities in Virginia. The Project is designed to provide
35,000 dekatherms per day of incremental mainline capacity on
Columbia's pipeline system. The Project would address a request from
Columbia Gas of Virginia, an unaffiliated local distribution company,
for firm transportation service to meet growing energy demand in the
southeast Virginia market area off of Columbia's existing VM-107, VM-
108, and VM-109 pipelines.
This draft EIS assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act (NEPA).
Columbia's Project facilities include: one zero emission electric motor
compressor unit at the Boswells Tavern Compressor Station located in
Louisa County; facility modifications to the Boswells Tavern point of
receipt located in Louisa County to allow for increased capacity;
replacement of all five existing gas-powered compressor units at the
Goochland Compressor Station, located in Goochland County, with new
units that will run exclusively on electric motors, but will have the
ability to run on gas in order to ensure reliability; and change the
status of an existing compressor unit from backup mode to active mode
and increase the site-rated station horsepower to 5,500 horsepower at
the Petersburg Compressor Station located in Prince George County. The
FERC staff concludes that approval of the proposed Project, with the
mitigation measures recommended in the EIS, would result in some
adverse environmental impacts; however, with the exception of climate
change impacts, those impacts would not be significant. The EIS is not
characterizing the Project's greenhouse gas emissions as significant or
insignificant because the Commission is conducting a generic proceeding
to determine whether and how the Commission will conduct significance
determinations going forward.\1\ The EIS also concludes that no system,
route, or other alternative would meet the Project objective while
providing a significant environmental advantage over the Project as
proposed.
The Commission mailed a copy of the Notice of Availability of the
Draft Environmental Impact Statement for the Proposed Virginia
Electrification Project to federal, state, and local government
representatives and agencies; local libraries; newspapers; elected
officials; Native American Tribes; and other interested parties. The
draft EIS is only available in electronic format. It may be viewed and
downloaded from the FERC's website (www.ferc.gov), on the natural gas
environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In addition, the
draft EIS may be accessed by using the eLibrary link on the FERC's
website. Click on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search) select ``General Search'' and enter the docket number
in the ``Docket Number'' field (i.e., CP21-498-000). Be sure you have
selected an appropriate date range. For assistance, please contact FERC
Online Support at [email protected] or toll free at (866) 208-
3676, or for TTY, contact (202) 502-8659.
The draft EIS is not a decision document. It presents Commission
staff's independent analysis of the environmental issues for the
Commission to consider when addressing the merits of all issues in this
proceeding. Any person wishing to comment on the draft EIS may do so.
Your comments should focus on the draft EIS's disclosure and discussion
of potential environmental effects, measures to avoid or lessen
environmental impacts and the completeness of the submitted
alternatives, information, and analyses. To ensure consideration of
your comments on the proposal in the final EIS, it is important that
the Commission receive your comments on or before 5:00 p.m. Eastern
Time on October 11, 2022.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov) under the link to
FERC Online. This is an easy method for submitting brief, text-only
comments on a project;
(2) You can file your comments electronically by using the eFiling
feature on the Commission's website (www.ferc.gov) under the link to
FERC Online. With eFiling, you can provide comments in a variety of
formats by attaching them as a file with your submission. New eFiling
users must first create an account by clicking on ``eRegister.'' If you
are filing a comment on a particular project, please select ``Comment
on a Filing'' as the filing type; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP21-
498-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, MD 20852.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR part 385.214). Motions to intervene are
more fully described at https://www.ferc.gov/how-intervene. Only
intervenors have the right to seek rehearing or judicial review of the
Commission's decision. The Commission grants affected landowners and
others with environmental concerns intervenor status upon showing good
cause by stating that they have a clear and direct interest in this
proceeding which no other party can adequately represent. Simply filing
environmental comments will not give you intervenor status, but you do
not need intervenor status to have your comments considered.
Questions?
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link
also
[[Page 52379]]
provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/ferc-online/overview to
register for eSubscription.
Dated: August 19, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-18332 Filed 8-24-22; 8:45 am]
BILLING CODE 6717-01-P