Notice of Final Agency Actions on Proposed Railroad Project in California on Behalf of the California High Speed Rail Authority, 51474 [2022-17956]
Download as PDF
51474
Federal Register / Vol. 87, No. 161 / Monday, August 22, 2022 / Notices
the participants in the program.
Therefore, effective October 1, 2022, all
guaranteed portions of loans in
Standard Pools and WAC Pools
presented for settlement with SBA’s
Fiscal Transfer Agent will be required to
have a minimum maturity ratio of at
least 92.0%. SBA is making this change
pursuant to Section 5(g)(2) of the Small
Business Act, 15 U.S.C. 634(g)(2).
SBA will continue to monitor loan
and pool characteristics and will
provide notification of additional
changes as necessary. It is important to
note that there is no change to SBA’s
obligation to honor its guaranty of the
amounts owed to Registered Holders of
Pool Certificates and that such guaranty
continues to be backed by the full faith
and credit of the United States.
This program change will be
incorporated as necessary into SBA’s
Secondary Market Guide and all other
appropriate SBA Secondary Market
documents. As indicated above, this
change will be effective for Standard
Pools and WAC Pools with an issue date
on or after October 1, 2022.
Dianna L. Seaborn,
Director, Office of Financial Assistance.
[FR Doc. 2022–17958 Filed 8–19–22; 8:45 am]
BILLING CODE P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
Notice of Final Agency Actions on
Proposed Railroad Project in California
on Behalf of the California High Speed
Rail Authority
Federal Railroad
Administration (FRA), U.S. Department
of Transportation (DOT).
ACTION: Notice.
AGENCY:
FRA, on behalf of the
California High-Speed Rail Authority
(Authority), is issuing this notice to
announce actions taken by the
Authority that are final. By this notice,
FRA is advising the public of the time
limit to file a claim seeking judicial
review of the actions. The actions relate
to the Stockton Diamond Grade
Separation Project (Project). These
actions grant approvals for project
implementation pursuant to the
National Environmental Policy Act
(NEPA) and other laws, regulations, and
executive orders.
DATES: A claim seeking judicial review
of the agency actions on the Project will
be barred unless the claim is filed on or
before August 21, 2024. If Federal law
later authorizes a time period of less
jspears on DSK121TN23PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:17 Aug 19, 2022
Jkt 256001
than 2 years for filing such claim, then
that shorter time period applies.
FOR FURTHER INFORMATION CONTACT:
For the Authority: Scott Rothenberg,
NEPA Assignment Manager,
Environmental Services, California
High-Speed Rail Authority, telephone:
(916) 403–6936; email:
Scott.Rothenberg@hsr.ca.gov.
For San Joaquin Regional Rail
Commission (SJRRC) (Project Sponsor):
Dan Leavitt, Manager of Regional
Initiatives, SJRRC, telephone: (209) 944–
6266; email: dan@acerail.com.
For FRA: Lana Lau, Supervisory
Environmental Protection Specialist,
FRA, telephone: (202) 923–5314; email:
Lana.Lau@dot.gov.
SUPPLEMENTARY INFORMATION: Effective
July 23, 2019, FRA assigned, and the
State of California acting through the
Authority assumed, environmental
responsibilities for the California HighSpeed Rail (HSR) System pursuant to 23
U.S.C. 327.1 Notice is hereby given that
the Authority has taken final agency
actions subject to 23 U.S.C. 139(l)(1); 49
U.S.C. 24201(a)(4) by issuing approvals
for the Project. The Project Sponsor,
SJRRC proposes to grade separate (via a
flyover) a major rail intersection just
south of downtown Stockton known as
the Stockton Diamond. This intersection
accommodates freight and passenger rail
lines and is purportedly the busiest,
most congested railway junction in
California. Once completed, the grade
separation is expected to relieve train
backups, delays, vehicle/rail/bicycle
and pedestrian conflicts, air quality
impacts and increased costs, among
other impacts. The SJRRC and the
Authority have selected the Build
Alternative (Alternative 2) identified in
the Final Environmental Assessment
(Final EA) for the Project because the
Selected Alternative best satisfies the
Purpose and Need for the Project. The
actions by the Authority, and the laws
under which such actions were taken,
are described in the Finding of No
Significant Impact (FONSI) and Final
EA for the Project, approved on July 28,
2022. The FONSI, Final EA, and other
1 Consistent with the Memorandum of
Understanding between the Authority and FRA,
which assigns FRA’s NEPA responsibilities to the
Authority, the Authority has assumed NEPA
responsibilities for the ACEforward Project within
the Altamont Corridor Express (ACE) System. The
ACEforward Project is a phased passenger rail
improvement program to reduce travel time and
improve service reliability and passenger facilities
along the existing Stockton to San Jose rail corridor.
