Notice of Availability of the Whitewater River Groundwater Replenishment Facility Project Final Environmental Impact Statement, Riverside County, CA, 49883 [2022-17312]
Download as PDF
Federal Register / Vol. 87, No. 155 / Friday, August 12, 2022 / Notices
Authority
We publish this notice under section
10(c) of the Endangered Species Act of
1973, as amended (16 U.S.C. 1531 et
seq.).
John Tirpak,
Deputy Assistant Regional Director,
Ecological Services Southeast Region.
[FR Doc. 2022–17340 Filed 8–11–22; 8:45 am]
BILLING CODE 4333–15–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLCAD06000.51010000.
ER0000.LVRWB20B6340.20X5017AP.
CACA56753; MO#450059376]
Notice of Availability of the Whitewater
River Groundwater Replenishment
Facility Project Final Environmental
Impact Statement, Riverside County,
CA
AGENCY:
Bureau of Land Management,
Interior.
Notice of availability.
ACTION:
In accordance with the
National Environmental Policy Act
(NEPA) of 1969, as amended, and the
Federal Land Policy and Management
Act of 1976, as amended, the Bureau of
Land Management (BLM) has prepared
a final environmental impact statement
(EIS) for the Whitewater River
Groundwater Replenishment Facility
Project (Project), and by this notice is
announcing the availability of the final
EIS for a 30-day review period.
DATES: The BLM will issue a final
decision on the proposal a minimum of
30 days after the date that the
Environmental Protection Agency (EPA)
publishes its notice of availability
(NOA) in the Federal Register. The EPA
usually publishes its NOAs on Fridays.
ADDRESSES: You may review the final
EIS at https://go.usa.gov/x6KsM. Copies
of the Whitewater River Groundwater
Replenishment Facility final EIS are
available at the Palm Springs South
Coast Field Office at 1201 Bird Center
Drive, Palm Springs, CA 92262.
FOR FURTHER INFORMATION CONTACT:
Brandon G. Anderson, BLM Project
Manager, telephone: (760) 422–9120;
email: bganderson@blm.gov; address
Bureau of Land Management, 1201 Bird
Center Drive, Palm Springs, CA 92262.
Persons who use telecommunication
devices for the deaf may call the Federal
Relay Service (FRS) at 1–800–877–8339
to contact the BLM during normal
business hours. The FRS is available 24
hours a day, 7 days a week, to leave a
jspears on DSK121TN23PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:38 Aug 11, 2022
Jkt 256001
message or question. You will receive a
reply during normal business hours.
SUPPLEMENTARY INFORMATION: The
Coachella Valley Water District (CVWD)
seeks a right-of-way (ROW) grant from
the BLM for its existing groundwater
replenishment facility in North Palm
Springs that is partially located on
public lands managed by the BLM. The
existing facility consists of water control
berms, intake structures, conveyance
structures, and 19 infiltration ponds
over approximately 690 acres of BLMmanaged public lands. The facility also
includes 1,480 acres of lands held by
CVWD. No new construction and no
change in operations are proposed. The
change in volume represents CVWD’s
request that the BLM analyze
environmental impacts for the full
annual capacity of the facility, instead
of the anticipated water allotments, as
was done for the previous grant. The
change in acreage represents CVWD’s
request to authorize the use of public
lands for water control berms upstream
of its intake structure.
The Proposed Action (Alternative 1)
is the BLM Preferred Alternative and
would authorize the facility in its
existing configuration, which has the
ability to infiltrate up to 511,000 acrefeet per year, representing the maximum
physical capacity of the facility. In
addition to the Proposed Action, the
final EIS considers a no action
alternative and three action alternatives.
Alternative 2 (Partial Implementation)
would authorize only the area of public
lands on which the water control
structures upstream of the intake are
located. Alternative 3 (Reduced
Volume) would authorize the same
facility as described under Alternative 1
but would limit annual infiltration
volume to 220,000 acre-feet per year.
Alternative 4 (Land Disposal) would
authorize the sale or exchange of the
public lands within the project footprint
and would authorize the facility
operation on public lands for a period
of 10 years, sufficient to implement the
disposal. Alternative 5 (No Action)
would not authorize those portions of
the facility that are located on public
lands. Those portions would be
removed, and the public lands
rehabilitated.
The BLM is the lead agency under
NEPA and will make Federal decisions
regarding the ROW for the Project. The
U.S. Fish and Wildlife Service is a
Cooperating Agency and will issue a
Biological Opinion for the project. The
U.S. Bureau of Indian Affairs, Agua
Caliente Band of Cahuilla Indians,
Desert Water Agency, and Metropolitan
Water District of Southern California are
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
49883
Cooperating Agencies in this
environmental review, but do not have
direct permitting roles in the project.
On June 11, 2021, the BLM published
a draft EIS for a 45-day review period.
The BLM received nine comments
during the public comment process.
Issues raised included: concerns for
ground water quality and quantity,
impacts to listed species, and feasibility
of mitigation measures. These issues are
addressed in the response to comments
and final EIS analysis.
The BLM utilized and coordinated the
NEPA process to help fulfill the public
involvement process under the National
Historic Preservation Act (54 U.S.C.
306108), as provided in 36 CFR
800.2(d)(3).
(Authority: 40 CFR 1506.6; 40 CFR 1506.10)
Erica E. St. Michel,
BLM California Deputy State Director,
Communications.
[FR Doc. 2022–17312 Filed 8–11–22; 8:45 am]
BILLING CODE 4310–40–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLORM00000–L223L1109.AF00000–
223.HAG 22–0021]
Notice of Public Meetings, Western
Oregon Resource Advisory Council
Bureau of Land Management,
Interior.
ACTION: Notice of public meetings.
