PJM Interconnection, L.L.C.; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 14528 [2022-05424]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES 14528 Federal Register / Vol. 87, No. 50 / Tuesday, March 15, 2022 / Notices Solar 4, LLC, Maverick Solar, LLC, Desert Harvest II LLC, Desert Harvest, LLC, Catalina Solar Lessee, LLC, BigBeau Solar, LLC. Description: Notice of Change in Status of Big Beau Solar, LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5269. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER22–1229–000. Applicants: MATL LLP. Description: Compliance filing: Resubmittal of Compliance FIling Order 676–J (RM05–5) to be effective 12/31/ 9998. Filed Date: 3/9/22. Accession Number: 20220309–5040. Comment Date: 5 p.m. ET 3/30/22. Docket Numbers: ER22–1230–000. Applicants: Public Service Company of Colorado. Description: Tariff Amendment: 2022–03–09 PSC WAPA NOC-Malta SS Maint 319–0.0.0 to be effective 3/10/ 2022. Filed Date: 3/9/22. Accession Number: 20220309–5060. Comment Date: 5 p.m. ET 3/30/22. Docket Numbers: ER22–1231–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Dothan Solar (Dothan Solar & Storage) LGIA Filing to be effective 2/23/2022. Filed Date: 3/9/22. Accession Number: 20220309–5085. Comment Date: 5 p.m. ET 3/30/22. Docket Numbers: ER22–1232–000. Applicants: Basin Electric Power Cooperative. Description: § 205(d) Rate Filing: Basin Electric Amendment to Balancing Authority Services Agreement with WAPA–RMR to be effective 5/9/2022. Filed Date: 3/9/22. Accession Number: 20220309–5090. Comment Date: 5 p.m. ET 3/30/22. Docket Numbers: ER22–1234–000. Applicants: Northern States Power Company, a Wisconsin corporation, Northern States Power Company, a Minnesota corporation. Description: § 205(d) Rate Filing: Northern States Power Company, a Wisconsin corporation submits tariff filing per 35.13(a)(2)(iii: 2022 Interchange Agreement Annual Filing to be effective 1/1/2022. Filed Date: 3/9/22. Accession Number: 20220309–5124. Comment Date: 5 p.m. ET 3/30/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ VerDate Sep<11>2014 21:10 Mar 14, 2022 Jkt 256001 fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 9, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–05423 Filed 3–14–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL22–32–000] PJM Interconnection, L.L.C.; Notice of Institution of Section 206 Proceeding and Refund Effective Date On February 28, 2022, the Commission issued an order in Docket No. EL22–32–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, instituting an investigation into whether PJM Interconnection, L.L.C.’s existing Financial Transmission Right (FTR) Credit Requirement is unjust, unreasonable, unduly discriminatory or preferential, or otherwise unlawful. PJM Interconnection, L.L.C., 178 FERC ¶ 61,146 (2021). The refund effective date in Docket No. EL22–32–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL22–32–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2021), within 21 days of the date of issuance of the order. In addition to publishing the full text of this document in the Federal Register, the Commission provides all PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFile’’ link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Dated: March 9, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–05424 Filed 3–14–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–113–000] Alliance Pipeline, L.P.; Supplemental Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Three Rivers Interconnection Project, Request for Comments on Environmental Issues, and Schedule for Environmental Review On February 10, 2022 the staff of the Office of Energy Projects issued a Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Three Rivers Interconnection Project, Request for Comments on Environmental Issues, and Schedule for Environmental Review. It has come to our attention that intended recipients may not have received the aforementioned notice. As such, we are E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 87, Number 50 (Tuesday, March 15, 2022)]
[Notices]
[Page 14528]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-05424]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL22-32-000]


PJM Interconnection, L.L.C.; Notice of Institution of Section 206 
Proceeding and Refund Effective Date

    On February 28, 2022, the Commission issued an order in Docket No. 
EL22-32-000, pursuant to section 206 of the Federal Power Act (FPA), 16 
U.S.C. 824e, instituting an investigation into whether PJM 
Interconnection, L.L.C.'s existing Financial Transmission Right (FTR) 
Credit Requirement is unjust, unreasonable, unduly discriminatory or 
preferential, or otherwise unlawful. PJM Interconnection, L.L.C., 178 
FERC ] 61,146 (2021).
    The refund effective date in Docket No. EL22-32-000, established 
pursuant to section 206(b) of the FPA, will be the date of publication 
of this notice in the Federal Register.
    Any interested person desiring to be heard in Docket No. EL22-32-
000 must file a notice of intervention or motion to intervene, as 
appropriate, with the Federal Energy Regulatory Commission, in 
accordance with Rule 214 of the Commission's Rules of Practice and 
Procedure, 18 CFR 385.214 (2021), within 21 days of the date of 
issuance of the order.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFile'' link at 
https://www.ferc.gov. In lieu of electronic filing, you may submit a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.

    Dated: March 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-05424 Filed 3-14-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.