Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4 Inspections, Tests, Analyses, and Acceptance Criteria, 50126-50127 [2022-17421]
Download as PDF
50126
Federal Register / Vol. 87, No. 156 / Monday, August 15, 2022 / Notices
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2022–17418 Filed 8–12–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc.; Vogtle Electric Generating Plant,
Units 3 and 4 Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that specified inspections, tests, and
analyses have been successfully
completed, and that specified
acceptance criteria are met for the
Vogtle Electric Generating Plant (VEGP),
Units 3 and 4.
DATES: Determinations of the successful
completion of inspections, tests, and
analyses for VEGP Units 3 and 4 are
effective on the dates indicated in the
NRC staff’s verification evaluation forms
for the inspections, tests, analyses, and
acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:24 Aug 12, 2022
Jkt 256001
PDR.Resource@nrc.gov. The ADAMS
accession number for each document
referenced in this document (if that
document is available in ADAMS) is
provided the first time that a document
is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8:00 a.m. and 4:00 p.m.
Eastern Time (ET), Monday through
Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
7270, email: Cayetano.Santos@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (hereafter called SNC or
the licensee) has submitted ITAAC
closure notifications (ICNs) under
section 52.99(c)(1) of title 10 of the Code
of Federal Regulations (10 CFR),
informing the NRC that the licensee has
successfully performed the required
inspections, tests, and analyses, and that
the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.02a (13), 2.1.02.05a.i (19),
2.1.02.07b (26), 2.1.02.11a.i (46),
2.1.02.11b.i (48), 2.1.02.11c.i (51),
2.1.02.11c.ii (52), 2.1.02.13c (65),
2.1.03.03 (72), 2.1.03.06.i (75),
2.1.03.09b (83), 2.1.03.12 (87),
2.2.01.05.i (98), 2.2.01.06b (103),
2.2.01.09 (110), 2.2.01.10c (113),
2.2.01.11a.iv (117), 2.2.02.05a.i (126),
2.2.02.06b (133), 2.2.02.07b.i (138),
2.2.02.07f.i (145), 2.2.02.10c (153),
2.2.03.02a (159), 2.2.03.05a.i (165),
2.2.03.07b (172), 2.2.03.08c.x (195),
2.2.03.08c.xiii (198), 2.2.03.10 (206),
2.2.03.11a.i (207), 2.2.03.11b.i (209),
2.2.03.11c.i (212), 2.2.03.11c.ii (213),
2.2.04.05a.i (226), 2.2.04.07b (233),
2.2.04.12a.iii (250), 2.2.05.05a.i (259),
2.2.05.06a (263), 2.2.05.07a.i (265),
2.2.05.07c (270), 2.3.02.06b (296),
2.3.04.04.ii (331), 2.3.04.10 (337),
2.3.05.02.i (340), 2.3.06.02a (355),
2.3.06.07b (368), 2.3.07.06a (399),
2.3.09.02a (421), 2.3.09.02b (422),
2.3.09.03.ii (424), 2.3.09.04b (428),
2.3.10.07a.ii (444), 2.3.11.03b (454),
2.3.11.03c (455), 2.3.13.06b (467),
2.3.19.02a (486), 2.3.29.04 (491),
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
2.4.02.02a (497), 2.4.02.02b (498),
2.5.01.02a (506), 2.5.02.02.i (522),
2.5.02.05a (527), 2.5.02.06a.i (529),
2.5.02.06a.ii (530), 2.5.02.06c.i (532),
2.5.02.08a.ii (540), 2.5.02.08b.ii (543),
2.5.02.09d (548), 2.5.03.02 (555),
2.5.04.02.i (557), 2.5.04.03 (560),
2.6.01.02.i (579), 2.6.01.03a (582),
2.6.01.04d (587), 2.6.01.04e (588),
2.6.02.02a (593), 2.6.02.02b (594),
2.6.02.02c (595), 2.6.03.02.i (597),
2.6.03.04a (601), 2.6.03.04c (603),
2.6.03.04i (609), 2.6.03.07 (616),
2.6.04.02a (622), 2.6.04.02c (624),
2.6.05.02.ii (629), 2.6.09.05c (646),
2.6.09.06 (647), 2.6.09.08 (650),
2.6.09.13a (652), 2.6.09.13c (654),
2.6.09.15a (655), C.2.6.09.07 (667),
C.2.6.09.08a (668), 2.7.01.14 (700),
2.7.02.03a (703), 2.7.05.02.i (719),
2.7.06.03.i (726), 3.1.00.03 (735),
3.2.00.01e (744), 3.2.00.05 (752),
3.2.00.07 (756), 3.2.00.09 (758),
3.3.00.02a.i.b (761), 3.3.00.05b (785),
3.3.00.05c (786), 3.3.00.07aa (789),
3.3.00.07ab (790), 3.3.00.07ac (791),
3.3.00.07ba (792), 3.3.00.07bb (793),
3.3.00.07bc (794), 3.3.00.07c.i.a (795),
3.3.00.07c.i.b (796), 3.3.00.07c.ii.a (797),
3.3.00.07c.ii.b (798), 3.3.00.07d.i (799),
3.3.00.07d.ii.a (800), 3.3.00.07d.ii.b
(801), 3.3.00.07d.ii.c (802),
3.3.00.07d.iii.a (803), 3.3.00.07d.iii.b
(804), 3.3.00.07d.iii.c (805), 3.3.00.08
(813), 3.3.00.14 (820), 3.3.00.16 (821),
3.3.00.17 (822), 3.5.00.01.i (823),
3.5.00.06 (831), E.3.9.01.01.01 (845),
E.3.9.03.00.02 (848), 2.2.05.09c (877),
and 2.3.10.11a (878).