Long-term SJRRC goals for the ACE System include
a suite of projects, such as the Stockton Diamond
Grade Separation Project, that can connect an
improved ACE service within the future California
High-Speed Rail System Phase 2 extension to
Sacramento.
PO 00000
Frm 00145
Fmt 4703
Sfmt 4703
documents are available online in PDF
at SJRRC’s website
(stocktondiamond.com/resources) or by
calling (209) 235–0133 or emailing
info@StocktonDiamond.com. A printed
copy of these documents is available at
the Authority’s office in Sacramento.
The notice applies to the FONSI, Final
EA, and all other Federal agency
decisions with respect to the Project as
of the issuance date of this notice and
all laws under which such actions were
taken, including but not limited to:
1. NEPA;
2. Council on Environmental Quality
regulations;
3. Fixing America’s Surface
Transportation Act (FAST Act);
4. Department of Transportation Act
of 1966, Section 4(f);
5. Land and Water Conservation Fund
(LWCF) Act of 1965, Section 6(f);
6. Clean Air Act Amendments of
1990;
7. Clean Water Act of 1977 and 1987;
8. Endangered Species Act of 1973;
9. Migratory Bird Treaty Act;
10. National Historic Preservation Act
of 1966, as amended;
11. Executive Order 11990, Protection
of Wetlands;
12. Executive Order 11988,
Floodplain Management;
13. Executive Order 12898, Federal
Actions to Address Environmental
Justice in Minority Populations and
Low-Income Populations; and
14. Executive Order 13112, Invasive
Species.
Issued in Washington, DC.
Jamie P. Rennert,
Director, Office of Infrastructure Investment.
[FR Doc. 2022–17956 Filed 8–19–22; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
National Highway Traffic Safety
Administration
[Docket No. NHTSA–2022–0067]
General Motors—Receipt of Petition
for Temporary Exemption From
Various Requirements of the Federal
Motor Vehicle Safety Standards for an
Automated Driving System-Equipped
Vehicle; Request for Comments;
Extension of Comment Period
National Highway Traffic
Safety Administration (NHTSA),
Department of Transportation (DOT).
ACTION: Extension of comment period.
AGENCY:
NHTSA received five requests
to extend the comment period for a
notice NHTSA published on July 21,
SUMMARY:
E:\FR\FM\22AUN1.SGM
22AUN1
Agencies
[Federal Register Volume 87, Number 161 (Monday, August 22, 2022)]
[Notices]
[Page 51474]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17956]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
Notice of Final Agency Actions on Proposed Railroad Project in
California on Behalf of the California High Speed Rail Authority
AGENCY: Federal Railroad Administration (FRA), U.S. Department of
Transportation (DOT).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: FRA, on behalf of the California High-Speed Rail Authority
(Authority), is issuing this notice to announce actions taken by the
Authority that are final. By this notice, FRA is advising the public of
the time limit to file a claim seeking judicial review of the actions.
The actions relate to the Stockton Diamond Grade Separation Project
(Project). These actions grant approvals for project implementation
pursuant to the National Environmental Policy Act (NEPA) and other
laws, regulations, and executive orders.
DATES: A claim seeking judicial review of the agency actions on the
Project will be barred unless the claim is filed on or before August
21, 2024. If Federal law later authorizes a time period of less than 2
years for filing such claim, then that shorter time period applies.