AGENCY:
In accordance with the
Federal Land Policy and Management
Act and the Federal Advisory
Committee Act of 1972, the U.S.
Department of the Interior, Bureau of
Land Management (BLM) Western
Oregon Resource Advisory Council
(RAC) will meet as follows.
DATES: The Western Oregon RAC will
meet on September 22, 2022; and
October 11 and 13, 2022. Each meeting
will begin at 9 a.m. The September 22
and October 11 meetings will adjourn at
approximately 4 p.m. The October 13
meeting will adjourn at approximately 3
p.m.
ADDRESSES: The meetings will be virtual
meetings held over the Zoom platform.
Please register at least one day in
advance of the meetings. Register for the
September meeting here: https://
blm.zoomgov.com/webinar/register/
WN_fXyuZv68Slalt_PT-pEN9A.
Register for the October meetings
here: https://blm.zoomgov.com/
webinar/register/WN_
iN5MZgFxRaa5h7LKvx-7LQ.
SUMMARY:
E:\FR\FM\12AUN1.SGM
12AUN1
Agencies
[Federal Register Volume 87, Number 155 (Friday, August 12, 2022)]
[Notices]
[Page 49883]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17312]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLCAD06000.51010000.ER0000.LVRWB20B6340.20X5017AP.CACA56753;
MO#450059376]
Notice of Availability of the Whitewater River Groundwater
Replenishment Facility Project Final Environmental Impact Statement,
Riverside County, CA
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act
(NEPA) of 1969, as amended, and the Federal Land Policy and Management
Act of 1976, as amended, the Bureau of Land Management (BLM) has
prepared a final environmental impact statement (EIS) for the
Whitewater River Groundwater Replenishment Facility Project (Project),
and by this notice is announcing the availability of the final EIS for
a 30-day review period.
DATES: The BLM will issue a final decision on the proposal a minimum of
30 days after the date that the Environmental Protection Agency (EPA)
publishes its notice of availability (NOA) in the Federal Register. The
EPA usually publishes its NOAs on Fridays.
ADDRESSES: You may review the final EIS at https://go.usa.gov/x6KsM.
Copies of the Whitewater River Groundwater Replenishment Facility final
EIS are available at the Palm Springs South Coast Field Office at 1201
Bird Center Drive, Palm Springs, CA 92262.
FOR FURTHER INFORMATION CONTACT: Brandon G. Anderson, BLM Project
Manager, telephone: (760) 422-9120; email: [email protected]; address
Bureau of Land Management, 1201 Bird Center Drive, Palm Springs, CA
92262.
Persons who use telecommunication devices for the deaf may call the
Federal Relay Service (FRS) at 1-800-877-8339 to contact the BLM during
normal business hours. The FRS is available 24 hours a day, 7 days a
week, to leave a message or question. You will receive a reply during
normal business hours.
SUPPLEMENTARY INFORMATION: The Coachella Valley Water District (CVWD)
seeks a right-of-way (ROW) grant from the BLM for its existing
groundwater replenishment facility in North Palm Springs that is
partially located on public lands managed by the BLM. The existing
facility consists of water control berms, intake structures, conveyance
structures, and 19 infiltration ponds over approximately 690 acres of
BLM-managed public lands. The facility also includes 1,480 acres of
lands held by CVWD. No new construction and no change in operations are
proposed. The change in volume represents CVWD's request that the BLM
analyze environmental impacts for the full annual capacity of the
facility, instead of the anticipated water allotments, as was done for
the previous grant. The change in acreage represents CVWD's request to
authorize the use of public lands for water control berms upstream of
its intake structure.
The Proposed Action (Alternative 1) is the BLM Preferred
Alternative and would authorize the facility in its existing
configuration, which has the ability to infiltrate up to 511,000 acre-
feet per year, representing the maximum physical capacity of the
facility. In addition to the Proposed Action, the final EIS considers a
no action alternative and three action alternatives. Alternative 2
(Partial Implementation) would authorize only the area of public lands
on which the water control structures upstream of the intake are
located. Alternative 3 (Reduced Volume) would authorize the same
facility as described under Alternative 1 but would limit annual
infiltration volume to 220,000 acre-feet per year. Alternative 4 (Land
Disposal) would authorize the sale or exchange of the public lands
within the project footprint and would authorize the facility operation
on public lands for a period of 10 years, sufficient to implement the
disposal. Alternative 5 (No Action) would not authorize those portions
of the facility that are located on public lands. Those portions would
be removed, and the public lands rehabilitated.
The BLM is the lead agency under NEPA and will make Federal
decisions regarding the ROW for the Project. The U.S. Fish and Wildlife
Service is a Cooperating Agency and will issue a Biological Opinion for
the project. The U.S. Bureau of Indian Affairs, Agua Caliente Band of
Cahuilla Indians, Desert Water Agency, and Metropolitan Water District
of Southern California are Cooperating Agencies in this environmental
review, but do not have direct permitting roles in the project.
On June 11, 2021, the BLM published a draft EIS for a 45-day review
period. The BLM received nine comments during the public comment
process. Issues raised included: concerns for ground water quality and
quantity, impacts to listed species, and feasibility of mitigation
measures. These issues are addressed in the response to comments and
final EIS analysis.
The BLM utilized and coordinated the NEPA process to help fulfill
the public involvement process under the National Historic Preservation
Act (54 U.S.C. 306108), as provided in 36 CFR 800.2(d)(3).
(Authority: 40 CFR 1506.6; 40 CFR 1506.10)
Erica E. St. Michel,
BLM California Deputy State Director, Communications.
[FR Doc. 2022-17312 Filed 8-11-22; 8:45 am]
BILLING CODE 4310-40-P