VEGP Unit 4 ITAAC
2.1.02.08d.v (36), 2.2.01.07.i (107),
2.2.01.11a.i (114) 2.2.03.09a.ii (202),
2.3.04.11 (338), 2.3.10.02a (431),
2.5.02.08b.i (542), 3.2.00.02 (745),
3.3.00.02b (770), and 3.3.00.02f (774).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of the
VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure
Notifications (IPCNs)
Since the last Federal Register notice
of the NRC staff’s determinations of
successful completion of inspections,
tests, and analyses for VEGP Units 3 and
4 (87 FR 5866; February 2, 2022), the
NRC staff has not made additional
determinations of the successful
completion of inspections, tests, and
analyses based on licensee IPCNs
submitted under 10 CFR 52.99(c)(2).
E:\FR\FM\15AUN1.SGM
15AUN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 156 / Monday, August 15, 2022 / Notices
III. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs and IPCNs.
Each ICN presents a narrative
description of how the ITAAC was
completed. The NRC’s ICN review
process involves a determination on
whether, among other things: (1) each
ICN provides sufficient information,
including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed. The NRC’s review process for
IPCNs is similar to that for ICNs but
focuses on how the licensee addressed
the new, material information giving
rise to the IPCN.
The NRC staff’s determination of the
successful completion of these ITAAC
for VEGP Unit 3 is final because the
NRC has found pursuant to 10 CFR
52.103(g) that the acceptance criteria in
the VEGP Unit 3 combined license are
met (87 FR 48201; August 8, 2022). As
such, the licensee is allowed to operate
VEGP Unit 3 in accordance with the
terms and conditions of the license. In
accordance with 10 CFR 52.103(h), the
ITAAC in the VEGP Unit 3 licensee no
longer constitute regulatory
requirements.
The NRC staff’s determination of the
successful completion of these ITAAC
for VEGP Unit 4 is based on information
available at this time and is subject to
the licensee’s ability to maintain the
condition that the acceptance criteria
are met. If the NRC staff receives new
information that suggests the NRC staff’s
determination on any of these ITAAC is
incorrect, then the NRC staff will
determine whether to reopen that
ITAAC (including withdrawing the NRC
staff’s determination on that ITAAC).
The NRC staff’s determination will be
used to support a subsequent finding,
pursuant to 10 CFR 52.103(g), at the end
of construction that all acceptance
criteria in the combined license are met.
The ITAAC closure process is not
VerDate Sep<11>2014
17:24 Aug 12, 2022
Jkt 256001
finalized for these ITAAC until the NRC
makes an affirmative finding under 10
CFR 52.103(g). Any future updates to
the status of these ITAAC can be found
by selecting the link ‘‘ITAAC Status
Report’’ on the NRC’s website: https://
www.nrc.gov/reactors/new-reactors/colholder/vog4.html.
This notice fulfills the NRC staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS accession
number for each ICN and IPCN received,
the ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC
can be found by selecting the link
‘‘ITAAC Status Report’’ at the NRC’s
website https://www.nrc.gov/reactors/
new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS accession
number for each ICN and IPCN received,
the ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC,
can be found by selecting the link
‘‘ITAAC Status Report’’ at the NRC’s
website https://www.nrc.gov/reactors/
new-reactors/col-holder/vog4.html.
Dated: August 9, 2022.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Vogtle Project Office, Office of Nuclear
Reactor Regulation.
[FR Doc. 2022–17421 Filed 8–12–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2022–0142]
Report to Congress on Abnormal
Occurrences: Fiscal Year 2021,
Dissemination of Information
Nuclear Regulatory
Commission.