FOR FURTHER INFORMATION CONTACT:
For the Authority: Scott Rothenberg, NEPA Assignment Manager,
Environmental Services, California High-Speed Rail Authority,
telephone: (916) 403-6936; email: [email protected].
For San Joaquin Regional Rail Commission (SJRRC) (Project Sponsor):
Dan Leavitt, Manager of Regional Initiatives, SJRRC, telephone: (209)
944-6266; email: [email protected].
For FRA: Lana Lau, Supervisory Environmental Protection Specialist,
FRA, telephone: (202) 923-5314; email: [email protected].
SUPPLEMENTARY INFORMATION: Effective July 23, 2019, FRA assigned, and
the State of California acting through the Authority assumed,
environmental responsibilities for the California High-Speed Rail (HSR)
System pursuant to 23 U.S.C. 327.\1\ Notice is hereby given that the
Authority has taken final agency actions subject to 23 U.S.C.
139(l)(1); 49 U.S.C. 24201(a)(4) by issuing approvals for the Project.
The Project Sponsor, SJRRC proposes to grade separate (via a flyover) a
major rail intersection just south of downtown Stockton known as the
Stockton Diamond. This intersection accommodates freight and passenger
rail lines and is purportedly the busiest, most congested railway
junction in California. Once completed, the grade separation is
expected to relieve train backups, delays, vehicle/rail/bicycle and
pedestrian conflicts, air quality impacts and increased costs, among
other impacts. The SJRRC and the Authority have selected the Build
Alternative (Alternative 2) identified in the Final Environmental
Assessment (Final EA) for the Project because the Selected Alternative
best satisfies the Purpose and Need for the Project. The actions by the
Authority, and the laws under which such actions were taken, are
described in the Finding of No Significant Impact (FONSI) and Final EA
for the Project, approved on July 28, 2022. The FONSI, Final EA, and
other documents are available online in PDF at SJRRC's website
(stocktondiamond.com/resources) or by calling (209) 235-0133 or
emailing [email protected]. A printed copy of these documents is
available at the Authority's office in Sacramento. The notice applies
to the FONSI, Final EA, and all other Federal agency decisions with
respect to the Project as of the issuance date of this notice and all
laws under which such actions were taken, including but not limited to:
---------------------------------------------------------------------------
\1\ Consistent with the Memorandum of Understanding between the
Authority and FRA, which assigns FRA's NEPA responsibilities to the
Authority, the Authority has assumed NEPA responsibilities for the
ACEforward Project within the Altamont Corridor Express (ACE)
System. The ACEforward Project is a phased passenger rail
improvement program to reduce travel time and improve service
reliability and passenger facilities along the existing Stockton to
San Jose rail corridor. Long-term SJRRC goals for the ACE System
include a suite of projects, such as the Stockton Diamond Grade
Separation Project, that can connect an improved ACE service within
the future California High-Speed Rail System Phase 2 extension to
Sacramento.
---------------------------------------------------------------------------
1. NEPA;
2. Council on Environmental Quality regulations;
3. Fixing America's Surface Transportation Act (FAST Act);
4. Department of Transportation Act of 1966, Section 4(f);
5. Land and Water Conservation Fund (LWCF) Act of 1965, Section
6(f);
6. Clean Air Act Amendments of 1990;
7. Clean Water Act of 1977 and 1987;
8. Endangered Species Act of 1973;
9. Migratory Bird Treaty Act;
10. National Historic Preservation Act of 1966, as amended;
11. Executive Order 11990, Protection of Wetlands;
12. Executive Order 11988, Floodplain Management;
13. Executive Order 12898, Federal Actions to Address Environmental
Justice in Minority Populations and Low-Income Populations; and
14. Executive Order 13112, Invasive Species.
Issued in Washington, DC.
Jamie P. Rennert,
Director, Office of Infrastructure Investment.
[FR Doc. 2022-17956 Filed 8-19-22; 8:45 am]
BILLING CODE 4910-06-P