Download as PDF Federal Register / Vol. 87, No. 161 / Monday, August 22, 2022 / Notices Signing Authority: This document of the Department of Energy was signed on August 15, 2022, by Candice D. Palen, Information Collection Clearance Manager, Bonneville Power Administration, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on August 17, 2022. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2022–18025 Filed 8–19–22; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jspears on DSK121TN23PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER22–2178–001. Applicants: ORNI 50 LLC. Description: Tariff Amendment: Amendment to be effective 6/24/2022. Filed Date: 8/16/22. Accession Number: 20220816–5027. Comment Date: 5 p.m. ET 8/30/22. Docket Numbers: ER22–2187–000; ER22–2188–000. Applicants: Northwest Ohio IA, LLC, Northwest Ohio Solar, LLC. Description: Supplement to June 24, 2022 Northwest Ohio Solar, LLC, et al. tariff filing. Filed Date: 8/12/22. Accession Number: 20220812–5237. Comment Date: 5 p.m. ET 9/2/22. Docket Numbers: ER22–2246–000. Applicants: BCE Los Alamitos, LLC. Description: Report Filing: Supplement to Market-Based Rate Application to be effective N/A. Filed Date: 8/16/22. Accession Number: 20220816–5061. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2337–000. Applicants: New Hampshire Industries, Inc. VerDate Sep<11>2014 18:17 Aug 19, 2022 Jkt 256001 Description: Notice of Cancellation of Market Based Rate Tariff of New Hampshire Industries, Inc. Filed Date: 7/7/22. Accession Number: 20220707–5224. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2646–001. Applicants: Graphite Solar 1, LLC. Description: Notice of Non-Material Change in Status of Graphite Solar I, LLC. Filed Date: 8/16/22. Accession Number: 20220816–5110. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2663–000. Applicants: Aron Energy Prepay 15 LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/15/2022. Filed Date: 8/15/22. Accession Number: 20220815–5168. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2664–000. Applicants: Aron Energy Prepay 16 LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/15/2022. Filed Date: 8/15/22. Accession Number: 20220815–5170. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2665–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Notice of Cancellation of WMPA, SA No. 6021; Queue No. AG1–064 to be effective 8/23/2022. Filed Date: 8/16/22. Accession Number: 20220816–5011. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2666–000. Applicants: Cheyenne Light, Fuel and Power Company. Description: Tariff Amendment: Notice of Cancellation of Service Agreement No. 101 to be effective 7/19/ 2022. Filed Date: 8/16/22. Accession Number: 20220816–5079. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2667–000. Applicants: ISO New England Inc. Description: ISO New England Inc. submits Capital Budget Quarterly Filing for Second Quarter of 2022. Filed Date: 8/11/22. Accession Number: 20220811–5164. Comment Date: 5 p.m. ET 9/1/22. Docket Numbers: ER22–2668–000. Applicants: Wisconsin Electric Power Company. Description: § 205(d) Rate Filing: Formula Rate Update Filing for 2021 Rate Year to be effective 10/16/2022. Filed Date: 8/16/22. PO 00000 Frm 00076 Fmt 4703 Sfmt 4703 51405 Accession Number: 20220816–5090. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2669–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Second Revised No. 3518 NITSA among PJM and LGE/KU to be effective 6/1/ 2023. Filed Date: 8/16/22. Accession Number: 20220816–5104. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2670–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Blackbriar Farm LGIA Filing to be effective 8/8/2022. Filed Date: 8/16/22. Accession Number: 20220816–5105. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2671–000. Applicants: Georgia Power Company. Description: Initial rate filing: SR Ailey Affected System Construction Agreement Filing to be effective 8/2/ 2022. Filed Date: 8/16/22. Accession Number: 20220816–5117. Comment Date: 5 p.m. ET 9/6/22. Docket Numbers: ER22–2672–000. Applicants: American Municipal Power, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: American Municipal Power, Inc. submits tariff filing per 35.13(a)(2)(iii: Second Revised Service Agreement No. 4264—NITSA among PJM and AMP to be effective 8/3/2022. Filed Date: 8/16/22. Accession Number: 20220816–5124. Comment Date: 5 p.m. ET 9/6/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\22AUN1.SGM 22AUN1 51406 Federal Register / Vol. 87, No. 161 / Monday, August 22, 2022 / Notices Dated: August 16, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–18043 Filed 8–19–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–494–000] jspears on DSK121TN23PROD with NOTICES Boardwalk Storage Company, LLC; Notice of Application and Establishing Intervention Deadline Take notice that on August 5, 2022, Boardwalk Storage Company, LLC (Boardwalk Storage), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046 filed in the above referenced docket an application pursuant to section 7(b), 7(c) and 7(e) of the Natural Gas Act and Part 157 of the Commission’s regulations requesting abandon by replacement of the existing inoperable electric-driven 10,000 horsepower (HP) compressor designated (Unit 1) and certain auxiliary equipment with an electric- driven 9,000 horsepower (HP) compressor designated (Unit 3) and certain auxiliary equipment all located in Iberville Parish, Louisiana. Boardwalk Storage does not propose the abandonment of service to any customers as result of the in the replacement. All as more fully set forth in the application which is on file with the Commission and open for the public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Juan Eligio Jr., Vice President, Regulatory Affairs, Boardwalk Storage Company, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046; by phone (713) VerDate Sep<11>2014 18:17 Aug 19, 2022 Jkt 256001 479–3480; or by email: juan.eligio@ bwpipelines.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on September 6, 2022. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 1 18 CFR (Code of Federal Regulations) 157.9. CFR 157.205. 3 Persons include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 18 PO 00000 Frm 00077 Fmt 4703 Sfmt 4703 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is September 6, 2022. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which September 6, 2022. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely 4 18 CFR 157.205(e). CFR 385.214. 6 18 CFR 157.10. 5 18 E:\FR\FM\22AUN1.SGM 22AUN1