ACTION: NUREG; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing NUREG–
0090, Volume 44, ‘‘Report to Congress
SUMMARY:
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
50127
on Abnormal Occurrences: Fiscal Year
2021.’’ The report describes those events
that the NRC or an Agreement State
identified as abnormal occurrences
(AOs) during fiscal year (FY) 2021,
based on the criteria defined by the
Commission. The report describes six
events at Agreement State-licensed
facilities and two events at NRClicensed facilities.
DATES: NUREG–0090, Volume 44, is
available August 15, 2022.
ADDRESSES: Please refer to Docket ID
NRC–2022–0142 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0142. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. The ADAMS
accession number for each document
referenced (if it is available in ADAMS)
is provided the first time that it is
mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8:00 a.m. and 4:00 p.m.
Eastern Time, Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Kerstun Norman, Office of Nuclear
Regulatory Research, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
5883, email: Kerstun.Norman@nrc.gov.
SUPPLEMENTARY INFORMATION: Section
208 of the Energy Reorganization Act of
1974, as amended (Pub. L. 93–438),
defines an ‘‘abnormal occurrence’’ as an
E:\FR\FM\15AUN1.SGM
15AUN1
Agencies
[Federal Register Volume 87, Number 156 (Monday, August 15, 2022)]
[Notices]
[Pages 50126-50127]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17421]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc.; Vogtle Electric
Generating Plant, Units 3 and 4 Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that specified inspections, tests, and analyses have been
successfully completed, and that specified acceptance criteria are met
for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: Determinations of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 are effective on the dates
indicated in the NRC staff's verification evaluation forms for the
inspections, tests, analyses, and acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the For Further Information
Contact section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between
8:00 a.m. and 4:00 p.m. Eastern Time (ET), Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7270, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (hereafter called SNC or
the licensee) has submitted ITAAC closure notifications (ICNs) under
section 52.99(c)(1) of title 10 of the Code of Federal Regulations (10
CFR), informing the NRC that the licensee has successfully performed
the required inspections, tests, and analyses, and that the acceptance
criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.02a (13), 2.1.02.05a.i (19), 2.1.02.07b (26), 2.1.02.11a.i
(46), 2.1.02.11b.i (48), 2.1.02.11c.i (51), 2.1.02.11c.ii (52),
2.1.02.13c (65), 2.1.03.03 (72), 2.1.03.06.i (75), 2.1.03.09b (83),
2.1.03.12 (87), 2.2.01.05.i (98), 2.2.01.06b (103), 2.2.01.09 (110),
2.2.01.10c (113), 2.2.01.11a.iv (117), 2.2.02.05a.i (126), 2.2.02.06b
(133), 2.2.02.07b.i (138), 2.2.02.07f.i (145), 2.2.02.10c (153),
2.2.03.02a (159), 2.2.03.05a.i (165), 2.2.03.07b (172), 2.2.03.08c.x
(195), 2.2.03.08c.xiii (198), 2.2.03.10 (206), 2.2.03.11a.i (207),
2.2.03.11b.i (209), 2.2.03.11c.i (212), 2.2.03.11c.ii (213),
2.2.04.05a.i (226), 2.2.04.07b (233), 2.2.04.12a.iii (250),
2.2.05.05a.i (259), 2.2.05.06a (263), 2.2.05.07a.i (265), 2.2.05.07c
(270), 2.3.02.06b (296), 2.3.04.04.ii (331), 2.3.04.10 (337),
2.3.05.02.i (340), 2.3.06.02a (355), 2.3.06.07b (368), 2.3.07.06a
(399), 2.3.09.02a (421), 2.3.09.02b (422), 2.3.09.03.ii (424),
2.3.09.04b (428), 2.3.10.07a.ii (444), 2.3.11.03b (454), 2.3.11.03c
(455), 2.3.13.06b (467), 2.3.19.02a (486), 2.3.29.04 (491), 2.4.02.02a
(497), 2.4.02.02b (498), 2.5.01.02a (506), 2.5.02.02.i (522),
2.5.02.05a (527), 2.5.02.06a.i (529), 2.5.02.06a.ii (530), 2.5.02.06c.i
(532), 2.5.02.08a.ii (540), 2.5.02.08b.ii (543), 2.5.02.09d (548),
2.5.03.02 (555), 2.5.04.02.i (557), 2.5.04.03 (560), 2.6.01.02.i (579),
2.6.01.03a (582), 2.6.01.04d (587), 2.6.01.04e (588), 2.6.02.02a (593),
2.6.02.02b (594), 2.6.02.02c (595), 2.6.03.02.i (597), 2.6.03.04a
(601), 2.6.03.04c (603), 2.6.03.04i (609), 2.6.03.07 (616), 2.6.04.02a
(622), 2.6.04.02c (624), 2.6.05.02.ii (629), 2.6.09.05c (646),
2.6.09.06 (647), 2.6.09.08 (650), 2.6.09.13a (652), 2.6.09.13c (654),
