Combined Notice of Filings #1, 15982-15983 [2022-05886]
Download as PDF
15982
Federal Register / Vol. 87, No. 54 / Monday, March 21, 2022 / Notices
Adoption of Voluntary Voting System
Guidelines (VVSG) Lifecycle Policy 1.0.
DATES: Tuesday, April 5, 2022, 1 p.m.–
2 p.m. Eastern.
ADDRESSES: Virtual via Zoom.
The official meeting is open to the
public and will be livestreamed on the
U.S. Election Assistance Commission
YouTube Channel: https://
www.youtube.com/channel/UCpN6i0g2r
lF4ITWhwvBwwZw.
khammond on DSKJM1Z7X2PROD with NOTICES
FOR FURTHER INFORMATION CONTACT:
Kristen Muthig, Telephone: (202) 897–
9285, Email: kmuthig@eac.gov.
SUPPLEMENTARY INFORMATION:
Purpose: In accordance with the
Government in the Sunshine Act
(Sunshine Act), Public Law 94–409, as
amended (5 U.S.C. 552b), the U.S.
Election Assistance Commission (EAC)
will conduct an official meeting on the
Voluntary Voting System Guidelines
(VVSG) Lifecycle Policy 1.0.
Agenda: The U.S. Election Assistance
Commission (EAC) will hear a
presentation about the Voluntary Voting
System Guidelines (VVSG) Lifecycle
Policy 1.0 from EAC Testing and
Certification Program Director Jon Panek
and will consider the VVSG Lifecycle
Policy 1.0 for adoption. The meeting
will also include an update on VVSG
2.0 implementation.
The full agenda will be posted in
advance on the EAC website: https://
www.eac.gov.
Background: The Federal Election
Commission published the first two sets
of federal standards in 1990 and 2002.
The EAC then adopted Version 1.0 of
the VVSG on December 13, 2005 and on
March 31, 2015, the EAC
Commissioners unanimously approved
VVSG 1.1. On February 10, 2021, the
EAC Commissioners unanimously
approved the most recent iteration,
VVSG 2.0.
Since the approval of VVSG 2.0, the
EAC has worked on next steps and
materials so these standards and
requirements can be implemented, and
new voting systems can be
manufactured and tested to those
standards. Part of those materials is the
VVSG Lifecycle Policy 1.0.
The intent of the VVSG Lifecycle
Policy 1.0 is to help facilitate migration
to new VVSG standards by providing
guidance on the types of version
changes, Voting System Test Laboratory
(VSTL) accreditation, deprecation of
obsolete major standards, and
establishing a periodic review timeline
for new standards going forward. The
policy defines changes that may be
made to systems certified to deprecated
standards and describes the process for
VerDate Sep<11>2014
21:01 Mar 18, 2022
Jkt 256001
updating the standards as defined in the
Help America Vote Act (HAVA).
A public comment period on the
Lifecycle Policy was available from
November 9 to December 7, 2021. The
EAC also gathered feedback from its
advisory boards in 2021.
Status: This meeting will be open to
the public.
Amanda Joiner,
Acting General Counsel, U.S. Election
Assistance Commission.
[FR Doc. 2022–06025 Filed 3–17–22; 4:15 pm]
BILLING CODE P
DEPARTMENT OF ENERGY
[Certification Notice—259]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity,
Department of Energy (DOE).
ACTION: Notice of filing.
AGENCY:
On February 22, 2022,
Alabama Power Company (Alabama
Power), as owner and operator of a new
baseload power plant, submitted a coal
capability self-certification to the
Department of Energy (DOE) for the
Barry 8 unit at the Barry Electric Power
Plant. The Powerplant and Industrial
Fuel Use Act of 1978, as amended, and
regulations thereunder require DOE to
publish a notice of filing of selfcertification in the Federal Register.
ADDRESSES: Copies of self-certification
filings are available for public
inspection, upon request, in the Office
of Electricity, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW, Washington,
DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–5260
or Christopher.lawrence@hq.doe.gov.
SUPPLEMENTARY INFORMATION: On
February 22, 2022, Alabama Power, as
owner and operator of a new baseload
power plant, submitted a coal capability
self-certification to DOE pursuant to
section 201(d) of the Powerplant and
Industrial Fuel Use Act of 1978 (FUA),
as amended (42 U.S.C. 8311(d)), and
DOE regulations at 10 CFR 501.61(a).
The FUA and regulations thereunder
require DOE to publish a notice of filing
of self-certification in the Federal
Register within fifteen days. See 42
U.S.C. 8311(d)(1); 10 CFR 501.61(c).