Agencies

[Federal Register Volume 87, Number 161 (Monday, August 22, 2022)]
[Notices]
[Pages 51405-51406]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-18043]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER22-2178-001.
    Applicants: ORNI 50 LLC.
    Description: Tariff Amendment: Amendment to be effective 6/24/2022.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5027.
    Comment Date: 5 p.m. ET 8/30/22.

    Docket Numbers: ER22-2187-000; ER22-2188-000.
    Applicants: Northwest Ohio IA, LLC, Northwest Ohio Solar, LLC.
    Description: Supplement to June 24, 2022 Northwest Ohio Solar, LLC, 
et al. tariff filing.
    Filed Date: 8/12/22.
    Accession Number: 20220812-5237.
    Comment Date: 5 p.m. ET 9/2/22.

    Docket Numbers: ER22-2246-000.
    Applicants: BCE Los Alamitos, LLC.
    Description: Report Filing: Supplement to Market-Based Rate 
Application to be effective N/A.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5061.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2337-000.
    Applicants: New Hampshire Industries, Inc.
    Description: Notice of Cancellation of Market Based Rate Tariff of 
New Hampshire Industries, Inc.
    Filed Date: 7/7/22.
    Accession Number: 20220707-5224.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2646-001.
    Applicants: Graphite Solar 1, LLC.
    Description: Notice of Non-Material Change in Status of Graphite 
Solar I, LLC.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5110.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2663-000.
    Applicants: Aron Energy Prepay 15 LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/15/2022.
    Filed Date: 8/15/22.
    Accession Number: 20220815-5168.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2664-000.
    Applicants: Aron Energy Prepay 16 LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/15/2022.
    Filed Date: 8/15/22.
    Accession Number: 20220815-5170.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2665-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Notice of Cancellation of WMPA, SA 
No. 6021; Queue No. AG1-064 to be effective 8/23/2022.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5011.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2666-000.
    Applicants: Cheyenne Light, Fuel and Power Company.
    Description: Tariff Amendment: Notice of Cancellation of Service 
Agreement No. 101 to be effective 7/19/2022.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5079.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2667-000.
    Applicants: ISO New England Inc.
    Description: ISO New England Inc. submits Capital Budget Quarterly 
Filing for Second Quarter of 2022.
    Filed Date: 8/11/22.
    Accession Number: 20220811-5164.
    Comment Date: 5 p.m. ET 9/1/22.

    Docket Numbers: ER22-2668-000.
    Applicants: Wisconsin Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Formula Rate Update Filing 
for 2021 Rate Year to be effective 10/16/2022.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5090.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2669-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Second Revised No. 3518 
NITSA among PJM and LGE/KU to be effective 6/1/2023.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5104.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2670-000.
    Applicants: Alabama Power Company, Georgia Power Company, 
Mississippi Power Company.
    Description: Sec.  205(d) Rate Filing: Alabama Power Company 
submits tariff filing per 35.13(a)(2)(iii: Blackbriar Farm LGIA Filing 
to be effective 8/8/2022.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5105.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2671-000.
    Applicants: Georgia Power Company.
    Description: Initial rate filing: SR Ailey Affected System 
Construction Agreement Filing to be effective 8/2/2022.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5117.
    Comment Date: 5 p.m. ET 9/6/22.

    Docket Numbers: ER22-2672-000.
    Applicants: American Municipal Power, Inc., PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: American Municipal Power, 
Inc. submits tariff filing per 35.13(a)(2)(iii: Second Revised Service 
Agreement No. 4264--NITSA among PJM and AMP to be effective 8/3/2022.
    Filed Date: 8/16/22.
    Accession Number: 20220816-5124.
    Comment Date: 5 p.m. ET 9/6/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.


[[Page 51406]]


    Dated: August 16, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-18043 Filed 8-19-22; 8:45 am]