Combined Notice of Filings #1, 49586-49587 [2022-17260]
Download as PDF
49586
Federal Register / Vol. 87, No. 154 / Thursday, August 11, 2022 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–1378–001.
Applicants: Golden Spread Electric
Cooperative, Inc.
Description: Tariff Amendment: WPC
Sched B Rider H Filing—OEMR
response to be effective 9/1/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5064.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–1869–001.
Applicants: Bishop Hill Energy LLC.
Description: Tariff Amendment:
Response to Deficiency Letter in Docket
ER22–1869–000 to be effective 5/14/
2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5012.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2117–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2022–08–05_SA 3454 Entergy ArkansasFlat Fork Solar Sub 1st Rev GIA (J907
J1434) to be effective 6/2/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5027.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2604–000.
Applicants: Lucky Corridor, LLC.
Description: Baseline eTariff Filing:
Filing of Lucky Corridor OATT to be
effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5009.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2605–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
Section 205 EPC Agreement among
NYISO, KCE, Niagara, Erie, National
Grid SA.2723 to be effective 7/22/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5011.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2606–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
20 to be effective 10/4/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5015.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2607–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
VerDate Sep<11>2014
17:49 Aug 10, 2022
Jkt 256001
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule No. 2 to
be effective 10/4/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5020.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2608–000.
Applicants: MATL LLP.
Description: Request for continued
Negotiated Rate Authorization for
MATL LLP.
Filed Date: 8/2/22.
Accession Number: 20220802–5179.
Comment Date: 5 p.m. ET 8/23/22.
Docket Numbers: ER22–2609–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–08–05_SA 3413 Ameren IL-Cass
County Solar Project 2nd Rev GIA (J859)
to be effective 7/22/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5022.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2610–000.
Applicants: The Potomac Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: The
Potomac Edison Company submits tariff
filing per 35.13(a)(2)(iii: Potomac Edison
submits two ECSAs, SA Nos. 6349 and
6350 to be effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5033.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2611–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3125R12 Basin Electric Power
Cooperative NITSA and NOA to be
effective 8/1/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5042.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2612–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2022–08–05 Transmission Control
Agreement Removing Vernon as PTO to
be effective 10/7/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5059.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2613–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 362-City of
Williams NITS, Amendment No. 2 to be
effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5061.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2614–000.
Applicants: Southern California
Edison Company.
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
Description: Tariff Amendment:
Cancel LA, Desert Sunlight PV (SA282,
TOT198–199) to be effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5070.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2615–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Rate Schedule FERC No.
345 to be effective 7/13/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5073.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2616–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Second Amendment to LGIA, Desert
Sunlight (TOT198–199, SA86) to be
effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5088.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22–2617–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: ISA,
SA No. 6552; Queue Nos. AE2–318/
AF1–045 to be effective 7/7/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5095.
Comment Date: 5 p.m. ET 8/26/22.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF22–826–000.
Applicants: President and Fellows of
Harvard College.
Description: Form 556 of President
and Fellows of Harvard College
[Harvard Allston District Energy
Facility].
Filed Date: 8/5/22.
Accession Number: 20220805–5109.
Comment Date: 5 p.m. ET 8/26/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
E:\FR\FM\11AUN1.SGM
11AUN1
Federal Register / Vol. 87, No. 154 / Thursday, August 11, 2022 / Notices
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 5, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–17260 Filed 8–10–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Dated: August 5, 2022.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2022–17259 Filed 8–10–22; 8:45 am]
Combined Notice of Filings
BILLING CODE 6717–01–P
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
lotter on DSK11XQN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: RP22–1108–000.
Applicants: Empire Pipeline, Inc.
Description: § 4(d) Rate Filing: Empire
Housekeeping August 2022 to be
effective 9/8/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5073.
Comment Date: 5 p.m. ET 8/16/22.
Docket Numbers: RP22–1109–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: § 4(d) Rate Filing:
Housekeeping August 2022 to be
effective 9/8/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5076.
Comment Date: 5 p.m. ET 8/16/22.
Docket Numbers: RP22–1110–000.
Applicants: Pine Prairie Energy
Center, LLC.
Description: § 4(d) Rate Filing: PPEC
Revisions to FERC Gas Tariff to be
effective 9/7/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5099.
Comment Date: 5 p.m. ET 8/16/22.
Docket Numbers: RP22–1111–000.
Applicants: Adelphia Gateway, LLC.
Description: § 4(d) Rate Filing:
Adelphia NRA filing August 2022 to be
effective 8/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805–5026.