Section 201(a) of the FUA provides that
‘‘no new electric powerplant may be
constructed or operated as a base load
powerplant without the capability to
SUMMARY:
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
use coal or another alternate fuel as a
primary energy source.’’ 42 U.S.C.
8311(a). Pursuant to section 201(d) of
the FUA, in order to meet the
requirement of coal capability, the
owner or operator of such a facility
proposing to use natural gas or
petroleum as its primary energy source
must certify to the Secretary of Energy
(Secretary), prior to construction or
prior to operation as a baseload
powerplant, that such powerplant has
the capability to use coal or another
alternate fuel. See 42 U.S.C. 8311(d)(1).
Such certification establishes
compliance with FUA section 201(a) as
of the date it is filed with the Secretary.
Id.; 10 CFR 501.61(b).
The following owner of a proposed
new baseload electric generating
powerplant has filed a self-certification
of coal capability with DOE pursuant to
FUA section 201(d) and in accordance
with DOE regulations at 10 CFR 501.61:
Owner: Alabama Power Company.
Design Capacity: 743 megawatts
(MW).
Fuel To Be Used: Natural Gas.
Plant Location: 15300 Highway 43
North, Bucks, AL 36512.
In-Service Date: November 2023.
Signed in Washington, DC, on March 15,
2022.
Christopher Lawrence,
Management and Program Analyst, Office of
Electricity.
[FR Doc. 2022–05861 Filed 3–18–22; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–62–000.
Applicants: LeConte Energy Storage,
LLC.
Description: LeConte Energy Storage,
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 3/15/22.
Accession Number: 20220315–5101.
Comment Date: 5 p.m. ET 4/5/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–2471–004.
Applicants: NedPower Mount Storm,
LLC.
Description: Refund Report:
NedPower Mount Storm LLC submits
tariff filing per 35.19a(b): Refund Report
to be effective N/A.
E:\FR\FM\21MRN1.SGM
21MRN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 54 / Monday, March 21, 2022 / Notices
Filed Date: 3/15/22.
Accession Number: 20220315–5001.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–821–002.
Applicants: Spotlight Power LLC.
Description: Tariff Amendment: 2nd
Amended Spotlight Power LLC Baseline
MBR Tariff & Application (ER22–821–)
to be effective 3/16/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5193.
Comment Date: 5 p.m. ET 3/25/22.
Docket Numbers: ER22–991–001.
Applicants: PPL Electric Utilities
Corporation, PJM Interconnection,
L.L.C.
Description: Tariff Amendment: PPL
Electric Utilities Corporation submits
tariff filing per 35.17(b): PPL Electric
submits Amendment to OATT, Att.
M–2 in Docket No. ER22–991 to be
effective 4/4/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5133.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1114–001.
Applicants: Public Service Company
of New Mexico.
Description: Tariff Amendment:
Supplement to Rate Schedule No. 144 to
be effective 3/1/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5209.
Comment Date: 5 p.m. ET 3/22/22.
Docket Numbers: ER22–1309–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii): 2022–03–15_SA 2793
ATC-City of Eagle River 2nd Rev CFA to
be effective 5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5053.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1310–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii): 2022–03–15_SA 2768
ATC-City of Plymouth 2nd Rev CFA to
be effective 5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5055.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1312–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
VerDate Sep<11>2014
21:01 Mar 18, 2022
Jkt 256001
35.13(a)(2)(iii): 2022–03–15_SA 2776
ATC-Village of Prairie du Sac 2nd Rev
CFA to be effective 5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5058.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1324–000.
Applicants: LeConte Energy Storage,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization.
Filed Date: 3/15/22.
Accession Number: 20220315–5090.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1332–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii): 2022–03–15_SA 2804
ATC-City of Richland Center 2nd Rev
CFA to be effective 5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5108.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1338–000.
Applicants: Duke Energy Ohio, Inc.,
Duke Energy Kentucky, Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Duke Energy Ohio, Inc. submits tariff
filing per 35.13(a)(2)(iii): DEOK submits
revisions to OATT Attachment H–22A
to be effective 5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5149.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1344–000.
Applicants: Dominion Energy South
Carolina, Inc.
Description: § 205(d) Rate Filing:
Depreciation Rates to be effective
9/1/2021.
Filed Date: 3/15/22.
Accession Number: 20220315–5183.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22–1346–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 349, Concurrence to PNM
RS No. 177 to be effective 3/8/2022.
