Notice of Effectiveness of Exempt Wholesale Generator Status, 16724 [2022-06240]

Download as PDF 16724 Federal Register / Vol. 87, No. 57 / Thursday, March 24, 2022 / Notices other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 18, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–06238 Filed 3–23–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Docket No. El Sauz Ranch Wind, LLC ............ Northern Wind Energy Redevelopment, LLC. Red Barn Energy, LLC .................. Rock Aetna Power Partners, LLC Arrow Canyon Solar, LLC ............. Flower Valley II LLC ...................... Mesa Wind Power LLC ................. AM Wind Repower LLC ................. Mulligan Solar, LLC ....................... Lancaster Area Battery Storage, LLC. EG22–27–000 EG22–28–000 EG22–29–000 EG22–30–000 EG22–31–000 EG22–32–000 EG22–33–000 EG22–34–000 EG22–35–000 EG22–36–000 Dated: March 18, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–06240 Filed 3–23–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings khammond on DSKJM1Z7X2PROD with NOTICES Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP22–707–000. Applicants: KPC Pipeline, LLC. Description: § 4(d) Rate Filing: Negotiated Rate Filing to be effective 4/ 1/2022. Filed Date: 3/18/22. Accession Number: 20220318–5033. Comment Date: 5 p.m. ET 3/30/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 17:39 Mar 23, 2022 Dated: March 18, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–06237 Filed 3–23–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–78–000] Take notice that during the month of February 2022, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2021). VerDate Sep<11>2014 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Jkt 256001 ANR Pipeline Company; Notice of Availability of the Final Environmental Impact Statement for the Proposed Wisconsin Access Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a final environmental impact statement (EIS) for the Wisconsin Access Project, proposed by ANR Pipeline Company (ANR) in the above-referenced docket. ANR requests authorization to modify seven existing meter stations in Oneida, Marathon, Oconto, and Manitowoc Counties, Wisconsin and increase firm transportation capacity on its pipeline by 50,707 dekatherms per day. The final EIS assesses the potential environmental effects of the construction and operation of the Wisconsin Access Project in accordance with the requirements of the National Environmental Policy Act. FERC staff concludes that approval of the Project would not result in significant environmental impacts, with the exception of climate change impacts, where staff find the annual operation and downstream greenhouse gas emissions from the project would exceed the Commission’s presumptive significance threshold based on 100 percent utilization. The final EIS addresses the potential environmental effects of the construction and operation of minor PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 modifications to ANR’s existing Coleman, Lena, Meeme, Mosinee, Rhinelander, Suring, and Two Rivers Meter Stations. The modifications include the replacement of some metering and filtering equipment, installation of additional metering equipment, and replacement of two meter station buildings at the Lena and Rhinelander Meter Stations. The Commission mailed a copy of the Notice of Availability of the Final Environmental Impact Statement for the Wisconsin Access Project to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The final EIS is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the natural gas environmental documents page (https://www.ferc.gov/industriesdata/natural-gas/environment/ environmental-documents). In addition, the final EIS may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https:// elibrary.ferc.gov/eLibrary/search), select ‘‘General Search,’’ and enter the docket number in the ‘‘Docket Number’’ field (i.e., CP21–78). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: March 18, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–06232 Filed 3–23–22; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\24MRN1.SGM 24MRN1

Agencies

[Federal Register Volume 87, Number 57 (Thursday, March 24, 2022)]
[Notices]
[Page 16724]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-06240]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


 Notice of Effectiveness of Exempt Wholesale Generator Status

 
------------------------------------------------------------------------
                                                     Docket No.
------------------------------------------------------------------------
El Sauz Ranch Wind, LLC..................  EG22-27-000
Northern Wind Energy Redevelopment, LLC..  EG22-28-000
Red Barn Energy, LLC.....................  EG22-29-000
Rock Aetna Power Partners, LLC...........  EG22-30-000
Arrow Canyon Solar, LLC..................  EG22-31-000
Flower Valley II LLC.....................  EG22-32-000
Mesa Wind Power LLC......................  EG22-33-000
AM Wind Repower LLC......................  EG22-34-000
Mulligan Solar, LLC......................  EG22-35-000
Lancaster Area Battery Storage, LLC......  EG22-36-000
------------------------------------------------------------------------

    Take notice that during the month of February 2022, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 366.7(a) 
(2021).

    Dated: March 18, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-06240 Filed 3-23-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.