2.6.09.15a (655), C.2.6.09.07 (667), C.2.6.09.08a (668), 2.7.01.14
(700), 2.7.02.03a (703), 2.7.05.02.i (719), 2.7.06.03.i (726),
3.1.00.03 (735), 3.2.00.01e (744), 3.2.00.05 (752), 3.2.00.07 (756),
3.2.00.09 (758), 3.3.00.02a.i.b (761), 3.3.00.05b (785), 3.3.00.05c
(786), 3.3.00.07aa (789), 3.3.00.07ab (790), 3.3.00.07ac (791),
3.3.00.07ba (792), 3.3.00.07bb (793), 3.3.00.07bc (794), 3.3.00.07c.i.a
(795), 3.3.00.07c.i.b (796), 3.3.00.07c.ii.a (797), 3.3.00.07c.ii.b
(798), 3.3.00.07d.i (799), 3.3.00.07d.ii.a (800), 3.3.00.07d.ii.b
(801), 3.3.00.07d.ii.c (802), 3.3.00.07d.iii.a (803), 3.3.00.07d.iii.b
(804), 3.3.00.07d.iii.c (805), 3.3.00.08 (813), 3.3.00.14 (820),
3.3.00.16 (821), 3.3.00.17 (822), 3.5.00.01.i (823), 3.5.00.06 (831),
E.3.9.01.01.01 (845), E.3.9.03.00.02 (848), 2.2.05.09c (877), and
2.3.10.11a (878).
VEGP Unit 4 ITAAC
2.1.02.08d.v (36), 2.2.01.07.i (107), 2.2.01.11a.i (114)
2.2.03.09a.ii (202), 2.3.04.11 (338), 2.3.10.02a (431), 2.5.02.08b.i
(542), 3.2.00.02 (745), 3.3.00.02b (770), and 3.3.00.02f (774).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of the VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure Notifications (IPCNs)
Since the last Federal Register notice of the NRC staff's
determinations of successful completion of inspections, tests, and
analyses for VEGP Units 3 and 4 (87 FR 5866; February 2, 2022), the NRC
staff has not made additional determinations of the successful
completion of inspections, tests, and analyses based on licensee IPCNs
submitted under 10 CFR 52.99(c)(2).
[[Page 50127]]
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was
completed. The NRC's ICN review process involves a determination on
whether, among other things: (1) each ICN provides sufficient
information, including a summary of the methodology used to perform the
ITAAC, to demonstrate that the inspections, tests, and analyses have
been successfully completed; (2) each ICN provides sufficient
information to demonstrate that the acceptance criteria of the ITAAC
are met; and (3) any NRC inspections for the ITAAC have been completed
and any ITAAC findings associated with that ITAAC have been closed. The
NRC's review process for IPCNs is similar to that for ICNs but focuses
on how the licensee addressed the new, material information giving rise
to the IPCN.
The NRC staff's determination of the successful completion of these
ITAAC for VEGP Unit 3 is final because the NRC has found pursuant to 10
CFR 52.103(g) that the acceptance criteria in the VEGP Unit 3 combined
license are met (87 FR 48201; August 8, 2022). As such, the licensee is
allowed to operate VEGP Unit 3 in accordance with the terms and
conditions of the license. In accordance with 10 CFR 52.103(h), the
ITAAC in the VEGP Unit 3 licensee no longer constitute regulatory
requirements.
The NRC staff's determination of the successful completion of these
ITAAC for VEGP Unit 4 is based on information available at this time
and is subject to the licensee's ability to maintain the condition that
the acceptance criteria are met. If the NRC staff receives new
information that suggests the NRC staff's determination on any of these
ITAAC is incorrect, then the NRC staff will determine whether to reopen
that ITAAC (including withdrawing the NRC staff's determination on that
ITAAC). The NRC staff's determination will be used to support a
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria in the combined license are
met. The ITAAC closure process is not finalized for these ITAAC until
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future
updates to the status of these ITAAC can be found by selecting the link
``ITAAC Status Report'' on the NRC's website: https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS accession number for each ICN
and IPCN received, the ADAMS accession number for each VEF, and the
ADAMS accession numbers for the inspection reports associated with
these specific ITAAC can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS accession number for each ICN
and IPCN received, the ADAMS accession number for each VEF, and the
ADAMS accession numbers for the inspection reports associated with
these specific ITAAC, can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
Dated: August 9, 2022.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Vogtle Project Office, Office of Nuclear Reactor Regulation.
[FR Doc. 2022-17421 Filed 8-12-22; 8:45 am]
BILLING CODE 7590-01-P