Filed Date: 3/15/22.
Accession Number: 20220315–5211.
Comment Date: 5 p.m. ET 4/5/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
15983
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 15, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–05886 Filed 3–18–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–6–000]
Spire Storage West, LLC.; Notice of
Availability of the Final Environmental
Impact Statement for the Proposed
Clear Creek Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission), with the participation of
the U.S. Bureau of Land Management
(BLM) as a cooperating agency as
described below, has prepared a final
environmental impact statement (EIS)
for the Clear Creek Expansion Project
(Project) proposed by Spire Storage
West, LLC (Spire). Spire requests
authorization to expand natural gas
storage at its existing Clear Creek
Storage Field, modify the Clear Creek
Plant to increase compression,
decommission and remove facilities
from the Clear Creek Plant, and move
natural gas liquid storage and fueling
equipment to an existing tank pad. Spire
further proposes to construct pipeline
connections north to the Canyon Creek
Plant and south to the Kern River Gas
Transmission mainline. All Project
components are proposed in Uinta
County, Wyoming.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). As
described in the final EIS, the FERC staff
concludes that approval of the Project
would result in some adverse
environmental impacts; however, these
impacts would be reduced to less-thansignificant levels because of the impact
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 87, Number 54 (Monday, March 21, 2022)]
[Notices]
[Pages 15982-15983]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-05886]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG22-62-000.
Applicants: LeConte Energy Storage, LLC.
Description: LeConte Energy Storage, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 3/15/22.
Accession Number: 20220315-5101.
Comment Date: 5 p.m. ET 4/5/22.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-2471-004.
Applicants: NedPower Mount Storm, LLC.
Description: Refund Report: NedPower Mount Storm LLC submits tariff
filing per 35.19a(b): Refund Report to be effective N/A.
[[Page 15983]]
Filed Date: 3/15/22.
Accession Number: 20220315-5001.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-821-002.
Applicants: Spotlight Power LLC.
Description: Tariff Amendment: 2nd Amended Spotlight Power LLC
Baseline MBR Tariff & Application (ER22-821-) to be effective 3/16/
2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5193.
Comment Date: 5 p.m. ET 3/25/22.
Docket Numbers: ER22-991-001.
Applicants: PPL Electric Utilities Corporation, PJM
Interconnection, L.L.C.
Description: Tariff Amendment: PPL Electric Utilities Corporation
submits tariff filing per 35.17(b): PPL Electric submits Amendment to
OATT, Att. M-2 in Docket No. ER22-991 to be effective 4/4/2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5133.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1114-001.
Applicants: Public Service Company of New Mexico.
Description: Tariff Amendment: Supplement to Rate Schedule No. 144
to be effective 3/1/2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5209.
Comment Date: 5 p.m. ET 3/22/22.
Docket Numbers: ER22-1309-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): 2022-
03-15_SA 2793 ATC-City of Eagle River 2nd Rev CFA to be effective 5/15/
2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5053.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1310-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): 2022-
03-15_SA 2768 ATC-City of Plymouth 2nd Rev CFA to be effective 5/15/
2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5055.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1312-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): 2022-
03-15_SA 2776 ATC-Village of Prairie du Sac 2nd Rev CFA to be effective
5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5058.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1324-000.
Applicants: LeConte Energy Storage, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization.
Filed Date: 3/15/22.
Accession Number: 20220315-5090.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1332-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): 2022-
03-15_SA 2804 ATC-City of Richland Center 2nd Rev CFA to be effective
5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5108.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1338-000.
Applicants: Duke Energy Ohio, Inc., Duke Energy Kentucky, Inc., PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Duke Energy Ohio, Inc.
submits tariff filing per 35.13(a)(2)(iii): DEOK submits revisions to
OATT Attachment H-22A to be effective 5/15/2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5149.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1344-000.
Applicants: Dominion Energy South Carolina, Inc.
Description: Sec. 205(d) Rate Filing: Depreciation Rates to be
effective 9/1/2021.
Filed Date: 3/15/22.
Accession Number: 20220315-5183.
Comment Date: 5 p.m. ET 4/5/22.
Docket Numbers: ER22-1346-000.
Applicants: Tucson Electric Power Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 349,
Concurrence to PNM RS No. 177 to be effective 3/8/2022.
Filed Date: 3/15/22.
Accession Number: 20220315-5211.
Comment Date: 5 p.m. ET 4/5/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 15, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-05886 Filed 3-18-22; 8:45 am]
BILLING CODE 6717-01-P