Tennessee Gas Pipeline Company, L.L.C.; Notice of Application and Establishing Intervention Deadline, 47736-47738 [2022-16710]
Download as PDF
47736
Federal Register / Vol. 87, No. 149 / Thursday, August 4, 2022 / Notices
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before September
27, 2022. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
jspears on DSK121TN23PROD with NOTICES
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP22–491–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
17:25 Aug 03, 2022
Jkt 256001
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP22–491–
000.
To mail via USPS, use the following
address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
To mail via any other courier, use the
following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville,
Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David K. Dewey, Vice
President of Regulatory Affairs for
Natural Gas Pipeline Company of
America LLC, at 2 North Nevada
Avenue, Colorado Springs, Colorado
80903 or david_dewey@
kindermorgan.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–16712 Filed 8–3–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP22–493–000; PF22–2–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Application and
Establishing Intervention Deadline
Take notice that on July 22, 2022
Tennessee Gas Pipeline Company,
L.L.C. (TGP or Applicant), 569
Brookwood Village, Suite 749,
Birmingham, AL 35209 filed an
application under sections 7(c) of the
Natural Gas Act (NGA), and Part 157, of
the Commission’s regulations
authorizing TGP to construct, install,
modify, operate, and maintain certain
pipeline lateral and appurtenant
facilities located in Dickson, Houston
and Stewart Counties, Tennessee all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
Specifically, TGP is requesting
approval to: (1) Construct approximately
32 miles of a new 30-inch-diameter
pipeline lateral, connecting to TGP’s
existing Lines 100–3 and 100–4 and
extending to a delivery point in Stewart
County, Tennessee (Cumberland
Pipeline); (2) install new bi-directional
back pressure regulation facilities near
TGP’s Lines 100–3 and 100–4 (‘‘Pressure
Regulation Station’’), located at the
origin of the proposed Cumberland
Pipeline in Dickson County, Tennessee;
(3) install a new meter station
(‘‘Cumberland Meter Station’’), located
at the terminus of the proposed
Cumberland Pipeline on TVA property
in Stewart County, Tennessee; and (4)
install appurtenant facilities, including
in-line inspection traps at each end of
the proposed Cumberland Pipeline and
three new mainline valves. The total
estimated cost of this project is
approximately $184.8 million.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
E:\FR\FM\04AUN1.SGM
04AUN1
jspears on DSK121TN23PROD with NOTICES
Federal Register / Vol. 87, No. 149 / Thursday, August 4, 2022 / Notices
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the proposed
project should be directed to Tina S.
Hardy, Director, Regulatory Affairs,
Tennessee Gas Pipeline Company,
L.L.C., 569 Brookwood Village, Suite
749, Birmingham, AL 35209 by phone at
(205) 325–3668 or by email to tina_
hardy@kindermorgan.com.
On November 5, 2021 the
Commission granted the Applicant’s
request to utilize the National
Environmental Policy Act (NEPA) PreFiling Process and assigned Docket No.
PF22–2–000 to staff activities involved
in the Project. Now, as of the filing of
the July 22, 2022 application, the PreFiling Process for this project has ended.
From this time forward, this proceeding
will be conducted in Docket No. CP22–
493–000 as noted in the caption of this
Notice.
Also, Applicant stated that a water
quality certificate under section 401 of
the Clean Water Act is required for the
project from the Tennessee Department
of Environmental Conservation. The
request for certification must be
submitted to the certifying agency and
to the Commission concurrently. Proof
of the certifying agency’s receipt date
must be filed no later than five (5) days
after the request is submitted to the
certifying agency.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
17:25 Aug 03, 2022
Jkt 256001
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5 p.m. Eastern
Time on August 19, 2022.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before August 19, 2022.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
reference the Project docket number
CP22–493–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You may file a paper copy of your
comments by mailing them to the
following address below.2 Your written
comments must reference the Project
docket number (CP22–493–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
The Commission encourages
electronic filing of comments (options 1
2 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
47737
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is August 19,
2022. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP22–493–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
3 18
CFR 385.102(d).
CFR 385.214.
5 18 CFR 157.10.
4 18
E:\FR\FM\04AUN1.SGM
04AUN1
47738
Federal Register / Vol. 87, No. 149 / Thursday, August 4, 2022 / Notices
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the Project
docket number CP22–493–000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
jspears on DSK121TN23PROD with NOTICES
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail or email
at: Tina S. Hardy, Director, Regulatory
Affairs, Tennessee Gas Pipeline
Company, L.L.C. 569 Brookwood
Village, Suite 749, Birmingham, AL
35209 or by email at tina_hardy@
kindermorgan.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
17:25 Aug 03, 2022
Jkt 256001
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at https://
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on August 19, 2022.
Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–16710 Filed 8–3–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2715–026]
Kaukauna Utilities; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2715–026.
c. Date filed: July 22, 2022.
d. Applicant: Kaukauna Utilities.
e. Name of Project: Combined Locks
Hydroelectric Project (Combined Locks
Project).
f. Location: On the Lower Fox River
in the Village of Combined Locks and
the Village of Little Chute, Outagamie
County, Wisconsin. The project does not
include any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
h. Applicant Contact: Zachary
Moureau, Environmental & Compliance
Manager, Kaukauna Utilities, 777 Island
Street, Kaukauna, WI 54130–7077; (920)
462–0238; zmoureau@ku-wi.org.
i. FERC Contact: Patrick Ely at
patrick.ely@ferc.gov or (202) 502–8570.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: September 20, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–2715–
026.
m. The application is not ready for
environmental analysis at this time.
n. The Combined Locks Project
consists of: (1) a concrete and cyclopean
stone dam approximately 654 feet long
and 27 feet high with additional 24 inch
nominal flashboards mounted upon the
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 87, Number 149 (Thursday, August 4, 2022)]
[Notices]
[Pages 47736-47738]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-16710]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP22-493-000; PF22-2-000]
Tennessee Gas Pipeline Company, L.L.C.; Notice of Application and
Establishing Intervention Deadline
Take notice that on July 22, 2022 Tennessee Gas Pipeline Company,
L.L.C. (TGP or Applicant), 569 Brookwood Village, Suite 749,
Birmingham, AL 35209 filed an application under sections 7(c) of the
Natural Gas Act (NGA), and Part 157, of the Commission's regulations
authorizing TGP to construct, install, modify, operate, and maintain
certain pipeline lateral and appurtenant facilities located in Dickson,
Houston and Stewart Counties, Tennessee all as more fully set forth in
the application which is on file with the Commission and open for
public inspection.
Specifically, TGP is requesting approval to: (1) Construct
approximately 32 miles of a new 30-inch-diameter pipeline lateral,
connecting to TGP's existing Lines 100-3 and 100-4 and extending to a
delivery point in Stewart County, Tennessee (Cumberland Pipeline); (2)
install new bi-directional back pressure regulation facilities near
TGP's Lines 100-3 and 100-4 (``Pressure Regulation Station''), located
at the origin of the proposed Cumberland Pipeline in Dickson County,
Tennessee; (3) install a new meter station (``Cumberland Meter
Station''), located at the terminus of the proposed Cumberland Pipeline
on TVA property in Stewart County, Tennessee; and (4) install
appurtenant facilities, including in-line inspection traps at each end
of the proposed Cumberland Pipeline and three new mainline valves. The
total estimated cost of this project is approximately $184.8 million.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended
[[Page 47737]]
access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
2020. For assistance, contact the Federal Energy Regulatory Commission
at [email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding the proposed project should be directed to
Tina S. Hardy, Director, Regulatory Affairs, Tennessee Gas Pipeline
Company, L.L.C., 569 Brookwood Village, Suite 749, Birmingham, AL 35209
by phone at (205) 325-3668 or by email to [email protected].
On November 5, 2021 the Commission granted the Applicant's request
to utilize the National Environmental Policy Act (NEPA) Pre-Filing
Process and assigned Docket No. PF22-2-000 to staff activities involved
in the Project. Now, as of the filing of the July 22, 2022 application,
the Pre-Filing Process for this project has ended. From this time
forward, this proceeding will be conducted in Docket No. CP22-493-000
as noted in the caption of this Notice.
Also, Applicant stated that a water quality certificate under
section 401 of the Clean Water Act is required for the project from the
Tennessee Department of Environmental Conservation. The request for
certification must be submitted to the certifying agency and to the
Commission concurrently. Proof of the certifying agency's receipt date
must be filed no later than five (5) days after the request is
submitted to the certifying agency.
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: you can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5 p.m. Eastern Time on August 19, 2022.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before August 19, 2022.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number CP22-493-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You may file a paper copy of your comments by mailing them to
the following address below.\2\ Your written comments must reference
the Project docket number (CP22-493-000).
---------------------------------------------------------------------------
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is August 19, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP22-493-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov)
[[Page 47738]]
under the link to Documents and Filings. New eFiling users must first
create an account by clicking on ``eRegister.'' You will be asked to
select the type of filing you are making; first select ``General'' and
then select ``Intervention.'' The eFiling feature includes a document-
less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below.\6\
Your motion to intervene must reference the Project docket number CP22-
493-000.
---------------------------------------------------------------------------
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Motions to intervene must be served on the applicant either by mail
or email at: Tina S. Hardy, Director, Regulatory Affairs, Tennessee Gas
Pipeline Company, L.L.C. 569 Brookwood Village, Suite 749, Birmingham,
AL 35209 or by email at [email protected]. Any subsequent
submissions by an intervenor must be served on the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the service list at the eService link on FERC Online.
Service can be via email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at https://www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on August 19, 2022.
Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-16710 Filed 8-3-22; 8:45 am]
BILLING CODE 6717-01-P