Comment Date: 5 p.m. ET 8/17/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
VerDate Sep<11>2014
17:49 Aug 10, 2022
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15281–000]
Solia 1 Hydroelectric, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 22, 2022, Solia 1
Hydroelectric, LLC, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the St. Lawrence County Pumped
Storage Project to be located about 1
mile southwest of the City of Pyrites in
St. Lawrence County, New York. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) a new upper reservoir
with a surface area of 120 acres and a
storage capacity of 4,500 acre-feet at a
maximum pool elevation of 605 feet
mean sea level created through
construction of a new rock-fill dam; (2)
a new lower reservoir consisting of eight
concentric circular tunnels with a
storage capacity of 4,500 acre-feet at a
depth of 2,500 feet below the ground
surface; (3) a new 100-foot outside
diameter, 18-foot inside diameter
‘‘morning glory’’ shaped vertical intake
located in the upper reservoir; (4) a new
2,800-foot-long, 16-foot-diameter
penstock connecting the upper reservoir
and the underground powerhouse; (5) a
new 200-foot-long, 70-foot-wide, 130foot-high underground powerhouse
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
49587
containing two 333-megawatt (MW)
reversible pump-turbines with a total
installed capacity of 666 MW; (6) a new
200- to 500-foot-long, 230-kilovolt (kV)
or 765-kV transmission line connecting
the underground transformer gallery
and the new substation to the existing
grid; (7) a new 200-foot-long, 200-footwide substation; (8) a new pumping
facility for providing initial filling water
and makeup water obtained from the
Grass River located within the eastern
part of the project boundary; and (9)
appurtenant facilities. The proposed
project would have an annual
generation of 1,450 gigawatt-hours.
Applicant Contact: Douglas
Spaulding, Nelson Energy, 8441
Wayzata Blvd., Suite 101, Golden
Valley, MN 55426; phone: (952) 544–
8133.
FERC Contact: Woohee Choi; email:
woohee.choi@ferc.gov; phone: (202)
502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support. In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15281–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–15281) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 87, Number 154 (Thursday, August 11, 2022)]
[Notices]
[Pages 49586-49587]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17260]
[[Page 49586]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER22-1378-001.
Applicants: Golden Spread Electric Cooperative, Inc.
Description: Tariff Amendment: WPC Sched B Rider H Filing--OEMR
response to be effective 9/1/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5064.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-1869-001.
Applicants: Bishop Hill Energy LLC.
Description: Tariff Amendment: Response to Deficiency Letter in
Docket ER22-1869-000 to be effective 5/14/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5012.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2117-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2022-08-05_SA 3454 Entergy Arkansas-
Flat Fork Solar Sub 1st Rev GIA (J907 J1434) to be effective 6/2/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5027.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2604-000.
Applicants: Lucky Corridor, LLC.
Description: Baseline eTariff Filing: Filing of Lucky Corridor OATT
to be effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5009.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2605-000.
Applicants: New York Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Section 205 EPC Agreement
among NYISO, KCE, Niagara, Erie, National Grid SA.2723 to be effective
7/22/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5011.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2606-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 20 to be effective 10/4/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5015.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2607-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
No. 2 to be effective 10/4/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5020.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2608-000.
Applicants: MATL LLP.
Description: Request for continued Negotiated Rate Authorization
for MATL LLP.
Filed Date: 8/2/22.
Accession Number: 20220802-5179.
Comment Date: 5 p.m. ET 8/23/22.
Docket Numbers: ER22-2609-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2022-08-05_SA 3413 Ameren
IL-Cass County Solar Project 2nd Rev GIA (J859) to be effective 7/22/
2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5022.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2610-000.
Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: The Potomac Edison Company
submits tariff filing per 35.13(a)(2)(iii: Potomac Edison submits two
ECSAs, SA Nos. 6349 and 6350 to be effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5033.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2611-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3125R12 Basin Electric Power
Cooperative NITSA and NOA to be effective 8/1/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5042.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2612-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2022-08-05 Transmission
Control Agreement Removing Vernon as PTO to be effective 10/7/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5059.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2613-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Service Agreement No. 362-
City of Williams NITS, Amendment No. 2 to be effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5061.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2614-000.
Applicants: Southern California Edison Company.
Description: Tariff Amendment: Cancel LA, Desert Sunlight PV
(SA282, TOT198-199) to be effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5070.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2615-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Initial Filing of Rate
Schedule FERC No. 345 to be effective 7/13/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5073.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2616-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Second Amendment to LGIA,
Desert Sunlight (TOT198-199, SA86) to be effective 10/5/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5088.
Comment Date: 5 p.m. ET 8/26/22.
Docket Numbers: ER22-2617-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ISA, SA No. 6552; Queue Nos.
AE2-318/AF1-045 to be effective 7/7/2022.
Filed Date: 8/5/22.
Accession Number: 20220805-5095.
Comment Date: 5 p.m. ET 8/26/22.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF22-826-000.
Applicants: President and Fellows of Harvard College.
Description: Form 556 of President and Fellows of Harvard College
[Harvard Allston District Energy Facility].
Filed Date: 8/5/22.
Accession Number: 20220805-5109.
Comment Date: 5 p.m. ET 8/26/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/
[[Page 49587]]
docs-filing/efiling/filing-req.pdf. For other information, call (866)
208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: August 5, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-17260 Filed 8-10-22; 8:45 am]
BILLING CODE 6717-01-P